===== PDF PAGE 7 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: _L±--11:..........,1!2""""""'".._, __ Resolution No. 21-R-0101 - Intergovernmental Agreement with the Illinois Department of Transportation for FILE NUMBER: ------ Maintenance of Traffic Signals on State Highways within COMMITTEE AGENDA DATE: December 2, 2021 the City of West Chicago COUNCIL AGENDA DATE: December 20, 2021 STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE-...:..~__..l_.J\..-==~'----~--=--- APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE _________ _ ITEM SUMMARY: There are eighteen signalized intersections and locations with traffic control devices along State highways located with West Chicago. These devices are maintained by the Illinois Department of Transportation (IDOT), but the City is responsible for payment of a percentage of maintenance via an Intergovernmental Agreement (IGA) with IDOT. The City recently received notice from the IDOT that our existing IGA for maintenance of traffic signals on State highways has expired and a new IGA needs to be executed by both parties. The existing IGA was effective from July 1, 2011 thru June 30, 2021. The attached Intergovernmental Master Agreement for State maintained traffic signals on State highways within the City of West Chicago has been drafted by IDOT in substantially the same form as our previous IGA except for in the new IGA, the City is now responsible to invoice IDOT for the energy costs related to the traffic signal; however, per the City's existing franchise agreement with ComEd (Ordinance 92-0- 2587), the City is not invoiced for energy costs related to the traffic signals. The new IGA requires the City to maintain the pavement markings at all signalized intersections on State highways, which is consistent with IDOT's practice in neighboring municipalities. Exhibit A of the IGA identifies the percentages of maintenance and energy charges each agency is responsible for per location. The new IGA will be effective from July 1, 2021 thru June 30, 2031. An IGA with the West Chicago Fire Protection District (WCFPD) will be forthcoming in the near future that requires the WCFPD to pay for the initial installation cost of the emergency vehicle preemption (EVP) devices at traffic signals while City will be responsible for the ongoing maintenance of the EVPs. ACTIONS PROPOSED: Approve Resolution No. 21-R-0101 authorizing the Mayor to execute an Intergovernmental Agreement with the Illinois Department of Transportation for maintenance of traffic control devices located on State highways within City of West Chicago, for the term of July 1, 2021 thru June 30, 2031. COMMITTEE RECOMMENDATION: ===== PDF PAGE 8 ===== [Extraction: embedded PDF text] RESOLUTION NO. 21-R-0101 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE AN INTERGOVERNMENTAL AGREEMENT WITH THE ILLINOIS DEPARTMENT OF TRANSPORA TION FOR MAINTENANCE OF TRAFFIC CONTROL DEVICES LOCATED ON STATE HIGHWAYS WITHIN THE CITY OF WEST CHICAGO FOR THE TERM OF JULY 1, 2021 THROUGH JUNE 30, 2031 BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute an Intergovernmental Agreement with the Illinois Department of Transportation for Maintenance of Traffic Control Devices located on State Highways within the City of West Chicago, for the term of July 1, 2021 through June 30, 2031, in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 20th day of December, 2021. AYES: NAYES: ABSTAIN: ABSENT: Mayor ATTEST: City Clerk ===== PDF PAGE 9 ===== [Extraction: embedded PDF text] Illinois Department of Transportation Office of Highways Project Implementation I Region 1 I District 1 201 West Center Court I Schaumburg, Illinois 60198-1098 September 3, 2021 The Honorable Ruben Pineda Mayor City of West Chicago 475 Main Street West Chicago, IL 60185 Dear Mayor Pineda: Enclosed for your signatures are three (3) counterparts of the Intergovernmental Master Agreements (IGA) for State maintained traffic signals and three (3) counterparts of the Intergovernmental Master Agreements for Governmental Body Maintenance of Traffic Control Devices for local maintained traffic signals on State highways within the corporate limits of the City of West Chicago (herein after called City). The existing Master Agreement between the City and the Illinois Department of Transportation (herein after called Department) will expire in the near future. Please note that the IGA has these clauses: G. Payment for Energy Costs. The DEPARTMENT will reimburse the of energy charges. B Billing. Bills shall be submitted to the DEPARTMENT on a quarterly basis. The amount billed shall be the