===== PDF PAGE 91 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE | AGENDA ITEM SUMMARY ITEM TITLE: ral AGENDA ITEM NUMBER: L th Resolution No, 19-R-0023 - IDOT Local Agency Agreement for Federal Participation for Construction Cost for the Forest Avenue Resurfacing Project COMMITTEE AGENDA DATE: May 2, 2019 COUNCIL AGENDA DATE: May 6, 2019 FILE NUMBER: Resolution No. 19-R-0024 — IDOT Resolution for Improvement Under the Illinois Highway Code for Use of Motor Fuel Tax Funds as City’s Local Share of Construction Costs for the Forest Avenue Resurfacing Project STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works sone LLL APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The Forest Avenue Resurfacing Project mainly consists of roadway resurfacing with sidewalk curb ramp upgrades, minor infill of sidewalk gap, intermittent curb and gutter replacement, new street lighting, and pavement markings, of Forest Avenue between Joliet Street and Illinois Route 59 (Neltnor Boulevard). See attached map for additional clarification. With final design plans and specifications completed, IDOT’s letting occurred on Friday, April 26, 2019. The engineer's estimate of construction cost for said project is $620,198.19. The apparent low bidder (to be confirmed by IDOT through its vetting process) is J.A. Johnson Paving Company of Arlington Heights, Illinois, who submitted a bid of $581,926.97. Pending contract award by IDOT, construction is anticipated to commence in July 2019. Fifty percent (50%) of construction costs (not to exceed $282,385.00 per the attached Local Agency Agreement) are to be funded through the Surface Transportation Program (STP) grant, which is Federal funding administered by the Illinois Department of Transportation (IDOT). Therefore, IDOT forms and contracts must be utilized and IDOT procedures must be strictly observed and followed. Given such, the City of West Chicago must execute a Local Public Agency Agreement for Federal Participation (BLR 05310) with the IDOT (see attached). Said Agreement must be executed and returned to IDOT prior to the project’s bid award and commencement of construction. Please note that the Local Agency Agreement as written is based on an engineer’s cost estimate of $564,770.00, which was generated as part of the funding application process, which was submitted prior to completion of actual design services. Given the bids received, IDOT’s participation share of the project is anticipated to be $282,385.00 and the balance of $299,541.97 will be City’s responsibility. The City’s share of the project’s construction costs will be funded with Motor Fuel Tax funds (01-09-26-4807) in which $727,000.00 has been budgeted for street improvements in FY2019. Use of Motor Fuel Tax funds as the City’s local share of construction costs requires an IDOT Resolution for Improvement Under the Illinois Highway Code (BLR 09110) to be executed by the City Clerk and submitted to IDOT (see attached). ===== PDF PAGE 92 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Staff recommends execution of the attached Local Public Agency Agreement for Federal Participation (BLR 05310) and the Resolution for Improvement Under the Illinois Highway Code (BLR 09110). ACTIONS PROPOSED: Approve Resolution No. 19-R-0023 authorizing the Mayor to execute a Local Public Agency Agreement for Federal Participation (BLR 05310) between the Illinois Department of Transportation and the City of West Chicago for STP grant funding for construction costs related to the Forest Avenue Resurfacing Project; and approve Resolution No. 19-R-0024 authorizing the City Clerk to execute an Illinois Department of Transportation Resolution for Improvement Under the Illinois Highway Code (BLR 09110) for use of Motor Fuel Tax funds for the City’s local share of the project's construction costs. COMMITTEE RECOMMENDATION: ===== PDF PAGE 93 ===== [Extraction: OCR (rendered-page OCR)] RESOLUTION NO. 19-R-0023 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A LOCAL AGENCY AGREEMENT FOR FEDERAL PARTICIPATION BETWEEN THE ILLINOIS DEPARTMENT OF TRANSPORTATION AND THE CITY OF WEST CHICAGO FOR STP GRANT FUNDING FOR CONSTRUCTION COSTS RELATED TO THE FOREST AVENUE RESURFACING PROJECT WHEREAS, the City of West Chicago is attempting to improve a segment of Forest Avenue from Joliet Street to Illinois Route 59 that is approximately 0.66 miles in length; and, WHEREAS, the cost of said improvement has necessitated the use of federal funds; and, WHEREAS, the federal fund source requires a match of local funds. