===== PDF PAGE 74 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO CITY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: AGENDAITEMNUMBER: O&M. | Resolution No. 21-R-0067 — First Amendment to the Contract with Thomas Engineering Group, LLC for Construction Oversight Services of Public Improvements to be constructed by Pulte Home Company, LLC for the Trillium Farm Subdivision Development Project COMMITTEE AGENDA DATE: COUNCIL AGENDA DATE: August 2, 2021 ae SIGNATURE Get 1. WeNes SIGNATURE STAFF REVIEW: Timothy R, Wilcox, Assistant Director of Public Works APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman ITEM SUMMARY: On September 8, 2021, City Council approved Resolution No. 20-R-0049 authorizing the Mayor to execute a contract with Thomas Engineering Group, LLC (TEG) for construction oversight services of public improvements, to be constructed by Pulte Home Company, LLC, for the Trillium Farm Subdivision Development Project, for an amount not to exceed $109,830.24. Pulte Home Company, LLC is developing an 84 home subdivision, known as Trillium Farm, on approximately 34.97 acres of land generally located at the southeast corner of Gary's Mill Road and Purnell Road in unincorporated DuPage County. The Subdivision includes construction of substantial public improvements, including, but not limited to, approximately 8,500 lineal feet of watermain and appurtenances, approximately 5,000 lineal feet of sanitary sewer main and appurtenance, approximately 7,000 lineal feet of storm sewer pipe and appurtenances, approximately 0.87 miles of residential roadways, approximately 27,300 square feet of public sidewalk, and a complete street light system. With a Pre-Annexation Agreement executed between Pulte Home Company, LLC and the City of West Chicago, said public improvements will ultimately become the ownership and maintenance responsibility of the City of West Chicago. Therefore, it is extremely important that the City continue to have full time inspection services conducted for all public improvements to ensure compliance with City standards. It is estimated that the original contracted amount or $109,830.24 will be exhausted by the end of July 2021. Based on the amount of work that has been completed, which consists of the off-site phase, and the majority of Phase 1, and the amount of work still required, which consists of Phase 2, and Phase 3, a supplement in the amount of $66,656.84 is being requested in order to continue to provided oversight services for the remaining public improvements. An estimate of cost is attached for your information. The above referenced services will be paid for using Capital Project Funds (08-34-53-4225): however, all costs incurred, plus a 25% administrative fee, will be reimbursed from Pulte Home Company, LLC per the Pre-Annexation Agreement and Appendix G of the City Code. ===== PDF PAGE 75 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 20-R-0067 authorizing the Mayor to execute the first amendment to the contract with Thomas Engineering Group, LLC for construction oversight services of public improvements, to be constructed by Pulte Home Company, LLC, for the Trillium Farm Subdivision Development Project, for an additional supplemental amount not to exceed $66,656.84. COMMITTEE RECOMMENDATION: Item did not go to Committee. ===== PDF PAGE 76 ===== [Extraction: OCR (rendered-page OCR)] Estimate of Remaining Time Required - Trillium Farm Subdivision llinois Department of Transportation Roule Work Remaing:Trillum Farm - Phase |, Hi, & II! Section County DuPage Project Trillium Farm-Phase1,2,&3 Totals Days Rate | 5 % Quantity Days Required £ £ ‘ &f Unit (Check One) @ English © metre === Sass See Sar STREET LIGHTS [MOA (Tae) (A AT STREET LIGHTING ASSEMBLIES BS SS Ee a 13 SIDEWALK Es ae ae ee! PHASE I! See | faa Sa) Se) UTILITIES aes WATER SERIES ISANITARY SEWERMAIN PIPE FOOT aa 200 8" SOR 26 SANITARY SEWER SERVICE EACH RITARY SEWER STRUCTURE no oe So [SANITARY SEWER TESTING ACH ao SANITARY SEWER TELEVISIN EACH ES ER ees RCP STORM SEWER BE a [STORM SEWER STRUCTURES TEACH a a Bae CN re SS (SS Se aa SUBGRADE, SUBBASE, TESTING Sayo | 70es | as000 | 2a | savo—| srt] 8000 | 17 —] COMSNATON COAG. WEE. [Foat—|- ars |-t900-|- 297 | COMBINATION CC&G, TYPE 8-6.12 FOOT 4,073 1,500 Su} RL a See es es aT [STREET LIGHTING POLE FOUNDATIONS | Foor_| 8 | 2 | 0 ISTREETLIGHTING UN DUCT _—_—=S————S—S*dY SFT | 2100 | 500] 42 | STREET LIGHTING ASSEMBL 2 a SR a a PGC SIDEWALK & SUBBASE OFT 15,900 a aS SS a a | a ae ed eee ae a | | SST || SS | TT Ta (a (a WATER SERVICES EACH 76 Sanaa sewer umnrrr——————| —roo1—| wo} 200 | tJ 8" SOR 26 SANITARY SEWERSERVICE | EACH Tt 100 at [SANITARY SEWER STRUCTURES TEACH [Se SANITARY SEWER TESTING CE (es SANITARY SEWER TELEVISING PD) ee ee es IRCP STORMSEWER FOOT 034 oo ISTORMSEWERSTRUCTURES EACH a se ss EES ae a eS ee say ISUBGRADE, SUBBASE, TESTING | SQ YO | 3.913] 3,5000 | 09 | JBAM, S"NSOO 2.800 [6.000 fs [HMA SURFACE COURSE, 2°.N50_ | SQYO 2.800 [7,000 [04 COMBINATION CC&G, TYPE 