===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: o-A. Resolution No. 21-R-0086 — Contract Award — Layne Christensen Company for Professional Services Related to | COMMITTEE AGENDA DATE: October 7, 2021 the 2021 Well Station No. 7 Rehabilitation Project Sen eee AEP oor tencail STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works sienature Wf APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: Well Station No. 7, located at 627 W Hawthorne Lane, is one of four City-owned shallow wells with a Byron Jackson well pump and motor assembly set at a depth of approximately 250 feet and rated to pump 720 gallons per minute. The well was originally constructed in 1982 and was last serviced in 2006. The service at that time included replacement of the motor assembly and all column pipe. Starting in 2015, Well No. 7 began to exhibit a decline in capacity (gallons per minute). As of August 2021, the well capacity was down to 621 gallons per minute. This reduced capacity is indicative of overall problems with the well assembly. It is believed that a hole has developed in the column pipe of the well. If left unchecked, the motor will likely experience complete failure or, in the worst case, the column pipe may separate and drop the well pump and motor to the bottom of the casing. A casing is the pipe structure that is placed in the hole drilled in the earth to maintain the well opening. The well assembly is due for inspection and service. Due to its history servicing the well and original equipment installation, staff solicited a proposal from the Layne Christensen Company to pull, inspect, and rehabilitate the well assembly. Layne’s proposal includes a complete rebuild and rehabilitation of the existing well equipment, including a television survey of the well casing. This proposal also contains estimated provisions for new column pipe, cable, cleaning and re-coating of the existing column pipe, and overall inspection of all well components. The estimated total for these services is $89,657.00. One additional item addressed in this proposal is replacement of the well motor, if needed. The existing motor has a mercury seal system, which needs to be inspected before reinstallation. If inspection determines the unit cannot be reused, a new motor has been quoted at $63,989.00, for a total worst-case scenario project cost of $153,646.00. At this time staff does not foresee a need to replace the motor. Following service, the well assembly will be re-installed, tested, and returned to service. City staff recommends the rehabilitation of the well assembly before the start of our proposed 2022 Booster Station Rehabilitation Projects. To accomplish this, staff recommends that the City Council authorize the Mayor to execute a contract with Layne Christensen Company, for an amount not to exceed $153,646.00, for services necessary to remove, inspect, repair, re-install, test and place the well assembly at Well Station No. 7 back into operation. There is $200,000.00 budgeted in the Water Fund (06-34-47-4420) for pump station repairs, which is adequate to rehabilitate Well Station No.7, including the replacement of the motor, if needed. ===== PDF PAGE 41 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 21-R-0086 authorizing the Mayor to execute a contract with the Layne Christensen Company, for an amount not to exceed $153,646.00 for professional services related to the 2021 Well Station No. 7 Rehabilitation Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 5-0 for approval.