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the City of West Chicago authorized two hundred eighty-two thousand three hundred eighty-five dollars and zero cents ($282,385.00), or as much money as may be needed, to match federal funds in the completion of MFT Section Number 18-00081-00-RS. BE IT FURTHER RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a Local Agency Agreement for Federal Participation between the Illinois Department of Transportation and the City of West Chicago for STP grant funding for construction costs related to the Forest Avenue Resurfacing Project, in substantially the form attached hereto and incorporated herein as Exhibit “A”; and, Resolution 19-R-0023 Page 1 of 2 ===== PDF PAGE 94 ===== [Extraction: OCR (rendered-page OCR)] BE IT FURTHERE RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Clerk is hereby directed to transmit five certified copies of this Resolution to the Illinois Department of Transportation. APPROVED this 6" day of May, 2019. AYES: NAYS: ABSTAIN: ABSENT: Mayor ATTEST: City Clerk Resolution 19-R-0023 Page 2 of 2 ===== PDF PAGE 95 ===== [Extraction: OCR (rendered-page OCR)] Local Public Agency State Contract Day Labor | LocalContract | RR Force Account | GE rr dl fot ai City of West Chicago X Local Public Agency Agreement Section Fund Type ITEP, SRTS, or HSIP Number(s) for Federal Participation 18-00081-00-RS STU Construction | Engineerin Right-of-Way Job Number Project Number Job Number Project Number Job Number Project Number C-91-218-18 XZ9U(998) This Agreement is made and entered into between the above local public agency, hereinafter referred to as the “LPA”, and the State of Illinois, acting by and through its Department of Transportation, hereinafter referred to as "STATE". The STATE and LPA jointly propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans prepared by, or on behalf of the LPA, approved by the STATE and the STATE'’s policies and procedures approved and/or required by the Federal Highway Administration, hereinafter referred to as “FHWA”. Location LocalName _Forest Avenue Route _MS 5041 Length _0.66 mi Termini _Joliet Street to IL Route 59 Current Jurisdiction _LPA TIP Number _ 08-18-0018 Existing Structure No N/A Project Description Roadway resurfacing, Class D patching, intermittent sidewalk and combination curb and gutter, and street lighting improvement. Division of Cost Type of Work STU % STATE % LPA % Total Participating Construction 282,385 ( vi 282,385 BAL 564,770 Non-Participating Construction ( Preliminary Engineering ( Construction Engineering ( Right of Way ( Railroads ( Utilities ( Materials TOTAL $ 282,385 $ $ 282,385 $ 564,770 “Maximum FHWA (STU) Participation 50% NTE $282,385 ( ( ( ( ( ( ( NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LPA share is dependent on the final Federal and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. If funding is not a percentage of the total, place an asterisk in the space provided for the percentage and explain above. Local Public Agency Appropriation By execution of this Agreement, the LPA attests that sufficient moneys have been appropriated or reserved by resolution or ordinance to fund the LPA share of project costs. A copy of the authorizing resolution or ordinance is attached as an addendum (required for State-let contracts only) Method of Financing (State Contract Work Only) METHOD A---Lump Sum (80% of LPA Obligation) METHOD B--- Monthly Payments of due by the of each successive month. METHOD C---LPA’s Share _ Balance divided by estimated total cost multiplied by actual progress payment. (See page two for details of the above methods and the financing of Day Labor and Local Contracts) Printed 4/26/2019 Page 1 of 5 BLR 05310 (Rev. 01/29/18) ===== PDF PAGE 96 ===== [Extraction: OCR (rendered-page OCR)] Agreement Provisions THE LPA AGREES: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) To acquire in its name, or in the name of the STATE if on the STATE highway system, all right-of-way necessary for this project in accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, and established State policies and procedures. Prior to advertising for bids, the LPA shall certify to the STATE that all requirements of Titles II and Ill of said Uniform Act have been satisfied. The disposition of encroachments, if any, will be cooperatively determined by representatives of the LPA, and the STATE and the FHWA, if required. To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private, in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems. To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction of the proposed improvement. To retain jurisdiction of the completed improvement unless specified otherwise by addendum (addendum should be accompanied by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required. To maintain or cause to be maintained, in a manner satisfactory to the STATE and the FHWA, the completed improvement, or that portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above. To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and Nondiscrimination Regulations required by the U.S. Department of Transportation. To maintain, for a minimum of 3 years after final project close-out by the STATE, adequate books, records and supporting documents to verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and the department; and the LPA agrees to cooperate fully with any audit conducted by the Auditor General and the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. To provide if required, for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of the proposed improvement. To comply