===== PDF PAGE 32 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: . AGENDA ITEM NUMBER: A ! ; Resolution No. 21-R-0022 - Contract Award — Trotter and Associates, Inc. for Engineering Design Services Related to | COMMITTEE AGENDA DATE: April 1, 2021 the Booster Station #8 Rehabilitation Project COUNCIL AGENDA DATE: April 5, 2021 STAFF REVIEW: Robert E. Flatter, P.E., Director of Public Works SS ——— APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE, ITEM SUMMARY: Within the Fiscal Year 2021 Water Fund Budget, money has been included for professional engineering design services related to the Booster Station #8 Rehabilitation Project (construction anticipated in Fiscal Year 2022). Booster Station #8, located at 1255 Helena Drive, is one of the City’s two booster stations, with associated ground storage tanks, used to increase available water in the distribution system during peak demand periods, which is accomplished with pumps at the booster station that operate based on water system pressure. As more water is drawn or needed from the water distribution system, the overall system pressure drops. Booster stations are used to maintain system pressure, fill water towers, and provide water to fight fires. The site/property containing Booster Station #8 also contains Well Station #8 and Well Station #9. Booster Station #8 and Well Station #8 (shallow well) were initially constructed together in 1989. Well Station #9 (deep well) was constructed in 1993. No major improvements have been completed at Booster Station #8 since its original construction. Well Station #8 was rehabilitated in 2020 and Well Station #9 was rehabilitated in 2018. After more than 31 years of service life, improvements are warranted at Booster Station #8; the electrical system and motor control equipment is antiquated and unreliable. Anticipated improvements associated with the Booster Station #8 Rehabilitation Project (Project) will include, but are not limited to, the following: e Replacement of three existing 75 HP pumps and associated piping and valves. Replacement of existing well control panels. Replacement of generator controls. Addition of variable frequency drives on the three new 75 HP pumps. Replacement of pump starters in the existing motor control cabinet (MCC). SCADA improvements to incorporate changes and upgrade Programmable Logic Controller (PLC). Electrical system improvements/upgrades as determined necessary. Please note that the existing on-site 0.5 MG ground storage tank also requires improvements, but will be addressed under a separate Infrastructure Committee agenda write-up. Trotter and Associates, Inc. (Trotter) of St. Charles, Illinois, has recently completed several projects of this nature and previously performed design work for the City. Therefore, City staff asked Trotter for an engineering design proposal for the proposed project. Engineering design services will include, but not be limited to, coordination with effected agencies (i.e., Illinois Environmental Protection Agency (IEPA)), ===== PDF PAGE 33 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO permit applications, development of design plans, development of project specifications, and development of bid documents. Trotter and Associates submitted a cost proposal of $68,900. It is staff's recommendation that a contract be awarded to Trotter and Associates, Inc. of St. Charles, Illinois, for engineering design services related to the Booster Station #8 Rehabilitation Project, for an amount not to exceed $68,900.00. ACTIONS PROPOSED: Approve Resolution No. 21-R-0022 authorizing the Mayor to execute a contract with Trotter and Associates, Inc., in an amount not to exceed $68,900.00, for engineering design services related to the Booster Station #8 Rehabilitation Project. COMMITTEE RECOMMENDATION: Pending recommendation from the Infrastructure Committee at its meeting on April 1, 2021.