===== PDF PAGE 20 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: Resolution No. 21-R-0102 - Contract Award - J.L. Adler COMMITTEE AGENDA DATE: December 2, 2021Roofing and Sheet Metal, Inc. for the Roof Replacement COUNCIL AGENDA DATE: December 20, 2021 Project (Base Bid + Alternate 1) at 200 Main St STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works SIGNATURE ~ -A=JI\=--<::'.",-~-- APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE_________ _ ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main St. The primary entrance to the ground floor is from Main St while a secondary entrance to the lower level is from Turner Ct. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. In 2015, the City hired Matocha Associates, an architectural firm, alongside Tassone Architects, masonry architectural firm and Structural Resources, Inc. (SRI), a structural engineering firm to evaluate the deteriorating conditions of the building. These evaluations determined multiple issues with the building including, but not limited to, deteriorating masonry fa9ade, structural building settlement, non-compliance with current American Disability Act (ADA) requirements, fire escape related non-compliance, leaking pipes, asbestos, roof damages, etc. All of these concerns were expected due to the age of the building. Since then, the City has removed all the piping in the building as well as all of the asbestos. This project has sat idle for the last couple of years. The City revived this project in recent months by awarding design contracts to the architectural firm, mason architectural firm and structural engineering firm to complete their respective designs for roof replacement, masonry rehabilitation and structural rehabilitation. The scope of work for base bid portion of the Roof Replacement includes, but is not limited to, the removal of existing flat roof and membrane replacement with 60 mil white Thermoplastic Polyolefin (TPO) roofing over a minimum two inches (2") of insulation, a new roof hatch with safety guard rails, drain replacement and down spout replacement. Alternate One includes square for unit pricing for 3/8-inch plywood underlayment over the existing wood decking. It is difficult to determine the exact quantity of underlayment needed without the demolition. The Roof Replacement project was advertised for bids in the Daily Herald as well as on QuestCDN (an online bidding platform) on November 4, 2021. A mandatory onsite pre-bid was conducted on November 11, 2021. Bids were received on November 18, 2021 for the project. Of the eight plan holder only one contractors submitted bids, J.L. Adler Roofing and Sheet Metal, Inc. submitted the lowest responsible bid. A summary of the results is included below. ===== PDF PAGE 21 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO Contractor Base Bid Alternate One Total Bid Rank Amount J.L. Adler Roofing and Sheet $68,970.00 $6, 107.00 $75,077.00 1 Metal, Inc. Joliet, IL Architects' Estimate $160,983.00 N/A The above referenced Roof Replacement Project will be paid for using Downtown TIF District Funds (09- 34-54-4801 ). The project will be constructed in 2022 with a completion date of August 26, 2022. ACTIONS PROPOSED: Approve Resolution No. 21-R-O 102 authorizing the Mayor to award a construction Contract for base bid and alternate one J.L. Adler Roofing and Sheet Metal, Inc. of Joliet, Illinois in an amount of $75,077.00 for the Roof Replacement Project at 200 Main Street COMMITTEE RECOMMENDATION: ===== PDF PAGE 22 ===== [Extraction: embedded PDF text] RESOLUTION NO. 21-R-0102 A RESOLUTION AUTHORIZING THE MAYOR TO AW ARD A CONSTRUCTION CONTRACT FOR BASE BID AND ALTERNATE ONE TO J.L. ADLER ROOFING AND SHEET MET AL, INC. OF JOLIET, ILLINOIS IN AN AMOUNT OF $75,077.00 FOR THE ROOF REPLACEMENT PROJECT AT 200 MAIN STREET. BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to award a construction Contract for base bid and alternate one to J.L. Adler Roofing and Sheet Metal, Inc. of Joliet, Illinois in an amount of $75,077.00 for the Roof Replacement Project at 200 Main Street, in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 20th day of December 2021. AYES: NAYES: ABSTAIN: ABSENT: Mayor Ruben Pineda ATTEST: City Clerk Nancy M. Smith