===== PDF PAGE 45 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: __&- &. Resolution No. 21-R-0103 — Contract Award — Berglund Construction Company for the Structural Rehabilitation Project at 200 Main Street COMMITTEE AGENDA DATE: December 2, 2021 COUNCIL AGENDA DATE: December 20, 2021 STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works sienature_ MUA Se APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main St. The primary entrance to the ground floor is from Main St while a secondary entrance to the lower level is from Turner Ct. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. In 2015, the City hired Matocha Associates, an architectural firm, alongside Tassone Architects, masonry architectural firm and Structural Resources, Inc. (SRI), a structural engineering firm to evaluate the deteriorating conditions of the building. These evaluations determined multiple issues with the building including, but not limited to, deteriorating masonry fagade, structural building settlement, non-compliance with current American Disability Act (ADA) requirements, fire escape related non-compliance, leaking pipes, asbestos, roof damages, etc. All of these concerns were expected due to the age of the building. Since then, the City has removed all the piping in the building as well as all of the asbestos. This project has sat idle for the last couple of years. The City revived this project in recent months by awarding design contracts to the architectural firm, mason architectural firm and structural engineering firm to complete their respective designs for roof replacement, masonry rehabilitation and structural rehabilitation. The scope of work includes extending the existing columns, removal of existing columns, installation of beams, installation of columns, wood framing, etc. The Structural Rehabilitation Project was advertised for bids in the Daily Herald as well as on QuestCDN (an online bidding platform) on November 4, 2021. A mandatory onsite pre-bid was conducted on November 11, 2021. Bids were received on November 18, 2021 for the project. Of the four (4) plan holders only one (1) contractor submitted a bid. Berglund Construction submitted the lowest responsible bid. A summary of the results is included below: Contractor Berglund Construction | $235,000.00 $235,000.00 | 1 Company, Chicago, IL Engineers’ Estimate Fees oer $372,600.00 ===== PDF PAGE 46 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO The above referenced Structural Rehabilitation Project will be paid for using Downtown TIF District Funds (09-34-54-4801). The project will be constructed in 2022 with a completion date of April 15, 2022. ACTIONS PROPOSED: Approve Resolution No. 21-R-0103 authorizing the Mayor to award a construction Contract to Berglund Construction Company of Chicago, Illinois in an amount of $235,000.00 for the Structural Rehabilitation Project at 200 Main Street. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.