with Federal requirements or possibly lose (partial or total) Federal participation as determined by the FHWA. (State Contracts Only) That the method of payment designated on page one will be as follows: Method A- Lump Sum Payment. Upon award of the contract for this improvement, the LPA will pay to the STATE within thirty (30) calendar days of billing, in lump sum, an amount equal to 80% of the LPA's estimated obligation incurred under this Agreement. The LPA will pay to the STATE the remainder of the LPA’s obligation (including any nonparticipating costs) within thirty (30) calendar days of billing in a lump sum, upon completion of the project based on final costs. Method B- Monthly Payments. Upon award of the contract for this improvement, the LPA will pay to the STATE, a specified amount each month for an estimated period of months, or until 80% of the LPA’s estimated obligation under the provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LPA’s obligation (including any nonparticipating costs) in a lump sum, upon completion of the project based upon final costs. Method C- Progress Payments. Upon receipt of the contractor's first and subsequent progressive bills for this improvement, the LPA will pay to the STATE within thirty (30) calendar days of receipt, an amount equal to the LPA’s share of the construction cost divided by the estimated total cost, multiplied by the actual payment (appropriately adjusted for nonparticipating costs) made to the contractor until the entire obligation incurred under this Agreement has been paid. Failure to remit the payment(s) in a timely manner as required under Methods A, B, or C, shall allow the STATE to internally offset, reduce, or deduct the arrearage from any payment or reimbursement due or about to become due and payable from the STATE to LPA on this or any other contract. The STATE, at its sole option, upon notice to the LPA, may place the debt into the Illinois Comptroller's Offset System (15 ILCS 405/10.05) or take such other and further action as my be required to recover the debt. (Local Contracts or Day Labor) To provide or cause to be provided all of the initial funding, equipment, labor, material and services necessary to construct the complete project. (Preliminary Engineering) In the event that right-of-way acquisition for, or actual construction of, the project for which this preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the fiscal year in which the project is federally authorized, the LPA will repay the STATE any Federal funds received under the terms of this Agreement. (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the close of the twentieth fiscal year following the fiscal year in which the project is federally authorized, the LPA will repay the STATE any Federal Funds received under the terms of this Agreement. Printed 4/26/2019 Page 2 of 5 BLR 05310 (Rev. 01/29/18) ===== PDF PAGE 97 ===== [Extraction: OCR (rendered-page OCR)] (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield, Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad related work, All railroad related work is also subject to approval be the Illinois Commerce Commission (ICC). Final inspection for railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office. Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic signals should also be coordinated with the IDOT’s District Bureau of Operations. The LPA is responsible for the payment of the railroad related expenses in accordance with the LPA/railroad agreement prior to requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of Local Roads and Streets office. Engineer's Payment Estimates shall be in accordance with the Division of Cost on page one. And certifies to the best of its knowledge and belief its officials: (a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency; (b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen property; (c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with commission of any of the offenses enumerated in item (b) of this certification; and (d) have not within a three-year period preceding the Agreement had one or more public transactions (Federal, State, local) terminated for cause or default. To include the certifications, listed in item 15 above, and all other certifications required by State statutes, in every contract, including procurement of materials and leases of equipment. (State Contracts) That execution of this agreement constitutes the LPA’s concurrence in the award of the construction contract to the responsible low bidder as determined by the STATE. That for agreements exceeding $100,000 in federal funds, execution of this Agreement constitutes the LPA’s certification that: (a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract, grant, loan or cooperative agreement; (b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of a Member of Congress, in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions; (c) The LPA shall require that the language of this certification be included in the award documents for all subawards at all ties (including