costs incurred less any proceeds from third-party damage claims received during the billing period for repair of signals or devices that are the responsibility of the GOVERNMENTAL BODY. PLEASE BE AWARE OF THE FOLLOWING: It is imperative that the City sign the attached IGA. The Department will not be able to authorize any payments to City for the Department's share of utility costs until we can provide our financial department with a copy of a fully executed IGA. Therefore, in order for you to obtain reimbursement from the Department for any part of the traffic signal utility costs as shown in the Exhibit A in the Intergovernmental Agreement, we need City to sign the attached Agreement. Also, should the City decide it does not have the capability of providing the required level of service to the existing traffic signal(s) listed in the attached Exhibit A, this would be the opportunity to revise the maintenance responsibility in the Exhibit A A maintenance transfer will be determined after the approval of the District Engineer and a revised Exhibit A will be included in new IGA. ===== PDF PAGE 10 ===== [Extraction: embedded PDF text] The Honorable Ruben Pineda September 3, 2021 Page Two Please return the six (6) partially executed agreements to our office for final processing. We will send you a completed Agreement upon its execution by our Springfield Office. It is important that you forward the Agreement to: Ms. Lisa E. Heaven-Baum, P.E. Bureau Chief of Traffic Operations Illinois Department of Transportation 201 W. Center Court · Schaumburg, IL 60196 If you have any questions or need additional information, please contact Mrs. Brenda Kanthaphixay, Agreement Specialist, at 847-705-4175. Very truly yours, Jose Rios, P.E. Region One Engineer Bureau~i~~ ~-B±:~~Chief of Traffic Operations Enclosures ===== PDF PAGE 11 ===== [Extraction: embedded PDF text] INTERGOVERNMENTAL AGREEMENT This lnteragency Agreement is entered into between the City of West Chicago ("GOVERNMENTAL BODY") and the Department ofTransportation ("DEPARTMENT'') pursuant to the "Intergovernmental Cooperation Act" (5 ILCS 220) and in accordance with The DEPARTMENT's rules at 92 Ill. Adm. Code 544. 1. Governmental Body and the DEPARTMENT have a mutual interest in and the maintenance and apportionment of energy costs for traffic control devices located on State highways within or near the Governmental Body as shown on the attached Exhibit A, which is hereby made a part of this agreement. 2. In furtherance of said interests of, the entities agree: a. Cost. The DEPARTMENT and the GOVERNMENTAL BODY agree to the maintenance responsibility and to the division of energy costs, for the traffic signals and other traffic control devices listed on the attached Exhibit A. b. Maintenance. Modernization of traffic control devices is not covered under this agreement. It is agreed that the actual maintenance will be performed by the DEPARTMENT indicated on Exhibit A, either with its own forces or through contractual agreements c. Maintenance Level. It is agreed that the signals and devices shall be maintained to at least the level of maintenance specified in the attached Exhibit 8, which is hereby made a part of this agreement. It is understood this will meet the minimum requirements of the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways. Additional provisions regarding maintenance may be incorporated in this document (Exhibit B) upon agreement by both parties. d. Interconnect & Timing. The DEPARTMENT agrees to maintain all signal equipment and interconnects associated with interconnected signal systems or Advanced Traffic Management System and interconnects with at-grade railroad crossings, at DEPARTMENT maintained locations. The DEPARTMENT shall determine the signal timing to coordinate and regulate the flow of traffic. No signal timing shall be changed at any state system intersection without prior DEPARTMENT approval. The GOVERNMENTAL BODY shall submit to the DEPARTMENT any changes proposed in signal timings. e. Interconnections: Installation & Damage. The DEPARTMENT is not responsible for the cost of installing or maintaining traffic signals not on (but interconnected to traffic signals on) U.S. or State routes. Any damage done to State traffic signals in the attempt to connect local traffic signals shall be repaired to the DEPARTMENT's satisfaction and shall be the responsibility of the GOVERNMENTAL BODY. f. Master Monitoring Costs. Master controllers installed on State intersections for the coordination of traffic signals are primarily used for the traffic signals located on U.S. or 1 ===== PDF PAGE 12 ===== [Extraction: embedded PDF text] State routes. The GOVERNMENTAL BODY may connect traffic signals to a State-owned master controller or Advanced Traffic Management System for the coordination or operation of non-State-owned traffic signals, for the purpose of synchronizing time or gaining remote access. If the GOVERNMENTAL BODY desires a communications link to their office for monitoring purposes, the GOVERNMENTAL BODY shall pay the entire cost of installing and maintaining such monitoring system. g. Payment for Energy Costs. The DEPARTMENT will reimburse the GOVERNMENTAL BODY for the DEPARTMENTS proportionate share of the energy charges. h. Indemnification. Unless prohibited by State law, the GOVERNMENTAL BODY agrees to hold harmless and indemnify the DEPARTMENT, and its officials, employees, and agents, from any and all losses, expenses, damages (including loss of use), suits, demands and claims, and shall defend any suit or action, whether at law or in equity, based on an alleged injury or damage of any type arising from the actions or inactions of the GOVERNMENTAL BODY and/or the GOVERNMENTAL BODY's employees, officials, agents, contractors and subcontractors, and shall pay all damages, judgments, costs, expenses, and fees, including attorney's fees, incurred by the DEPARTMENT and its officials, employees and agents in connection therewith. GOVERNMENTAL BODY shall defend, indemnify and hold the DEPARTMENT harmless against a third-party action, suit or proceeding ("Claim") against the DEPARTMENT to the extent such Claim is based upon an allegation that a Product, as of its delivery date under this Agreement, infringes a valid United States patent or copyright or misappropriates a third party's trade secret. i. Emergency Vehicle Preemption Devices. The costs of installation, timing, phasing, and maintenance of emergency vehicle preemption systems shall be the sole responsibility of the GOVERNMENTAL BODY. Any Governmental Body must notify the DEPARTMENT of any change in the emergency vehicle preemption system. However, the DEPARTMENT reserves the right to approve or reject, at any time, the placement of such systems on its traffic signal equipment. j. Previous Agreements. All traffic signal and traffic control device maintenance and electrical energy provisions contained in presently existing agreements or understandings between the DEPARTMENT and the GOVERNMENTAL BODY for traffic signals and/or other traffic control devices covered by this Master Agreement shall upon execution of this Master Agreement by the DEPARTMENT be superseded and be of no force or effect. All parking ordinances and provisions bearing on items other than traffic signal and traffic control device maintenance and energy charges contained in presently existing agreements or letters of understanding between the DEPARTMENT and the GOVERNMENTAL BODY shall remain in full force and effect. 2 ===== PDF PAGE 13 ===== [Extraction: embedded PDF text] k. Modification. Exhibit A can be modified to add or delete signals or devices, but only by written revision signed by the Regional Engineer, the Engineer of Operations and the authorized representative for the GOVERNMENTAL BODY. The modification shall be effective when fully executed and filed with the Department and the Clerk or Secretary of the GOVERNMENTAL BODY. This provision applies only to modification of Exhibit A. I. Plan Review. All traffic signal plans prepared by others for installation on State highways within municipal corporate limits, which are to be added to this agreement, must be reviewed and approved by the DEPARTMENT and the GOVERNMENTAL BODY. m. Cost Sharing. As indicated in Exhibit A, the cost of energy and maintenance of traffic signals, and/or other traffic control devices generally are shared in proportion to the number of approaches maintained by each unit of government, however, other DEPARTMENT policies and practices require cost sharing of energy and maintenance to be based on other criteria besides the number of approaches maintained. The maintenance costs of the interconnect system and related equipment as well as engineering costs for any approved coordination and timing studies shall be shared within the interconnect system, unless otherwise agreed to in a permit or by other agreement. n. Jurisdictionally Transferred. The GOVERNMENTAL BODY will be responsible for the maintenance costs of all traffic signal and/or other traffic control devices related to a roadway or roadways that has or have been jurisdictionally transferred by the DEPARTMENT to the GOVERNMENTAL BODY in a