===== PDF PAGE 35 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: Resolution No. 20-R-0054 - IDOT Local Agency AGENDA ITEM NUMBER: 8-40. _ Agreement for Federal Participation for Construction and Construction Engineering Costs for the Prince Crossing COMMITTEE AGENDA DATE: October 1, 2020 Road Resurfacing Project COUNCIL AGENDA DATE: October 5, 2020 Resolution No. 20-R-0055 — IDOT Resolution for Improvement Under the Illinois Highway Code for Use of Motor Fuel Tax Funds as City’s Local Share of Construction and Construction Engineering Costs for the Prince Crossing Road Resurfacing Project STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE. ITEM SUMMARY: The Prince Crossing Road Resurfacing Project mainly consists of roadway resurfacing with sidewalk curb ramp upgrades, detectable warnings, pavement markings, detector loop replacement, utility structure adjustments, recessed reflective pavement markers, pavement markings, and final restoration of Prince Crossing Road from North Avenue (Illinois Route 64) to Geneva Road (DuPage County Highway 21). The project has a total length of 1.79 miles. See attached map for additional clarification. With final design plans and specifications completed and approved by IDOT, the project has been programmed for IDOT’s letting of Friday, January 15, 2021. Pending contract award by IDOT, construction is anticipated to commence in May 2021. The engineer's estimate of construction cost for said project is $978,927.00 and construction engineering services are estimated at $48,946.00, for a total estimated project cost of $1,027,873.00. Seventy percent (70%) of the total estimated project cost (not to exceed $719,511.00 per the attached Local Agency Agreement) are to be funded through the Surface Transportation Program (STP) grant, which is Federal funding administered by the Illinois Department of Transportation (IDOT). Therefore, IDOT forms and contracts must be utilized and IDOT procedures must be strictly observed and followed. Given such, the City of West Chicago must execute a Local Public Agency Agreement for Federal Participation (BLR 05310) with the IDOT (see attached). Said Agreement must be executed and returned to IDOT prior to November 16, 2020 to remain on the January letting. Please note that the Local Agency Agreement as written is based on an engineer's cost estimate of $1,027,873.00, which was generated as part of the funding application process, which was submitted prior to completion of actual design services. Previously, IDOT would require a municipalities to execute Agreement that were based on actual bid results/contract award values. However, IDOT has changed its procedures and now requires executed Agreements based on engineer's cost estimates prior to letting. The City’s share of the project’s construction costs will be funded with Motor Fuel Tax funds (01-09-26- 4807) in which adequate funds will be budgeted in FY 2021 for this street improvement project. ===== PDF PAGE 36 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Use of Motor Fuel Tax funds as the City’s local share of construction and construction engineering costs requires an IDOT Resolution for Improvement Under the Illinois Highway Code (BLR 09110) to be executed by the City Clerk and submitted to IDOT (see attached). Staff recommends execution of the attached Local Public Agency Agreement for Federal Participation (BLR 05310) and the Resolution for Improvement Under the Illinois Highway Code (BLR 09110). ACTIONS PROPOSED: Approve Resolution No. 20-R-0054 authorizing the Mayor to execute a Local Public Agency Agreement for Federal Participation (BLR 05310) between the Illinois Department of Transportation and the City of West Chicago for STP grant funding for construction and construction engineering costs related to the Prince Crossing Road Resurfacing Project; and approve Resolution No. 20-R-0055 authorizing the City Clerk to execute an Illinois Department of Transportation Resolution for Improvement Under the Illinois Highway Code (BLR 09110) for use of Motor Fuel Tax funds for the City’s local share of the project’s construction and construction engineering costs. COMMITTEE RECOMMENDATION: Pending recommendation from the Infrastructure Committee at its meeting on October 1, 2020.