===== PDF PAGE 36 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE ___AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: &. 8. Resolution No. 21-R-0098 — Contract Award — 2021 A ‘ : COMMITTEE AGENDA DATE: November 4, 2021 Engineering Assistance for WTP SCADA Upgrade / COUNCIL AGENDA DATE: November 15, 2021 Enhancement STAFF REVIEW: Joseph Munder, Water Treatment Plant Superintendent SIGNATU Q APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The Water Treatment Plant (WTP) utilizes a system of Local Control Panels (LCPs) to provide control and data collection from the various treatment vessels and appurtenances throughout the plant. There are ten (10) LCP’s in the Plant and each is equipped with a small computer commonly called a PLC (Programmable Logic Controller). These PLCs serve as a local point of contact for the items (e.g. valves) that are controllable and for items that provide feedback (e.g. meters) to the operators. The PLCs have reached the end of their life cycle and are in need of replacement. The currently installed devices are no longer produced by the manufacturer and replacement parts have become difficult to obtain. The remainder of the components in the LCPs are also aged to the point where new devices are warranted. The Variable Frequency Drives (VFDs) have also reached the end of their life cycle. These are critical items that allow the WTP operators to control the output of finished water to the distribution system. The controlling computer that runs the existing SCADA (Supervisory Control and Data Acquisition) software was most recently replaced in 2015. That computer is now two iterations out of date in its basic operation software (Windows 7 versus Windows 11). A new SCADA computer will be needed as well as a new or upgraded software package will be required to complete the upgrades and enhancements planned. It is in this light that staff has recommended a replacement and enhancement project for the SCADA System as well as the VFDs. The complexity of the contemplated plan has led staff to request engineering assistance in preparing plans and specifications for the intended project. Four engineering firms were contacted and proposals were requested. Each of the firms participated in preliminary discussions with WTP staff to determine the scope and range of the planned upgrades and enhancements. Each of these firms can be considered expert in SCADA engineering and design. Trotter and Associates, Inc. of St. Charles, IL proffered the lowest responsible proposal of $51,938.00 to provide engineering (design and construction) services to the City of West Chicago for the WTP SCADA/LCP project. Staff recommends that a contract be awarded to Trotter and Associates, Inc. to provide Engineering Services for the WTP SCADA/LCP project. Adequate funds have been budgeted in the Water Fund, Water Treatment Plant Operations — Other Capital Outlay (06-34-48-4806) to cover this expenditure. The cost of the actual improvements will be budgeted for in the FY2022 budget. ===== PDF PAGE 37 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 21-R-0098 authorizing the Mayor to execute a contract with Trotter and Associates, Inc., to provide engineering services for the WTP SCADA/LCP project for an amount not to exceed $51,938.00 for Fiscal Year 2021 and extending into Fiscal Year 2022. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.