===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO CITY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: __ ©: G. Resolution No. 19-R-0048 — Change Order - Site Remediation Program Investigation and Document FILE NORIBER Preparation for the EPA — West Washington Street COMMITTEE AGENDA DATE: N/A Redevelopment Area COUNCIL AGENDA DATE: October 21, 2019 STAFF REVIEW: SIGNATURE. APPROVED BY CITY ADMINISTRATOR: SIGNATURE, ITEM SUMMARY: To date, all environmental contamination intended to be removed from the 14 acres of City-owned land known as the West Washington Street Project has been completed, but for three areas adjacent to structures on 119 W. Washington Street that are awaiting completion of the salt dome on Hawthorne Land and their eventual demolition. The last remaining area includes the former gas station at 139 W. Washington Street, which closed in early July 2019. This project involves pulling the tanks, demolition of the existing structures, pavement and curbing, site investigation and devising a remediation program to be approved by the IEPA; the attached scope of work provides more details. There is currently $600,000 included in the City Council’s 2019 approved budget for this project. While staff intended for this project to begin in August 2019, the City requested and eventually was allocated via Representative Karina Villa $600,000 to offset the costs of this project as approved by the State in its Capital Bill. However, no money may be spent prior to an Agreement being approved between the City and the State, so the project cannot yet start. Staff is working with representatives of the DuPage Mayor and Managers Conference to better understand the process for securing an Agreement, but answers from the State are not yet forthcoming. So, this project will not occur until 2020, but staff is requesting that the City Council approve this Change Order so it is ready for when the grant documentation is ready for completion. Staff will again include this money in the 2020 Budget. ACTIONS PROPOSED: Staff recommends approval of Resolution No. 19-R-0048, which authorizes Patrick Engineering to continue working on the West Washington Street Remediation Project, for an amount not to exceed $575,000. COMMITTEE RECOMMENDATION: This item didn’t go to Committee because it was already approved in the 2019 Budget, and the final stages of this Project must be completed. ===== PDF PAGE 41 ===== [Extraction: OCR (rendered-page OCR)] RESOLUTION NO. 19-R-0048 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT WITH PATRICK ENGINEERING INC. FOR CHANGE ORDER NO. 5 FOR THE SITE REMEDIATION PROGRAM INVESTIGATION AND DOCUMENT PREPARATION FOR THE EPA — WEST WASHINGTON STREET REDEVELOPMENT AREA BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a Contract with Patrick Engineering, Inc. for Change Order No. 5 for the Site Remediation Program Investigation and document preparation for the EPA regarding the West Washington Street Redevelopment Area for an amount not to exceed $575,000, in substantially the form attached hereto and incorporated herein as Exhibit “A”. APPROVED this 21% day of October, 2019. AYES: NAYES: ABSTAIN: ABSENT: Mayor Ruben Pineda ATTEST: City Clerk Nancy M. Smith ===== PDF PAGE 42 ===== [Extraction: OCR (rendered-page OCR)] June 7, 2019 Mr. Michael L. Guttman City Administrator City of West Chicago 475 Main Street West Chicago, Illinois 60185 Subject: Change Order 005 for Remediation of Former Gas Station West Washington Street Redevelopment Site West Chicago, Illinois Reference: Patrick Project Number 21653.008 Dear Mr. Guttman: Patrick Engineering Inc. (Patrick) is pleased to submit this change order request to the City of West Chicago (the City) to provide environmental consulting and site remediation services for a portion of the West Washington Street Redevelopment Site, specifically the former gas station located at 139 West Washington Street. The scope of services outlined in this proposal is consistent with the recommended scope items in the attached Economic Feasibility Study of Remedial Options (Patrick Engineering, February 2, 2017). This proposal contains Patrick’s anticipated project schedule and fees to complete the referenced scope of services. PROJECT UNDERSTANDING The City currently owns approximately 14 acres of property on the north side of Washington Street in West Chicago, Illinois (Site). The City plans to develop this property over the next several years into a new municipal center. Tentative plans for the new municipal center include a new City Hall, public space, and other mixed-use developments. In early 2017, Patrick was contracted by the City to complete remediation activities (including permitting and reporting tasks) associated with obtaining a No Further Remediation (NFR) Letter from the Illinois Environmental Protection Agency (Illinois EPA) under its Site Remediation Program regulatory framework. Since that time, Patrick has completed a supplemental site investigation, prepared preliminary reports for submittal to the Illinois EPA, and completed the remediation of all radionuclide compounds associated with the West Washington Redevelopment Site. The overall remediation project is ongoing, and is expected to reach into 2020 after the existing salt dome is removed and the underlying soils are accessible for remediation. One area which was specifically excluded from Patrick’s original scope of work, however, was the active gas station located at 139 West Washington Street. While the City owned this property, it maintained a lease to a local operator of a gasoline filling station. The City allowed the gas station to continue operation until June 1, 2019, and no investigation or remediation activities could take place on that parcel until that ===== PDF PAGE 43 ===== [Extraction: OCR (rendered-page OCR)] The City of West Chicago Remediation of 139 West Washington Street Page 2 of 5 June 7, 2019 time. Now that the lease has ended, the City has access to this additional property and Patrick can begin its work in remediating this parcel as well. This proposal outlines the Scope of Work that Patrick proposes to complete in order to complete remediation of the former gas station site, and estimates the costs associated with the completion of these tasks. Because a subsurface site investigation of the gas station site has been impossible while the station was operating, remedial costs outlined in this change order proposal are estimated based upon Patrick’s past experience with such sites, and the available data from subsurface soils directly adjacent to the relevant property. These costs have been estimated conservatively, but may need to be adjusted as additional site data becomes available. SCOPE OF WORK Task 1 — Site Investigation As noted above, the 139 West Washington site was excluded from the site investigation activities that took place in 2017 and early 2018. The first task associated with the remediation of the former gas station will be a limited soil investigation. Up to 15 soil samples will be collected at various locations and depths across the parcel, consistent with the methodology described in the existing Sampling and Analysis Plan (SAP) that has already been reviewed by the Illinois EPA. These samples will be analyzed for the compounds noted in the SAP, and relevant to obtaining an NFR Letter for the West Washington Development Site. The results of this investigation will be used to develop a proposed Remedial Action Plan with respect to the gas station site, for submittal to the Illinois EPA under the Site Remediation Program regulatory framework. Task 2 — Tank Removal Consistent with state and federal rules governing underground storage tanks, the two, 10,000-gallon underground gasoline storage tanks at 139 West Washington will be excavated and removed. This removal will involve the following subtasks: Obtaining the Office of the State Fire Marshal (OSFM) Tank Removal Permit; Notifying public utilities through the Illinois One-call System (JULIE) to locate underground utilities in accordance with Illinois State law; 3. Providing a private utility locator to perform private underground utility locates in the area of the excavation; 4. Mobilizing the necessary labor and equipment to the Site; 5. Construction of a temporary 6’-high chain link security fence; 6. Opening the tanks, pumping, and disposing of remaining tank contents (this proposal assumes the tanks will be largely empty except for some minor liquid in the bottom of the tanks); 7. Purging the tanks of flammable vapors; 8. Uncovering and removing any existing concrete slabs over the tanks; 9. Hauling concrete offsite for disposal as a recyclable material; 10. Excavating and removing two (2) 10,000 gallon USTs; 11. Opening and cleaning the tank interiors; 12. Removing associated product and vent piping; ===== PDF PAGE 44 ===== [Extraction: OCR (rendered-page OCR)] The City of West Chicago Remediation of 139 West Washington Street Page 3 of 5 June 7, 2019 13. Hauling and properly disposing of the tanks and piping to an approved disposal facility; 14. Furnishing a certificate of tank destruction; 15. Collecting up to a total of six (6) samples of soil from the excavation (one from each excavation sidewall and two from the excavation bottom); 16. Delivering samples to an accredited environmental testing laboratory for analysis; 17. Backfilling the tank excavation with CA-1 aggregate to a depth of 18” below grade, covered by a non-woven geotextile or filter fabric, covered by 12” of CA-6 aggregated, topped by 6” of topsoil, certified as clean with accompanying analytical sampling results. 18. Managing the removal contractor, documenting the removal efforts, coordinating with City of West Chicago personnel; and 19. Documenting proper removal and disposal of the tanks to OSFM. A representative of the OSFM will be present onsite during the tank excavation. If this representative determines that a tank is leaking, or has leaked, gasoline into the environment, he/she will create an incident number for the site, which will be reported to the Illinois Leaking Underground Storage Tank (LUST) division of the Illinois EPA. Should this occur (and it is reasonable to assume that this could happen), Patrick will petition the Illinois EPA to fold the resulting LUST remediation effort, which would be required by law, into the Site Remediation Program regulatory framework. It is very likely that the Illinois EPA will grant such a request, especially given the ongoing remediation efforts at the West Washington site. Task 3 — Demolition of Existing Structure The former gas station site included a small gas station building on the north side of the property. This building along with all will be removed as part of the tank removal effort. This removal will involve the following subtasks: 1. Submitting Notification of Demolition to Illinois EPA; 2. Securing DuPage County Demolition Permit; Performing asbestos inspection for notification of demolition (this proposal assumes that no asbestos will be found); Demolition of one-story building to grade, including light poles, sign, pumps, and wooden fence; Complete removal of concrete building pad, footings, pavement, and curbs inside property line; Off-site disposal of all demolition debris; and Utility capping and/or disconnect fees. w “son Ss This demolition does not include the removal of concrete approaches, sidewalks or curbs within the City right-of- way. Task 4 — Site Remediation Without knowing the results of the site investigation, or seeing the open excavation during the tank removals, it is impossible to know the extent to which the former gas station site will require remediation. However, based upon our experience with hundreds of similar tank removals, we are able to provide a relatively conservative cost estimate for this task that has a good chance of covering most contingencies. ===== PDF PAGE 45 ===== [Extraction: OCR (rendered-page OCR)] The City of West Chicago Remediation of 139 West Washington Street Page 4 of 5 June 7, 2019 The Illinois EPA handles the chemical components of gasoline in a different manner than most of the other site contaminants found in the West Washington Redevelopment Site. While many of the other contaminants can be capped safely with a shallow layer of clean soil, the volatile nature of many gasoline components requires a thicker cap (up to 10 feet), depending on the concentrations found. Accordingly, a worst-case scenario for the remediation of these soils would be the excavation and removal of soils to a depth of 10’, over a fairly wide area of the site. However, there are several alternative remediation scenarios that could be implemented by Patrick, depending on the conditions found: 1. No significant contamination of soils at the 139 West Washington site is found, or the contamination that is found is not volatile, and can be easily capped. This is fairly unlikely; most gas station sites, especially those that have been active for many years, exhibit some degree of contamination, usually with volatile components, such as benzene. 2. Contamination is found at depth at the site, but over a fairly limited areal extent. In this case, it may make sense to install one or more simple wells in the affected areas, and connect them to a simple air blower (< 1 hP). By injecting oxygen into the affected subsurface areas, the naturally occurring aerobic bacteria in the soils will be stimulated to biodegrade the volatile gasoline components into non-toxic components. This form of remediation is called bioventing, and can take on the order of months to years to achieve success. Other remedial activities at the West Washington Development Site won’t likely occur until 2020, so bioventing might be a reasonable approach to take, at least until active remediation begins the following year. 3. Contamination is found at depth over a wide areal extent. In this case, targeted excavation and off-site disposal used in combination with an onsite capping strategy is likely to be the most cost- effective option. It is possible that some combination of all three of these strategies might prove appropriate. For the purposes of this proposal, we have assumed a fairly conservative scenario (largely consisting of targeted excavation) where 4,000 cubic yards of soil are either treated or removed from the site. Documentation and reporting of the remediation of the gas station soils is included