8-6.12 nl i Sim Los Se 25 STREET LIGHTS Le) eS (Ta STREET LIGHTING POLE FOUNDATIONS Foor a ee STREET LIGHTING UNIT DUCT FOOT ee aaa STREET LIGHTING ASSEMBLIES EACH hn SS a 26 DO A ls), RE | EL S| a JPCC SIDEWALK &SUBBASE SET 4200 1300 7 ee aa Se Sa (ES 2 ee re eee CUTS ae Cost of Construction Observation Total Days $ 40,085.76 UTILITIES (Tot 43.8 $ 8,785.92 ROADWAY&CURB (Total | 96 $ 13,544 96 STREETLIGHTS (Total =| —=~dLCisgg $ 19,219.20 SIDEWALK (Tota)} | Total: $ 8 64 Budget Left: $ 4,979.00 Budget Needed: $ 66,656.84 Made by:_prid@ugiawit2 Masters Date 7/18/2024 54 33 21.0 BDE 220A (06/24/06) (Rev. 02/16/08) ===== PDF PAGE 77 ===== [Extraction: OCR (rendered-page OCR)] RESOLUTION NO. 21-R-0067 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A FIRST AMENDMENT TO THE CONTRACT WITH THOMAS ENGINEERING GROUP, LLC FOR CONSTRUCTION OVERSIGHT SERVICES OF PUBLIC IMPROVEMENTS TO BE CONSTRUCTED BY PULTE HOME COMPANY, LLC FOR THE TRILLIUM FARM SUBDIVISION DEVELOPMENT PROJECT BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a First Amendment to the Contract for Construction Oversight Services of public improvements to be constructed by Pulte Home Company, LLC. for the Trillium Farm Subdivision Development Project, between the City of West Chicago and Thomas Engineering Group, LLC, for an amount not to exceed $66,656.84 in substantially the form attached hereto and incorporated herein as Exhibit “A”, thus increasing the upper limit of the Contract from $109,830.24 to $176,487.08 in substantially the form attached hereto and incorporated herein as Exhibit “A”. APPROVED this 2" day of August 2021. AYES: NAYES: ABSTAIN: ABSENT: Mayor Ruben Pineda ATTEST: City Clerk Nancy M. Smith ===== PDF PAGE 78 ===== [Extraction: OCR (rendered-page OCR)] FIRST AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF WEST CHICAGO, ILLINOIS AND THOMAS ENGINEERING GROUP, LLC. FOR PROFESSIONAL ENGINEERING SERVICES This, FIRST AMENDMENT, made this day of August 2021 between CITY OF WEST CHICAGO, a body politic and corporate, with offices at 475 Main Street, West Chicago, Illinois 60185 (hereinafter referred to as the “CITY”) and THOMAS ENGINEERING GROUP, LLC., licensed to do business in the State of Illinois, with offices at 238 South Kenilworth Avenue, Suite 100, Oak Park, IL 60302 (hereinafter referred to as the “CONSULTANT”); RECITALS WHEREAS, the Illinois General Assembly has granted the CITY authority to enter into agreements for the purposes of providing professional services (pursuant to the Municipal Code 65 ILCS 5/1-1-10, et. seq.); and, WHEREAS, the CITY and CONSULTANT had previously entered into an AGREEMENT, dated September 17, 2020, for professional engineering services related to construction oversight services related to the Trillium Farm Subdivision Development Project; and, WHEREAS the CONSULTANT used CEMCON’s Engineers’ Estimate of Probable Cost based on the estimate of time to construct all water, sewer, drainage, and roadway improvements, including all phases for their proposal of cost; and invoiced only for the actual number of hours of oversight work; and, WHEREAS, the CONSULTANT has completed Offsite, and most of Phase 1 oversite inspection services to be provided by the CONSULTANT in substantial compliance with Exhibit “A” of the original AGREEMENT, actual cost of construction oversight for the remainder of work to be completed will exceed the original AGREEMENT amount; and, WHEREAS, the CONSULTANT is willing to continue to provide the required services for the remainder of Phase 1, Phase 2, and Phase 3, identified under the original AGREEMENT; and, WHEREAS, continued construction oversight services is in the best interest of the CITY; and, WHEREAS, the CONSULTANT has requested additional compensation for continuing construction oversight services requested by the CITY; and, WHEREAS, the CITY wishes to memorialize the terms and conditions of its FIRST AMENDMENT with the CONSULTANT. NOW, THEREFORE, in consideration of the promises, the mutual covenants, terms, and conditions herein set forth, and the understandings of each Party to the other, the Parties do hereby mutually covenant, promise and agree as follows: ===== PDF PAGE 79 ===== [Extraction: OCR (rendered-page OCR)] 1. Concerning the AGREEMENT dated September 17, 2020, on Page 1, under “RECITALS”, the third “WHEREAS” shall be amended to read “...an amount not to exceed $176,487.08”. 2. Concerning the AGREEMENT dated September 17, 2020, on Page 3, the section entitled “6.0 COMPENSATION”, under subsection 6.5 shall be amended to read, “... Agreement shall not under any circumstances exceed $176,487.08. In the event...” All other provisions of the original AGREEMENT shall remain unchanged. IN WITNESS OF, the parties set forth their hands and seals as of the date first written above. CITY OF WEST CHICAGO THOMAS ENGINEERING GROUP, LLC. OF ILLINOIS, BY: BY: RUBEN PINEDA KEVIN C. VANDEWOESTYNE MAYOR MUNICIPAL DEPARTMENT HEAD ATTEST BY: ATTEST BY: NANCY M. SMITH NAME: CITY CLERK TITLE: