===== PDF PAGE 31 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO DEVELOPMENT COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDAITEMNUMBER: — 2:4. __ Final Development Plan 808 Discovery Drive FILE NUMBER: Project Pilot COMMITTEE AGENDA DATE: Oct. 14, 2019 Resolution No. 19-R-0052 COUNCIL AGENDA DATE: STAFF REVIEW: Tom Dabareiner, AICP SIGNATURE Zee APPROVED BY CITY ADMINISTRATOR: Michael Guttman SIGNATURE ITEM SUMMARY: Project Pilot is a code name for a proposed build-to-suit project by Seefried Industrial Properties for a Fortune 500 company. The project is proposed to be on 39.2 acres in the DuPage Business Center across Discovery Drive from Suncast, with the address of 808 Discovery Drive. The property is zoned A, Airport. The proposed 145,000 square foot building will house a last-mile distribution facility, which is allowed in that zoning district. No variances are being requested. A deviation is being sought for the amount of parking in a front yard because of the parking demand and the fact that nearly the entire property is adjacent to roadway. As a last-mile distribution center there is significant parking for cars and delivery vehicles, about 1,170 stalls. To help segregate on-site circulation—keeping office-related activities from distribution activi- ties—separate parking areas and four curb cuts are proposed on Discovery Drive. The petitioner has taken into account the building’s attractiveness, as well. The building will meet the window glazing requirement and includes smooth precast wall panels with accents. The wall panels and roof deck will be heavy insulated for energy savings. The building will have aluminum clad cano- pies on two sides for sheltering delivery vans while they are loaded. A building rendering is also at- tached for your reference. The attached draft Resolution references specific site plans, landscape plans and building elevations for the proposed development. The terms of the IGA require the City Council to approve the final development if it is in conformance with all of the controlling documents (the City’s Airport Zoning District regulations and the DAA’s Mini- mum Design Standards). The DAA has already approved it subject to City action. City staff acknowl- edges that the proposed development plans comply. ACTION PROPOSED: Consideration of the final development plan for Project Pilot at 808 Discovery Drive. ===== PDF PAGE 32 ===== [Extraction: OCR (rendered-page OCR)] CITYOFWESTCHICAGO COMMITTEERECOMMENDATION: PC:Resolution19-R-0052 ===== PDF PAGE 33 ===== [Extraction: OCR (rendered-page OCR)] RESOLUTION NO. 19-R-0052 A RESOLUTION APPROVING THE FINAL DEVELOPMENT PLAN FOR SEEFRIED INDUSTRIAL PROPERTIES, 808 DISCOVERY DRIVE DUPAGE BUSINESS CENTER WHEREAS, the City Council of the City of West Chicago shall consider proposed development within the DuPage Business Center to determine compliance with the applicable codes and ordinances of the City of West Chicago; and, WHEREAS, the DuPage Airport Authority conditionally approved the final development plan for the Seefried Industrial Properties development by Resolution 2019-2300 on September 18, 2019; and, WHEREAS, the City Council of the City of West Chicago has determined that the proposed Final De- velopment Plan for the Seefried Industrial Properties development does comply with the applicable codes and ordinances of the City of West Chicago. BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled as follows: Section 1. That the Final Development Plan for the Seefried Industrial Properties development is hereby approved in accordance with the following plans, attached hereto as Exhibit “A”: 1. The Site Plan prepared by Spaceco, Inc. dated 08-21-2019 and revised 09-12-19. 2. The Landscape Plans prepared by Pamela Self Landscape Architecture dated 08-27-19 and last re- vised 9-25-19. 