===== PDF PAGE 38 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: 6-E. Resolution No. 21-R-0012 - Contract Award — Starnet Technologies for Services Related to the Lift Station #1 COMMITTEE AGENDA DATE: March 4, 2021 Control Building Repair Project COUNCIL AGENDA DATE: March 15, 2021 STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works se te APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATUR' ITEM SUMMARY: On December 25, 2020, a motorist drove his vehicle into the control building for Lift Station #1, located adjacent to the Aspen Ridge Apartments parking lot (1450 South Neltnor Boulevard (IL Route 59)), causing significant damage, including shifting the building from its foundation (see attached pictures). A police report was filed and the responsible party is identified. The City has completed the insurance claim process with the Intergovernmental Risk Management Agency (IRMA) and funds for repairs have been authorized. The control building at Lift Station #1 was originally constructed and installed by Starnet Technologies (Starnet) of Franksville, Wisconsin, and is modular in its construction (i.e., building components can be removed and replaced). As Starnet is most familiar with the building fabrication, City staff obtained a proposal from Starnet to complete repairs. Starnet’s proposal, based on visible damages, is estimated at $25,472.40. However, additional costs are anticipated once the exterior and interior panels are removed, the building is shifted back into place, and a structural inspection is completed. Therefore, City staff is seeking authorization to waive the competitive bidding process and award a contract to Starnet Technologies for needed repairs to the control building for Lift Station #1 for an amount not to exceed $30,000.00. IRMA will reimburse the City for all associated repair costs. City staff anticipates that repairs will be completed by June 2021. ACTIONS PROPOSED: Waive the competitive bidding process and approve Resolution No. 21-R-0012 authorizing the Mayor to execute a Contract with Starnet Technologies of Franksville, Wisconsin, for an amount not to exceed $30,000.00, for services related to the Lift Station #1 Control Building Repair Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.