===== PDF PAGE 65 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ~ INFRASTRUCTURE COMMITTEE _. AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: S.A. Resolution No. 21-R-0006 — Engineering Resource Associates, Inc. - Professional Engineering Services COMMITTEE AGENDA DATE: February 4, 2021 Agreement to Provide Environmental Assessment and COUNCIL AGENDA DATE: February 15, 2021 Hydraulic Modeling Services Related to the 2024 Town Road Reconstruction Project STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works sarin APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: In 2020, City Staff applied through the DuPage Mayors and Managers Conference for Illinois Department of Transportation (IDOT), Surface Transportation Program (STP) funding for the reconstruction and widening of Town Road between Forest Avenue and Illinois Route 38 (Roosevelt Road). With an engineer's estimate of construction cost in the amount of $2,442,189.00, including $222,017.00 for engineering construction oversight services, the project was approved for funding in Fiscal Year 2024 at a 70/30 cost share ratio. Therefore, the IDOT will program funding for 70% of actual construction costs, not to exceed $1,709,532.00, and the City will be responsible for funding the balance (approximately $732,657.00 per the current engineer’s estimate). IDOT forms and contracts must be utilized and IDOT procedures and milestones must be strictly observed and followed. One of the first steps is to complete an Environmental Assessment which will include, but is not limited to, an evaluation of area flora and fauna, a wetland delineation, an endangered species determination, and evaluation of riparian environment impacts. In addition, because the project will include roadway widening of Town Road, an existing box culvert under Town Road must be extended requiring the need for hydraulic modeling of the Kress Creek tributary (which is identified as FEMA regulatory floodplain/floodway) and analysis of the indirect impact to existing wetlands as a result of potential changes to hydrology. Being very familiar with Federal, State, and DuPage County environmental regulations and permitting requirements, staff consulted with and received a proposal, in the amount of $28,100.00, from Engineering Resource Associates Inc. (ERA) of Warrenville, Illinois, to provide engineering services associated with an Environmental Assessment as referenced above. Staff recommends awarding a Professional Engineering Services Agreement to ERA in an amount not to exceed $28,100.00. Adequate funds are available in the Capital Projects Fund for said engineering services. ACTIONS PROPOSED: Approve Resolution No. 21-R-0006 authorizing the Mayor to execute a Professional Engineering Services Agreement with Engineering Resource Associates, Inc., for an amount not to exceed $28,100.00, to provide Environmental Assessment and Hydraulic Modeling Services related to the 2024 Town Road Reconstruction Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.