===== PDF PAGE 33 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: _©-2. _ Resolution No. 21-R-0076 — Contract Execution— Matocha Associates for Professional Architectural Design Services Related to the 200 Main St Rehabilitation Project STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works SIGNATURE ee APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman COMMITTEE AGENDA DATE: September 2, 2021 COUNCIL AGENDA DATE: September 20, 2021 SIGNATURE ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main St. The primary entrance to the ground floor is from Main St while a secondary entrance to the lower level is from Turner Ct. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. In 2015, the City hired Matocha Associates, an architectural firm, alongside Tassone Architects, masonry architectural firm and Structural Resources, Inc. (SRI), a structural engineering firm to evaluate the deteriorating conditions of the building. These evaluations determined multiple issues with the building including, but not limited to, deteriorating masonry fagade, structural building settlement, non-compliance with current American Disability Act (ADA) requirements, fire escape related non-compliance, leaking pipes, asbestos, roof damages, etc. All of these concerns were expected due to the age of the building. Since then, the City has removed all the piping in the building as well as all of the asbestos. This project has sat idle for the last couple of years. The City wishes to revive the project again by re-engaging the firms that have worked on it in the past. Matocha Associates, under its current Phase | proposal will be responsible for preparing preliminary architectural design options for each story, preliminary mechanical, electrical and plumbing drawings for each of those option as well as opinion of probable cost. The conceptual options will include ADA compliance and multiple configurations for each story for the City to review. Once the City has selected the option with which it would like to proceed, Matocha will prepare final construction drawings and bid specifications under an amendment to this Agreement. This multi-phase approach will allow the City the flexibility to select the design option with definitive design scope prior to engaging into final construction drawings. The above referenced architectural design services will be paid for using Downtown TIF District Funds (09-34-54-4801), in which $250,000 has been budgeted. The design will move forward once approved by the City Council and is scheduled to take 12-16 weeks for completion. ===== PDF PAGE 34 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 21-R-0076 authorizing the Mayor to execute a Contract with Matocha Associates of Hinsdale, Illinois, in an amount not to exceed $38,000, for architectural design services related to the 200 Main St Rehabilitation Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 5-0 for approval.