===== PDF PAGE 33 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: __8.Q. Resolution No. 22-R-0026 — Contract Execution — Matocha Associates Amendment #1 for Architectural Design Services related to the 200 Main St Rehabilitation Project COMMITTEE AGENDA DATE: May 5, 2022 COUNCIL AGENDA DATE: May 16, 2022 f\ @iGNATHREMEL | Altec SIGNATURE STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main St. The primary entrance to the ground floor is from Main St while a secondary entrance to the lower level is from Turner Ct. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. The City is currently in the process of a structural and masonry rehabilitation. The roof will also be replaced in summer of 2022. On September 20, 2021, the City Council approved Resolution 21-R-0076 for the Mayor to execute a Contract Agreement with Matocha Associates of Hinsdale, Illinois, in an amount not to exceed $38,000, for architectural design services related to the 200 Main St Rehabilitation Project. The purpose of this agreement was for Matocha Associates to prepare preliminary architectural design options for each story, along with preliminary mechanical, electrical, and plumbing drawings for each of those options, as well as opinion of probable cost. The conceptual options also include ADA compliance and multiple configurations for each story for the City to review. Over the last few months, Matocha Associates has worked with staff to complete the conceptual design for each floor. The final report was presented to the Infrastructure Committee on April 7, 2022. The Infrastructure Committee directed staff to obtain an architectural design proposal from Matocha Associates to prepare final construction drawings and bid specifications under an amendment to its current Agreement, which will include constructing the backbone of the mechanical, electrical, and plumbing systems as well as buildout of the lower level and Main St level. The proposal also includes assessment and design of the exterior fire escape. This multi- phase approach was chosen to allow the City the flexibility to select the design option with definitive design scope prior to engaging into final construction drawings. The above referenced architectural design services will be paid for using Capital Funds (08-34-53-4818), in which $814,000 has been budgeted for the ongoing structural and masonry rehabilitation as well as roof replacement. The design will move forward once approved by the City Council and is scheduled to take 5-6 months for completion. ===== PDF PAGE 34 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 22-R-0026 authorizing the Mayor to execute a Contract Amendment #1 with Matocha Associates of Hinsdale, Illinois, in an amount not to exceed $123,100.00, for a revised contract amount of $161,100.00, for architectural design services related to the 200 Main St Rehabilitation Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 4-0 for approval.