===== PDF PAGE 36 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: 7-C. Resolution No. 22-R-0029 — Change Order No. 1 and Final ; — Berglund Construction Company for the Structural Con PECHEADITES lass ie Rehabilitation Project at 200 Main Street : STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works SIGNATURE. Mit 4 APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main Street. The primary entrance to the ground floor is from Main Street while a secondary entrance to the lower level is from Turner Court. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. In 2015, the City hired Matocha Associates, an architectural firm, alongside Tassone Architects, masonry architectural firm, and Structural Resources, Inc. (SRI), a structural engineering firm, to evaluate the deteriorating conditions of the building. These evaluations determined multiple issues with the building including, but not limited to, deteriorating masonry facade, structural building settlement, non-compliance with current American Disability Act (ADA) requirements, fire escape related non-compliance, leaking pipes, asbestos, roof damages, etc. All of these concerns were expected due to the age of the building. Since then, the City has removed all the piping in the building as well as all of the asbestos. This project has sat idle for the last couple of years. The City revived this project in recent months by awarding design contracts to the architectural firm, masonry architectural firm, and structural engineering firm to complete their respective designs for roof replacement, masonry rehabilitation and structural rehabilitation. On December 21, 2021, the City Council approved resolution 21-R-0103 authorizing Mayor to award a construction Contract to Berglund Construction Company of Chicago, Illinois, in an amount of $235,000.00 for the Structural Rehabilitation Project at 200 Main Street. The scope of work included extending the existing columns, removal of existing columns, installation of beams, installation of columns, wood framing, etc. The construction of this project began in February 2022 and is now completed. The final contract value is $239,200.00, which is $4,200.00 above the approved contract value. The nature of the change order is due to additional work that was required during construction, which included temporary electrical hookup to the Main Street level as well as removing an abandoned column that was discovered. The above referenced Masonry Rehabilitation Project will be paid for using Capital Funds (08-34-53- 4818). ===== PDF PAGE 37 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 22-R-0029 authorizing the Mayor to approve Change Order No. 1 and Final with Berglund Construction Company of Chicago, Illinois, in an amount of $4,200.00 for a revised contract value of $239,200.00 for the Structural Rehabilitation Project at 200 Main Street. COMMITTEE RECOMMENDATION: Pending recommendation from the Infrastructure Committee at its meeting on June 2, 2022.