subcontracts, subgrants and contracts under grants, loans and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. To regulate parking and traffic in accordance with the approved project report. To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes. To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in accordance with current Illinois Compiled Statutes. To complete this phase of the project within three (3) years from the date this agreement is approved by the STATE if this portion of the project described in the Project Description does not exceed $1,000,000 (five years if the project costs exceed $1,000,000). To comply with the federal Financial Integrity Review and Evaluation (FIRE) program, which requires States and subrecipients to justify continued federal funding on inactive projects. 23 CFR 630.106(a)(5) defines an inactive project as a project which no expenditures have been charged against Federal funds for the past twelve (12) months. To keep projects active, invoicing must occur a minimum of one time within any given twelve (12) month period. However, to ensure adequate processing time, the first invoice shall be submitted to the STATE within six (6) months of the federal authorization date. Subsequent invoices will be submitted in intervals not to exceed six (6) months. The LPA will submit supporting documentation with each request for reimbursement from the STATE. Supporting documentation is defined as verification of payment, certified time sheets or summaries, vendor invoices, vendor receipts, cost plus fix fee invoice, progress report, and personnel and direct cost summaries.and other documentation supporting the requested reimbursement Printed 4/26/2019 Page 3 of 5 BLR 05310 (Rev. 01/29/18) ===== PDF PAGE 98 ===== [Extraction: OCR (rendered-page OCR)] (25) (26) (27) amount (Form BLRS 05621 should be used for consultant invoicing purposes). LPA invoice requests to the STATE will be submitted with sequential invoice numbers by project. The LPA will submit to the STATE a complete and detailed final invoice with applicable supporting documentation of all incurred costs, less previous payments, no later than twelve (12) months from the date of completion of this phase of the improvement or from the date of the previous invoice, which ever occurs first. If a final invoice is not received within this time frame, the most recent invoice may be considered the final invoice and the obligation of the funds closed. The LPA shall provide the final report to the appropriate STATE district within twelve months of the physical completion date of the project so that the report may be audited and approved for payment. If the deadline cannot be met, a written explanation must be provided to the district prior to the end of the twelve months documenting the reason and the new anticipated date of completion. If the extended deadline is not met, this process must be repeated until the project is closed. Failure to follow this process may result in the immediate close-out of the project and loss of further funding. (Single Audit Requirements) That if the LPA expends $750,000 or more a year in federal financial assistance they shall have an audit made in accordance with 2 CFR 200. LPAs expending less than $750,000 a year shall be exempt from compliance. A copy of the audit report must be submitted to the STATE (Office of Finance and Administration, Audit Coordination Section, 2300 South Dirksen Parkway, Springfield, Illinois, 62764), within 30 days after the completion of the audit, but no later than one year after the end of the LPA’s fiscal year. The CFDA number for all highway planning and construction activities is 20.205. Federal funds utilized for constructon activities on projects let and awarded by the STATE (denoted by an “X” in the State Contract field at the top of page 1) are not included in a LPA’s calculation of federal funds expended by the LPA for Single Audit purposes. That the LPA is required to register with the System for Award Management or SAM (formerly Central Contractor Registration (CCR)), which is a web-enabled government-wide application that collects, validates, stores, and disseminates business information about the federal government's trading partners in support of the contract award and the electronic payment processes. To register or renew, please use the following website: https:/Awww.sam.gov/portal/public/SAM/#1. The LPA is also required to obtain a Dun & Bradstreet (D&B) D-U-N-S Number. This is a unique nine digit number required to identify subrecipients of federal funding. A D-U-N-S number can be obtained at the following website: http://fedgov.dnb.com/webform. THE STATE AGREES: (1) (2) (3) (4) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity of the LPA’s certification of compliance with Titles I! and II] requirements. (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the STATE (and FHWA, if required) and to award a contract for construction of the proposed improvement, after receipt of a satisfactory bid. (Day Labor) To authorize the LPA to proceed with the