prior agreement(s). o. Billing. Bills shall be submitted by the DEPARTMENT on a three {3) month basis. The amount billed shall be the costs incurred less any proceeds from third party damage claims received during the billing period for repair of signals or devices that are the responsibility of the GOVERNMENTAL BODY. i. Any proposed single expenditure in excess of $10,000 for repair or damage to an installation must be approved by the GOVERNMENTAL BODY before the expenditure is made. ii. The hours, or parts thereof, billed for each maintenance item will be at the actual time directly related to the work task. iii. THE DEPARTMENT costs are composed of labor, equipment, materials and the quantity of each. The cost for labor will be determined by the actual hourly rate for the employee plus a multiplier to include direct and indirect labor related costs, retirement, social security, health, hospitalization and life insurance, holidays, vacation, sick leave and workers compensation. Equipment costs will be as listed in the Schedule of Average Annual Equipment Ownership Expense. Materials will be at cost. 3 ===== PDF PAGE 14 ===== [Extraction: embedded PDF text] iv. The cost for contracted work will be the actual cost for the contractor. In District One, maintenance costs are based on the District's Electrical Maintenance Contract's (EMC) related bid cost and may vary from contract to contract. The length of District One's EMC is generally 2 to 3 years. 3. Notice under this agreement shall be as follows: For the GOVERNMENTAL BODY: ;::or The DEPARTMEN 1: .::f:·!LC...!:l_~!.._\!!-'!n-Baurn, Bureau Chief ofTraffic Operations \Ja rne and Title Name and Title :~~Z.::105-Ll;;c,.14..:.:1:;...._ ____________ _ :>hone nun1ber Phone Number _.i1 .. !~ H.~~1y1w-_BC1..!,J.!IJ.@·""il""'li.wn.:.::o"'is.:.i:.g""o'--=v________ _ ~ mail .l\dclr::•ss Email Address /{i:J._W..:.. _(:fli_\t:J."...~OLI rt ·,cticium\mu? 1L _$.Pl9f .f.\clcfress Address 4. Effective Date. This Agreement shall be effective from July 1, 2021 through June 30, 2031 and may be terminated prior to that date, by either party, upon 30 days written notice. FoR THE GOVERNMENTAL BODY: Signature and Job Title of Authorized Representative Type or Print Name of Authorized Representative Date FDR THE DEPARTMENT: Jose Rios, Regional Engineer, Division of Highways Yangsu A. Kim, Chief Counsel Date (Approved as to form) By: Director, Division of Highways, Chief Engineer Joanne Woodworth, Acting Chief Fiscal Officer Date Date: By: By: Omer Osman, Secretary of Transportation Date By: 4 ===== PDF PAGE 15 ===== [Extraction: embedded PDF text] EXHIBIT A Following is the list of signalized intersections and locations with traffic control devices along State highways located within or near the City of West Chicago in DuPage County that are subject to the provisions of the attached Master Agreement to which this list is an exhibit. As of 9/16/21 % OF MAINTENANCE % OF ENERGY CHARGES AGENCY RESPONSIBILITY RESPONSIBILITY PERFORMING LOCATION TS# STATE LOCAL OTHER STATE LOCAL OTHER MAINT. IL 38 at IL 59 (S Jct) TS2606 100 100 STATE IL 38 at Fabyan Pkwy/Washington TS6175 75 25 75 25 STATE IL 38 at Joliet St TS6180 50 50 50 50 STATE IL 38 at Kress TS6185 100 100 STATE IL 59 at IL64 TS6355 100 100 STATE IL 59 at Dayton Av TS6205 75 25 75 25 STATE IL 59 at Diversey/St Andrews TS22115 100 100 STATE IL 59 at Forest Av TS6390 75 25 100 STATE IL 59 at Hawthorne Av TS8853 50 50 100 STATE IL 59 at lngalton Av TS22110 50 50 100 STATE IL 59 at James Av TS8850 50 50 Winfield Twp. 100 Winfield Twp. STATE IL 59 at Joliet St TS12020 *100 75 25 STATE IL 59 at Main St TS8860 50 50 50 50 STATE IL 59 at Washington/Geneva TS8855 75 25 75 25 STATE IL 64 at Atlantic Dr TS12373 100 100 STATE IL 64 at Prince Crossing TS12375 50 50 100 STATE IL 64 at Teresa Ln/Menards Ent TS12377 100 100 STATE IL 64 at Powis Rd TS12070 75 25 100 STATE *ADT =Average Daily Traffic (>35,000+) ===== PDF PAGE 16 ===== [Extraction: embedded PDF text] EXHIBIT B SHORT FORM TRAFFIC SIGNAL MAINTENANCE PROVISIONS A. GENERAL PROVISIONS 1. CABINET PACK Wiring diagrams, phase diagrams, and manuals that are required to be in each traffic signal controller cabinet at the time of construction completion shall remain in the cabinet. Written documentation of all traffic signal timing changes shall be provided in the cabinet. All entries shall be written in a clear and concise manner. The agent of the maintaining agency making any entries shall provide his/ her signature and date of entry. These shall be kept in the cabinet to assist the DEPARTMENT on emergency call outs. 2. HARDWARE SPECIFICATIONS All equipment and material used shall comply with the requirements of the DEPARTMENT's Standard Specifications for Road and Bridge Construction and the district special provisions. 