===== PDF PAGE 54 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: oo. . Resolution No. 22-R-0008 — Intergovernmental Agreement with the West Chicago Fire Protection District for Installation and Maintenance of Vehicle Preemption Equipment within the City of West Chicago FILE NUMBER: COMMITTEE AGENDA DATE: NA COUNCIL AGENDA DATE: January 17, 2022 STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE MLS J, APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE. ITEM SUMMARY: There are 20 signalized intersections with traffic control devices located within West Chicago, 18 of which are located along the State Highways, while the other two are located along Main Street. All of these traffic control devices are equipped with Emergency Vehicle Preemption (EVP) equipment, which in an emergency situation, yields the right of way for emergency vehicles to pass through the intersections without stopping. The Illinois Department of Transportation (IDOT) is in the design stages of proposing a new traffic signal at IL-59 and Gary’s Mill Rd. During the initial plan review, the West Chicago Fire Protection District (WCFPD) has expressed its desire to install the EVP system at this proposed signalized intersection. This event prompted a discussion on which entity is responsible for the installation and maintenance of the EVPs. For the two traffic control devices along Main St, these EVPs are currently maintained by the City through its annual contractual agreement with Meade Electric on a monthly basis. For the eighteen traffic control devices along State Highways, the EVPs are maintained by the City on as needed basis. There is not a current Intergovernmental Agreement (IGA) between the City and the WCFPD covering all twenty (20) locations. The proposed IGA will accomplish that as well as guidelines for future traffic control devices at other intersections. The City of West Chicago at its December 20, 2021 City Council meeting passed Resolution No. 21-R- 0101, approving an IGA with IDOT for the maintenance of traffic control devices along the State Highways. While discussing that IGA, it was mentioned an IGA with the WCFPD will be forthcoming concerning the installation and maintenance of the EVPs. The term of the proposed IGA with the WCFPD is from Jan 1, 2022 to December 31, 2041. The key terms of the IGA are as follows: - It will include all 20 signalized intersections - Any costs associated with required upgrades/replacements for the EVPs at these 20 locations will be split evenly between the City and the WCFPD - The proposed signal at IL-59 and Gary’s Mill Rd will become part of this IGA after successful installation along with any future traffic signals. The City will assume maintenance responsibilities of such. - The WCFPD is currently and will continue to be financially responsible for reimbursing the City for the vehicle preemption equipment at Main Street/Wilson Avenue and Main Street/ Washington Street. ===== PDF PAGE 55 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO - Following IDOT installation of the new traffic signal at IL 59 and Gary’s Mill Road, the WCFPD shall be solely responsible for the cost of acquisition of the vehicle preemption equipment and its initial installation. - Inthe future, should any traffic intersection not listed herein be deemed to require vehicle preemption equipment, the WCFPD shall be solely responsible for the cost of acquisition of the vehicle preemption equipment and its initial installation The general terms of this IGA match past practice for the last 20+ years, but both parties thought it best to memorialize them for future reference. ACTIONS PROPOSED: Approve Resolution No. 22-R-0008 authorizing the Mayor to execute an Intergovernmental Agreement with the West Chicago Fire Protection District for installation and maintenance of Emergency Vehicle Preemption Equipment within City of West Chicago COMMITTEE RECOMMENDATION: This item was not part of the Infrastructure Committee agenda on January 6, 2022; however, it was discussed during that meeting. The Committee was in favor of presenting the IGA to the City Council at its January 17, 2022, meeting.