in this task, and will be coordinated with the overall reporting effort associated with the wider West Washington Redevelopment Site remediation that will continue into 2020. FEE Patrick proposes to provide the scope of services outlined herein on a time-and-materials basis for an estimated budget shown below. The estimated costs include Patrick labor, Project Management and reporting, subcontractor costs (including disposal of impacted soils and importing clean backfill), travel and other direct costs required to complete the scope of services outlined herein. Remediation and construction costs are based on hard quotations provided by specialty contractors and vendors (laboratories, transportation firms, excavators, landfills, etc.), and on Patrick’s past experience in remediating similar sites. Patrick believes the estimated costs included below are conservative and they include contingencies for unknowns, changes and unforeseen conditions. However, there are some conditions which may be ===== PDF PAGE 46 ===== [Extraction: OCR (rendered-page OCR)] The City of West Chicago Remediation of 139 West Washington Street Page 5 of 5 June 7, 2019 beyond Patrick’s control (sampling results, EPA comments and/or approvals, weather, site conditions, etc.) which may affect overall costs. If during the course of the work, Patrick determines that the project costs are likely to exceed this estimate for any reason(s), the reason(s) will be immediately communicated to the City, and appropriate budget amendments can be negotiated at that time. Patrick will not incur costs that exceed those shown below without the express authorization of the City. Task 1: Site Investigation S$ 25,000 Task 2: Storage Tank Removals (Includes IEPA/LUST Coordination) $ 125,000 Task 3: Demolition and Removal of Structures, Pavement, & Curbing S$ 45,000 Task 4: Remediation of 139 Washington Soils (4,000 cubic yards) $ 380,000 Estimated Total: S$ 575,000 AGREEMENT AND AUTHORIZATION All work outlined in this proposal will be performed in accordance with the Terms and Conditions of the existing agreement between Patrick and the City. A Project Change Order is included as an attachment to this proposal. If you would like Patrick to perform the services outlined above, please sign the Change Order, and return to the undersigned at Patrick. Receipt of the executed documents will be considered a Notice to Proceed. This proposal is considered valid for 30 days after the date of this letter proposal. We appreciate the opportunity to provide you with this proposal. If you have any questions, please feel free to contact us at your earliest convenience. We continue to appreciate the opportunities that the City has provided to Patrick to be of service, and we are committed to the successful implementation of this important project. Sincerely, PATRICK ENGINEERING INC. ht ands herd A Richard M. Frgndt\e.E. Gary F. Goodheart, P.E. Senior Project Manager Vice President RMF:rmf Attachments: Project Change Order p:\lisle\west chicago city of\21653.008 srp west chicago\administration\change orders\change order cO5\change order cOS gas station remediation 2019.docx ===== PDF PAGE 47 ===== [Extraction: OCR (rendered-page OCR)] F x; CLIENT CHANGE ORDER poe ie 3 28g ENGINEERING PATRICK ENGINEERING INC. 4970 Varsity Drive ® Lisle, Illinois 60532 Phone: 630-795-7200 ® Fax: 530-434-8400 Change Order No.: 005 To: Mr. Michael Guttman Clty Administrator City of West Chicago Change Order Date: 06/07/19 475 Main Street West Chicago, Illinois 60185 Patrick Project No.: 21653.008 Original Contract / W.O Date: 01/19/16 Client Contract No.: Reference: Patrick is requesting to make the following chan ges in this Contract: Perform an environmental remediation of the 139 West Washington Street former gas station site in accordancee with the attached Patrick Engineering letter Proposal dated June 07, 2019 The original Contract Sum was Sereteeeaneeneetasscecaeeenssacsnessscesesonsestsesssssssssussssucszussasssatesasiectssssesseseees .- $9,000.00 $804,500.00 $813,500.00 The Contract / Work Order Sum will be Increased by this Change Order -- $575,000.00 The new Contract / Work Order SUM including this Change Order will be .. $1,388,500.00 The Contract / Work Order TIME will be Increased by 180 days 12/31/19 City OF WEST CHICAGO - PATRICK ENGINEERING INC. Client Cc. Signature Sighstufe Jeffrey C. Schuh Printed name Printed Name President Title Title 06/07/19 Date Date ® Upon approval, retum one (1) signed Change Order to the Patrick Engineering Project Manager Internal Quality Control (Approvals do not authorize Patrick to proceed with any work contemplated by this Change Order.) Proj. Mgr approval of C.O.: RMF Supervisor approval of C.0.: GFG Ref: Patrick Engineering Inc. Partnering to Build Better Infrastructure 08271518 Page 1 of 1