construction of the improvement when Agreed Unit Prices are approved, and to reimburse the LPA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and Engineer's Payment Estimates in accordance with the Division of Cost on page one. (Local Contracts) For agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction work: (a) To reimburse the LPA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient cost information and show evidence of payment by the LPA; (b) To provide independent assurance sampling, to furnish off-site material inspection and testing at sources normally visited by STATE inspectors of steel, cement, aggregate, structural steel and other materials customarily tested by the STATE. IT IS MUTUALLY AGREED: (1) (2) (3) Construction of the project will utilize domestic steel as required by Section 106.01 of the current edition of the Standard Specifications for Road and Bridge Construction and federal Buy America provisions. That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve the proposed improvement for Federal-aid participation within one (1) year of the date of execution of this Agreement. This Agreement shall be binding upon the parties, their successors and assigns. Printed 4/26/2019 Page 4 of 5 BLR 05310 (Rev. 01/29/18) ===== PDF PAGE 99 ===== [Extraction: OCR (rendered-page OCR)] (4) (5) (6) For contracts awarded by the LPA, the LPA shall not discriminate on the basis of race, color, national origin or sex in the award and performance of any USDOT — assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The LPA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of USDOT — assisted contracts. The LPA’s DBE program, as required by 49 CFR part 26 and as approved by USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved program, the STATE may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). In the absence of a USDOT — approved LPA DBE Program or on State awarded contracts, this Agreement shall be administered under the provisions of the STATE's USDOT approved Disadvantaged Business Enterprise Program. In cases where the STATE is reimbursing the LPA, obligations of the STATE shall cease immediately without penalty or further payment being required if, in any fiscal year, the Illinois General Assembly or applicable Federal Funding source fails to appropriate or otherwise make available funds for the work contemplated herein. All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or amendment shall be subject to the Prevailing Wage Act (820 ILCS 130/0.01 et seq.) unless the provisions of that Act exempt its application. ADDENDA Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement. Number 1- Location Map, Number 2 —LPA Appropriation Resolution Number 3 - GATA (Insert Addendum numbers and titles as applicable) The LPA further agrees, as a condition of payment, that it accepts and will comply with the applicable provisions set forth in this Agreement and all Addenda indicated above. APPROVED APPROVED Local Public Agency k State of Illinois Department of Transportation Name of Official (Print or Type Name) Randall S. Blankenhorn, Secretary of Transportation Date By: Title (County Board Chairperson/Mayor/Village President/etc.) Erin Aleman, Director of Planning & Programming Date Erin Aleman, Director of Planning & Programming Date (Signature) Date The above signature certifies the agency's TIN number is Philip C. Kaufmann, Chief Counsel Date 36-6006144 conducting business as a Governmental Entity. DUNS Number 113554448 Jeff Heck, Chief Fiscal Officer (CFO) Date NOTE: If the LPA signature is by an APPOINTED official, a resolution authorizing said appointed official to execute this agreement is required. Printed 4/26/2019 Page 5 of 5 BLR 05310 (Rev. 01/29/18) ===== PDF PAGE 100 ===== [Extraction: OCR (rendered-page OCR)] ‘Ac YEAR CLASSIFICATION LEGEND ———— PRINCIPAL ARTERIAL MINOR ARTERIAL ———— COLLECTOR - URBAN a TN, a awe 2 WEST CHICAGO navn ee ane ee FOREST AVE : 3 em CITY OF WEST CHICAGO thomas englieering group, lle FOREST AVENUE DRAWN BY __OJN § SCALE 475 MAIN STREET tha S, 238 south kenllworth avenue WEST CHICAGO, IL 60185 yma suite 100 CHECKED BY KCV ff DATE __06/16/16, * PHONE: 630-293-2255 engineeitna giove o0k park, 60302 é FAX: 630-203-2071 Heres et ine mates! a'4%%6 phone: B55-533-1700 JOLIET STREET TO IL ROUTE 59 ===== PDF PAGE 101 ===== [Extraction: OCR (rendered-page OCR)] Addendum No. 3 Grant Accountability and Transparency Act (GATA) Required Uniform Reporting The Grant Accountability and Transparency Act (30 ILCS 708), requires a uniform reporting of expenditures. Uniform reports of expenditures shall be reported no less than quarterly using IDOT’s BoBS 2832 form available on IDOT’s web page under the “Resources” tab. Additional reporting frequency may be required based upon specific conditions, as listed in the accepted Notice of State Award (NOSA). Specific conditions are based upon the award recipient/grantee's responses to the Fiscal and Administrative Risk Assessment (ICQ) and the Programmatic Risk Assessment (PRA). PLEASE NOTE: Under the terms of the Grant Funds