3. HIGHWAY LIGHTING For maintenance involving combination traffic signal and lighting unit mast arm assemblies and poles, the foundation, traffic signal mast arm assembly, pole lighting arm, luminaire and lighting cable and all signal cable shall be considered part of the traffic signal system and are the responsibility of the DEPARTMENT. The highway lighting system components of each combination mast arm assembly and pole shall be tested for proper operation and physical condition during the intersection cabinet inspection. All costs of repairing or replacing damaged or missing non-standard IDOT highway lighting system equipment is the responsibility of the GOVERNMENTAL BODY. 4. EMERGENCY VEHICLE PREEMPTION SYSTEM Test Emergency Vehicle Preemption System (EVPS) equipment for proper operation and physical condition during the intersection cabinet inspection. All program settings and each sequence of operation must be verified to be correct during each inspection. All cost of inspection and maintaining the EVPS equipment, including the light detectors, light detector amplifiers, radio transmitters and receivers, antennas, confirmation lights, and cables and related components, is the responsibility of the GOVERNMENTAL BODY. In addition to regular inspection and maintenance, all cost of repairing or replacing damaged or missing EVPS equipment is the responsibility of the GOVERNMENTAL BODY. 5. RAILROAD PREEMPTION At all locations with railroad/traffic signal interconnects, respond to any and all emergency and all red flash alarms in a timely manner and notify the Illinois Commerce Commission and the GOVERNMENTAL BODY of the malfunction. None of the traffic signal railroad preempt parameters including but not limited to the phase timings, phase sequences and pedestrian and vehicular clearance intervals can be modified without prior approval from the Illinois Commerce Commission. Maintain unique spare controller data modules or sets of data chips containing the final railroad preemption parameters for each location. Cooperate in any inspection as deemed necessary by the DEPARTMENT or the Illinois Commerce Commission. ===== PDF PAGE 17 ===== [Extraction: embedded PDF text] The DEPARTMENT shall provide contact personnel available at all times to who railroad preemption malfunctions must be reported. 6. DAMAGE REPAIRS Repair or replace any and all standard DEPARTMENT equipment damaged by any cause whatsoever. Equipment owned by a third party, such as EVP, lighted street name signs, TSP, and the like are the responsibility of others. 7. ACCIDENT DAMAGE Be responsible to make recovery for damage to any part of the installation or system from the party causing the damage. Whenever third-party claims cannot be recovered, the GOVERNMENTAL BODY shall share in the loss. 8. TEMPORARY TRAFFIC CONTROL Provide temporary traffic control during a period of equipment failure or for when the controller must be disconnected. This may be accomplished through the installation of a spare controller, placing the intersection on flash, manually operating the controller, manually directing traffic through the use of proper authorities, or installing temporary stop signs which will be removed once the signal is in working condition. 9. EMERGENCY PERSONNEL Provide skilled maintenance personnel who will be available to respond without delay to emergency calls. This may be provided by agency forces, contract, or maintenance agreement. Controller failure, lights out, knockdowns, or two (2) red lights out at intersection are considered emergencies. B. AS REPORTED OR OBSERVED 1. LAMP REPLACEMENT Replace burned out lamps for all red signal indications within twenty-four (24) hours of notification of burnout or on the next business day following the notification. However, if two or more red indications for an approach are burned out, these lamps must be replaced as soon as possible, and under no circumstances longer than twenty-four (24) hours after notification. Replace all other burned out lamps within forty-eight (48) hours or next business day of notification of burnout. Lamp changes shall always include a lens cleaning. 2. SIGNAL ALIGNMENT Keep signal heads properly adjusted, including plumb, and tightly mounted. All controller cabinets, signal posts and controller pedestals should be tight on their foundations and in alignment. 3. CONTROLLER PROBLEMS Check the controllers, relays, and detectors after receiving complaints or calls to ascertain that they are functioning properly and make all necessary repairs and replacement. 4. L.E.D. SIGNAL HEAD AND L.E.D. MODULE REPLACEMENT An L.E.D. module shall be considered failed and shall be replaced if the indication is dark or if the module fails to meet ITE specification on minimum maintained luminous intensity. 2 ===== PDF PAGE 18 ===== [Extraction: embedded PDF text] Replace failed modules for all red signal indications within twenty-four (24) hours of notification of failure or on the next business day following the notification. However, if two or more red indications for an approach are failed, these modules must be replaced as soon as possible, and under no circumstances longer than twenty-four (24) hours after notification. Replace all other failed modules within forty-eight (48) hours or next business day of notification of faillure. C. WEEKLY 1. MASTER CONTROLLER or ADVANCE TRAFFIC MANAGEMENT SYSTEMS At locations that are a part of a closed loop signal or advance traffic management systems maintained by the GOVERNMENTAL BODY, repair any and all malfunctions in a timely manner so that the signals remain under the control of the master at all times. As needed assist in the implementation of the signal system timing plans. Maintain the central signal system software on a PC so that the signal system is monitored weekly. Check weekly by phone or location visit for any malfunction. Verify software accuracy to central office software. D. Bl-MONTHLY (Every 2 months) 1. CABINET INSPECTION Check the controllers, relays, and detectors to ascertain that they are functioning properly and make all necessary repairs and replacement. Keep interior of controller cabinet in a clean and neat condition at all times. Replace filters per manufacturer's recommendations. 2. OBSERVE SIGNALS Observe the signals at the time of the bi-monthly cabinet inspection. This involves stopping and watching for correct detection and timing operation. 3. DETECTION TESTING Test and inspect vehicle detection inductance loops, loop detectors, and pedestrian detection during cabinet visit bi-monthly. 4. VIDEO DETECTION TESTING Inspect, maintain, and clean all video detection and surveillance systems bi-monthly or as needed, to achieve clean lenses, and adjust for proper alignment and proper focus. This shall include system camera, lenses, camera housings and hood/shield, pan tilt, and zoom mechanisms and motors, mounting brackets and hardware, poles, microprocessors, controller, cables and communication equipment, and other related components. Maintenance shall include modifications to programmable detection zones. 5. CONTROLLER CHECK When controllers malfunction, they shall be removed, repaired, and bench checked. The controllers shall not be removed for annual maintenance inspections. This bi-monthly check should verify software with central office software and reprint cabinet pack timings sheet. Controller check shall occur during the bi-monthly cabinet inspection. ===== PDF PAGE 19 ===== [Extraction: embedded PDF text] 6. FUSE AND BREAKER CHECKS Fuse and breaker checks should occur during the bi-monthly cabinet inspection. Replace burned out fuses or deteriorated breakers as needed. 7. CLEARANCE TRIMMING Remove any obstruction blocking the line of sight of the traffic signal face to the motorist including trimming trees, bushes or any other form of vegetation blocking said lines of sight. E. GENERAL 1. ANNUAL HARDWARE INSPECTION Inspect all mast arm assemblies, mast arm poles, brackets (or other types of hardware) supporting traffic heads or pedestrian signal heads on an annual basis. 2. ANNUAL CONFLICT MONITOR AND MMU TEST Test all conflict monitors and MMUs once every two years in accordance with manufacturer recommendations. 3. PAVEMENT MARKINGS In District 1, the GOVERNMENTAL BODY shall inspect stop bars, symbols, special pavement treatments and crosswalks and replace as necessary to insure proper motorist and pedestrian guidance; Whereas, in District 2 through District 9, the cost of pavement markings is shared between the DEPARTMENT and the GOVERNMENTAL BODY according to Exhibit A. 4. The GOVERNMENTAL BODY shall also be responsible for maintenance of the installed street name signs on approaches to a State highway from a local road. Because of the value of street name signs to motorists, the GOVERNMENTAL BODY shall provide such signs at all named State highway intersections. s:\gen\wpdocs\traffic\yg\2011\20l l_1\rcvcrse mastt:r agreement changes accepted exhibit b 3__ 9_2011 (\) (2) final.docx 4