3. The Building Elevations prepared by CESO, Inc. dated 08-21-19 and last revised 09-13-19. Section 3. That if the City Staff determines the parapet wall does not adequately screen rooftop mechani- cal units, individual screening shall be installed around the visible units to prevent views from the adjacent pub- lic rights-of-way. Section 4. That all resolutions, or parts thereof, in conflict with the provisions of this Resolution are, to the extent of such conflict, expressly repealed. Section 5. That this Resolution shall be in full force and effect from and after its adoption and approval as provided by law. Resolution 19-R-0052 Page | of 3 ===== PDF PAGE 34 ===== [Extraction: OCR (rendered-page OCR)] APPROVED this day of 2019. AYES: NAYES: ABSTAIN: ABSENT: Mayor Ruben Pineda ATTEST: City Clerk Nancy M. Smith Resolution 19-R-0052 Page 2 of 3 ===== PDF PAGE 35 ===== [Extraction: OCR (rendered-page OCR)] Exhibit “A” (insert Site Plan, Landscape Plans, and Building Elevation Plan here) Resolution 19-R-0052 Page 3 of 3 ===== PDF PAGE 36 ===== [Extraction: OCR (rendered-page OCR)] REMARKS TON REMARKS WEST CHICAGO,ILLINOIS 0 1C8/27/19PERDAAREV1EW DUPAGE BUSINESS CENTER SPACECOI OVGM 209/12/19PERCITYREVIEW PROJECT PILOT LAND SURVEYORS 133HS OVERALLGEOMETRIC PLAN CONSULTINGENGINEERS STANCARDPITOH(PITOHIN)CURB NOTEIATITOEI ONCRETEPAVEMENTORAPRON BUILDING/PAVING AREA=26.36ACRES DEPRESSED CURB&GUTTER HEAVYDUTYPAVEMENT HEDIUMDUTYPAVEMENT LIGHTDUTYPAVEMENT CONCRETESIDEWALK LOTCOVERAGESUMMARY: NON-PAVEDAREA=13.06ACRES TOTAL SITEAREA=39.42ACRES SIGN LEGEND: ? OTS LOTCOVERAGE=66.87% (ZXIT)STTISNVA EGEND SOTHERWISENOTED T ROESIGNANDDETAILSOFTHEBUDING SEESHEETGNFORPAVEHENTSECTNS REFERTO S2FOR SHON TV` DRIVE No U mimmumt OA DISCOVERY DRIVE !!! BOULEVARD 11 INOLOGY 日 11 ===== PDF PAGE 37 ===== [Extraction: OCR (rendered-page OCR)] eee pamelaself ‘CLIENT NAME: sarees ‘SactiadPrpertos ase gpa ons ~ , e ‘Sie 220 a 5 = Swe Geage, Bers 1// SHEET L1.0° / O/ SHEET L2.0 ‘ARCHITECT Civ ENGINEER: ‘Spececa re. (GENERAL CONTRACTOR: YSLNA0 SSANISNE 3A9VdNG sioui||| ‘oBea1y9 Isom, e@AlIg Ale@Aoosiq 80g ae] erro] Siz e9| co ‘ LANDSCAPE PLAN FOR REVIEW ONLY- L0.0 DO NOT USE FOR CONSTRUCTION rerrreerenrer ===== PDF PAGE 38 ===== [Extraction: OCR (rendered-page OCR)] WALL AREA: 11,557 S.F. PROVIDED GLAZING AREA: 630 S.F. 4% REQUIRED GLAZING: 462 S.F. EXTERIOR PAINT COLOR LEGEND CO aimiece an ° > NG 9 | | | reereveotn cores ee ‘TYP. HORIZONTAL REVEAL HE FTP Typ. BUTT PANEL JOINT ENLARGED SOUTH-WEST ELEVATION @) ® TYP. VERTICAL REVEAL EFT ( 1 ) SOUTH-WEST ELEVATION Tannin osuonno ne arena anor Taraioenucorse ime $8109 11 ‘OVOIHO 1S3M NING AN3AODSIC 808 UIN3O SS3NISNE 3O¥dNG LOMd LOArOud Es eh EXTERIOR ELEVATIONS ===== PDF PAGE 39 ===== [Extraction: OCR (rendered-page OCR)] WALL AREA: 34,997 S.F. PROVIDED GLAZING AREA: 1520 S.F. 4% REQUIRED GLAZING: 1400 S.F. EXTERIOR PAINT COLOR LEGEND, + [u i a @ 8 t ENLARGED SOUTH-EAST ELEVATION ip (28) (0) D Pe ( 4 ) SOUTHEAST: ELEVATION YSLNIO SSANISNE 3OvdNd $8109 11 (OOVOIHO 1S3M BAI AUBNOOSIO 808 LOMd LOArOud aa oreo] ets) cxs0) eile IE EXTERIOR ELEVATIONS os A3.2 ===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] Ona: WALL AREA: 12,366 S.F. PROVIDED GLAZING AREA: 600 S.F. 4% REQUIRED GLAZING: 495 S.F. Cte py ied fa fate I ® sae uf if fEEEES — a ® : : : Sy ve za ae , : 7 = ) eee | 7 nooo | a i v | ere | eerenemac at i se i i i J etreserorme | cose [aD] $8109 11 ‘ODVOIHO 13M 3AING AN3AOOSIC 808 uaIN3O SsaNisna 3OvdNd LO'ld LOArOud ls Tae TEnoTeD eo Bani] tt —|— ela fils | | | | | | | SESE SSGe f EXTERIOR ? ELEVATIONS ( 1 ) NORTH-EAST ELEVATION — A3.3 ===== PDF PAGE 41 ===== [Extraction: OCR (rendered-page OCR)] WALL AREA: 34,870 S.F. PROVIDED GLAZING AREA: 1520 S.F. 4% REQUIRED GLAZING: 1395 S.F. EXTERIOR PAINT COLOR LEGEND oe Be Be B| 8 8 8 rn | = ae / ae — : 7 : ENLARGED NORTH-WEST ELEVATION CU ome! j | ici ee She ies fete ces =e $8109 1 ‘COVOIHO 183M 3AIUC ANSAOOSIG 808 uBINaO ssaNisna 3O¥dNd LOMd LIArOud Tar es. sl lile NORTH-WEST ELEVATION ( { Harare ae EXTERIOR ELEVATIONS = A3.4 ===== PDF PAGE 42 ===== [Extraction: OCR (rendered-page OCR)] On PERSPECTIVE zi © SITE LINE PERSPECTIVE ( ) SITE LINE PERSPECTIVE KEY 9 = $9109 11 O9¥OIHO 1S3M SAG AYBAOOSIC 808 uaIN3O SS3NISNa JOvaNG LOMd LIArOud ons Tear eet. ails a a ‘SITE LINE STUDY a A3.5