Recovery Act (30 ILCS 705/4.1), “Grantor agencies may withhold or suspend the distribution of grant funds for failure to file requirement reports” if the report is more than 30 calendar days delinquent, without any approved written explanation by the grantee, the entity will be placed on the Illinois Stop Payment List. (Refer to the Grantee Compliance Enforcement System for detail about the Illinois Stop Payment List: https://www. illinois.gov/sites/GATA/Pages/ResourceLibrary.aspx ) ===== PDF PAGE 102 ===== [Extraction: OCR (rendered-page OCR)] RESOLUTION NO. 19-R-0024 A RESOLUTION AUTHORIZING THE CITY CLERK TO EXECUTE AN ILLINOIS DEPARTMENT OF TRANSPORTATION RESOLUTION FOR IMPROVEMENT UNDER THE ILLINOIS HIGHWAY CODE (BLR 09110) FOR USE OF MOTOR FUEL TAX FUNDS FOR THE CITY’S LOCAL SHARE OF CONSTRUCTION COSTS RELATED TO THE FOREST AVENUE RESURFACING PROJECT WHEREAS, the City of West Chicago is attempting to improve a segment of Forest Avenue from Joliet Street to Illinois Route 59 that is approximately 0.66 miles in length; and, WHEREAS, the cost of said improvement has necessitated the use of federal funds; and, WHEREAS, the federal fund source requires a match of local funds; and, WHEREAS, the City desires to use Motor Fuel Tax funds as its match of local funds. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the City of West Chicago authorized the use of Motor Fuel Tax funds in the amount of two hundred ninety-nine thousand five hundred forty-one dollars and ninety-seven cents ($299,541.97), or as much money as may be needed, to match federal funds in the completion of MFT Section Number 18-00081-00-RS. BE IT FURTHER RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the City Clerk is hereby authorized to Resolution 19-R-0024 Page | of 2 ===== PDF PAGE 103 ===== [Extraction: OCR (rendered-page OCR)] execute an Illinois Department of Transportation Resolution for Improvement Under the Illinois Highway for construction costs related to the Forest Avenue Resurfacing Project, in substantially the form attached hereto and incorporated herein as Exhibit “A”; and, BE IT FURTHERE RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Clerk is hereby directed to transmit five certified copies of said Resolution to the Illinois Department of Transportation. APPROVED this 6" day of May, 2019. AYES: NAYS: ABSTAIN: ABSENT: Mayor ATTEST: City Clerk Resolution 19-R-0024 Page 2 of 2 ===== PDF PAGE 104 ===== [Extraction: OCR (rendered-page OCR)] Illinois Department Resolution for Improvement pa of Transportation Under the Illinois Highway Code Resolution Number__—_ Resolution Type Section Number 2019-R-0024 Original 18-00081-00-RS BE IT RESOLVED, by the Council ofthe City Governing Body Type Local Public Agency Type of West Chicago Illinois that the following described street(s)/road(s)/structure be improved under Name of Local Public Agency the Illinois Highway Code. Work shall be done by Contract ~~ Contract or Day Labor —~ For Roadway/Street improvements: Name of Street(s)/Road(s) Length (miles) | Route From To Forest Avenue 0.66 MS 5041 |Joliet Street Illinois Route 59 For Structures: Name of Street(s)/Road(s) Existing Route Location Feature Crossed Structure No. +] BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of Roadway resurfacing, Class D patching, intermittent sidwalk and combination curb and gutter, and street lighting improvements. 2. That there is hereby appropriated the sum of two hundred ninety-nine thousand five hundred forty-one dollars and ninety-seven cents Dollars (_ $299,541.97 ) for the improvement of said section from the Local Public Agency's allotment of Motor Fuel Tax funds. BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit four (4) certified originals of this resolution to the district office of the Department of Transportation. |, Nancy M. Smith City Clerk in and for said City Name of Clerk Local Public Agency Type Local Public Agency Type of West Chicago in the State aforesaid, and keeper of the records and files thereof, as provided by Name of Local Public Agency statute, do hereby certify the foregoing to be a true, perfect and complete original of a resolution adopted by Council of West Chicago at a meeting held on May 06, 2019 Governing Body Type Name of Local Public Agency ate IN TESTIMONY WHEREOF, | have hereunto set my hand and seal this 6 day of May, 2019 Day Month, Year (SEAL) Clerk Signature Approved Regional Engineer Department of Transportation Date Printed 04/26/19 BLR 09110 (Rev. 03/13/17) ===== PDF PAGE 105 ===== [Extraction: OCR (rendered-page OCR)] cYEAR CLASSIFICATION LEGEND n= PRINCIPAL ARTERIAL MINOR ARTERIAL fea) oy ' tavern crore) PRINCE CROSSING RD. WEST CHICAGO iy JOLIET ST OUTE 59/7 a > 2 i a oO rset CITY OF WEST CHICAGO thomas engineering group, lic DRAWING NO. 475 MAIN STREET thamas, 238 south kenliworth avenue FOREST AVENUE RAN ; WEST CHICAGO, IL 60185 suite 100 LOCATION MAP CHECKED BY _KCV 9 DATE __06/16/16 pn PHONE: 630-203-2255 engineering drove oak park, Ii 60302 JOLIET STREET TO FAX: 630-295-2071 feteeet ne river ete phone: 855-533-1700 IL ROUTE 59