===== PDF PAGE 5 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASliRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: ....5-.-......;•..... a-_____Rejection of Bids - 2019 Sidewalk and Curb Maintenance COMMITTEE AGENDA DATE: June 6, 2019Program COUNCIL AGENDA DATE: June 20, 2019 STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE._________ _ ITEM SUMMARY: For 2019, the City's annual Sidewalk and Curb Maintenance Program consists of over 13,000 square feet of intermittent removal and replacement of mostly residential concrete sidewalk located throughout the City. This year's program consisted of approximately 13,500 square feet of concrete sidewalk removal and replacement at approximately 245 locations throughout the City. The sidewalk depth varies from five to six inches. The program also includes installation of ADA compliant detectable warnings pads, removal and replacement of approximately 100 lineal feet of combination concrete curb and gutter, pavement and landscape restoration, and all incidental and collateral work necessary to complete the project as shown on the Plans and identified in the project specifications. With engineering plans and specifications prepared by Thomas Engineering Group, LLC (TEG), the 2019 Sidewalk and Curb Maintenance Program was advertised in the Daily Herald on March 5, 2019, and bids were opened on March 26, 2019. There were six plan holders and the City received only one bid. Schroeder & Schroeder, Inc. of Skokie, Illinois, submitted the only bid of $174,869.00. TEG's engineer's estimate of probable cost was $134,827.80 (see attached bid tabulation sheets for additional clarification). There is $135,000.00 budgeted in the Capital Projects Fund for FY 2019 for the Sidewalk and Curb Maintenance Program. Although not known for certain, staff speculates that the lack of bidders and the high pricing received is due to: 1. Contractor's schedules are too busy at this time and they do not need any additional work. 2. The project's requirements are considered difficult and time consuming. This was based on the fact that sidewalk and curb removals and replacements are scattered throughout the entire City instead of being localized to a single job location, and detailed work involving reconstruction of ADA ramps. Given the fact that only one bid was received and it was substantially over budget, staff recommends that City Council reject the bid. It is also staff's recommendation that the funds budgeted for the 2019 Sidewalk and Curb Maintenance Program, not to exceed $135,000.00, would best be utilized to remove and replace additional sections of sidewalk and curb along Washington Street, between Arbor Avenue and Clara Street, as part of the 2019 Washington Street Reconstruction Project. As bid, the plans and specifications for the 2019 Washington ===== PDF PAGE 6 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO Street Reconstruction Project do not include sidewalk and curb replacement, except for upgrades to the ADA ramps at the intersection of Washington Street and Main Street/Fremont Street. Sidewalk and curb replacement was originally omitted from the project due to availability of funds. However, there are significant number of sidewalk and curb deficiencies that warrant replacement. With the availability of funds due to the rejection of bids for the 2019 Sidewalk and Curb Maintenance Program, staff believes that it would be best to address the Washington Street sidewalk and curb deficiencies as part the of reconstruction project; prior to placement of new asphalt pavement and while business are already being inconvenienced. This will eliminate the need to return in a few years to complete said work, causing further disruption and inconvenience to local businesses. ACTIONS PROPOSED: Reject the bid received for the 2019 Sidewalk and Curb Maintenance Program and direct staff to utilize funds previously budgeted for the 2019 Sidewalk and Curb Maintenance Program, not to exceed $135,000.00, to remove and replace additional sections of sidewalk and curb along Washington Street, between Arbor Avenue and Clara Street, as part of the 2019 Washington Street Reconstruction Project. COMMITTEE RECOMMENDATION: