===== PDF PAGE 29 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: B.D. Resolution No. 20-R-0007 — Layne Christensen Company - Approval of Contract for Professional Services Related to COMMITTEE AGENDA DATE: February 6, 2020 the Rehabilitation of the Pump and Motor Assembly COUNCIL AGENDA DATE: Feb 17, 2020 Associated with the City’s Well Station No. 8 —* STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works sauaturs’ 27 Rocky Horvath, Utility Superintendent APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE. ITEM SUMMARY: The current pump and motor assembly associated with Well Station No. 8, located at 1255 Helena Drive, is a Bryon Jackson assembly installed in March of 1988. The Byron Jackson well pump operates at a depth of approximately 343’ below ground and is rated to pump approximately 700 gallons per minute (gpm). The 40 HP Byron Jackson Type H submersible motor has a mercury seal versus a mechanical seal. In summer 2019 a decrease was observed in the pump’s performance and the well was placed out of service in November 2019 when its performance averaged less than 100 gallons per minute. Byron Jackson assemblies are generally known to last approximately ten (10) to fifteen (15) years before needing inspection and services/rehabilitation. Well Station No. 8’s was last serviced in 2005. Due to its history of being a factory-authorized sales and service representative for Byron Jackson pumps and motors (including those containing mercury seals), and its history of servicing the City’s Byron Jackson well assemblies, staff solicited a proposal from Layne Christensen Company (Layne) of Aurora, Illinois, to pull and rehabilitate the well assembly at Well Station No. 8 (see attached proposal). Layne’s proposal includes a complete rebuild and rehabilitation of the existing well equipment including a television survey of the well casing. The estimated total for these services is $68,140.00. One additional item addressed in Layne’s proposal is replacement of the well motor, if needed. The existing motor has a mercury seal system that needs to be inspected before reinstallation. If inspection determines the mercury seal has failed and cannot be reused, a factory exchange replacement motor has been quoted at a net cost of $59,770.00. For a total project cost estimated at $127,910.00. Since the well is currently inoperable, City staff recommends the rehabilitation of the well assembly associated with Well Station No. 8 before the start of the peak summer water system demand. Therefore, staff recommends that a professional services contract be awarded to Layne Christensen Company of Aurora, Illinois, related to the rehabilitation of the pump and motor assembly at the City’s Well Station No. 8, for an amount not to exceed $128,000.00. ACTIONS PROPOSED: Approve Resolution No. 20-R-0007 authorizing the Mayor to execute a contract with Layne Christensen Company for professional services related to the rehabilitation of the pump and motor assembly at the City’s Well Station No. 8 for an amount not to exceed $128,000.00. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.