===== PDF PAGE 6 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: _4_,~-4~~- - Resolution No. 21-R-0012 - Contract Award - Starnet Technologies for Services Related to the Lift Station #1 COMMITTEE AGENDA DATE: March 4, 2021 Control Building Repair Project COUNCIL AGENDA DATE: March 15, 2021 - ./_,,,4 STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works SIGNATUREf -__,,:.~~-~-,.Z:===:::::....._~ / APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE _________ _ ITEM SUMMARY: On December 25, 2020, a motorist drove his vehicle into the control building for Lift Station #1, located adjacent to the Aspen Ridge Apartments parking lot (1450 South Neltnor Boulevard (IL Route 59)), causing significant damage, including shifting the building from its foundation (see attached pictures). A police report was filed and the responsible party is identified. The City has completed the insurance claim process with the Intergovernmental Risk Management Agency (IRMA) and funds for repairs have been authorized. The control building at Lift Station #1 was originally constructed and installed by Starnet Technologies (Starnet) of Franksville, Wisconsin, and is modular in its construction (i.e., building components can be removed and replaced). As Starnet is most familiar with the building fabrication, City staff obtained a proposal from Starnet to complete repairs. Starnet's proposal, based on visible damages, is estimated at $25,472.40. However, additional costs are anticipated once the exterior and interior panels are removed, the building is shifted back into place, and a structural inspection is completed. Therefore, City staff is seeking authorization to waive the competitive bidding process and award a contract to Starnet Technologies for needed repairs to the control building for Lift Station #1 for an amount not to exceed $30,000.00. IRMA will reimburse the City for all associated repair costs. City staff anticipates that repairs will be completed by June 2021. ACTIONS PROPOSED: Waive the competitive bidding process and approve Resolution No. 21-R-0012 authorizing the Mayor to execute a Contract with Starnet Technologies of Franksville, Wisconsin, for an amount not to exceed $30,000.00, for services related to the Lift Station #1 Control Building Repair Project. COMMITTEE RECOMMENDATION: ===== PDF PAGE 7 ===== [Extraction: embedded PDF text] RESOLUTION NO. 21-R-0012 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT AGREEMENT WITH STARNET TECHNOLOGIES FOR PROFESSIONAL SERVICES RELATED TO THE LIFT STATION NO. 1 CONTROL BUILDING REPAIR PROJECT BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a Contract Agreement for Professional Services related to the Lift Station No. 1 Control Building Repair Project, between the City of West Chicago and Stamet Technologies, for an amount not to exceed $30,000.00, in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 15th day of March 2021. AYES: NAYES: ABSTAIN: ABSENT: Mayor Ruben Pineda ATTEST: City Clerk Nancy M. Smith ===== PDF PAGE 8 ===== [Extraction: OCR (rendered-page OCR)] 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos Star denotes point of impact. Northwest building corner ===== PDF PAGE 9 ===== [Extraction: OCR (rendered-page OCR)] 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos Vv o a £ ra ro) 2 = fa] a. = 2 £ ===== PDF PAGE 10 ===== [Extraction: embedded PDF text] 12/25/ZOZO 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos Point of impact. Note the impact shifted pole, which is 5' deep and filled with cement. ===== PDF PAGE 11 ===== [Extraction: OCR (rendered-page OCR)] 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos ===== PDF PAGE 12 ===== [Extraction: OCR (rendered-page OCR)] @ s, 2 -] oe v = = oO a ° a c < 3 a o =a ° 3p 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos ===== PDF PAGE 13 ===== [Extraction: OCR (rendered-page OCR)] 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos ===== PDF PAGE 14 ===== [Extraction: OCR (rendered-page OCR)] 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos =| Wall pushed in 2-3” ===== PDF PAGE 15 ===== [Extraction: embedded PDF text] 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos Cracked Wall Panel ===== PDF PAGE 16 ===== [Extraction: OCR (rendered-page OCR)] 12/25/2020 1450 S Neltnor Boulevard Lift Station #1 Accident Building Damage Photos