===== PDF PAGE 42 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: ii AGENDA ITEM NUMBER: __/- F. Resolution No. 23-R-0007 — Contract Award — Construction, Inc. for the First and Lower Level Renovation Project at 200 Main St in the Amount $1,190,000.00 STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works SIGNATURE MAA =. APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman COMMITTEE AGENDA DATE: February 2, 2023 COUNCIL AGENDA DATE: February 20, 2023 SIGNATURE ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main St. The primary entrance to the ground floor is from Main St while a secondary entrance to the lower level is from Turner Ct. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. In 2022, the City completed a structural and masonry rehabilitation on the building along with roof replacement. On May 16, 2022, the City Council approved Resolution No, 22-R-0026 to award architectural design contract to Matocha Associates to prepare drawings and bid documents for the renovations of the first floor and lower level. Over the past few months, staff has work with Matocha to complete the design. The First Floor and Lower Level Renovation Project was advertised for bids in the Daily Herald as well as on QuestCDN (an online bidding platform) on December 13, 2022. A mandatory onsite pre-bid was conducted on December 20, 2022, which was only attended by one bidder. The City subsequently issued an addendum to forego the mandatory pre-bid attendance to attract more bidders. Bids were received on January 17, 2023 for the project. Two of the three plan holders submitted bids. A summary of the results is included below. Contractor Construction, Inc. Joliet, IL $1,190,000.00 Bear Construction, Rolling $1,378,985.00 Meadows, IL Architects’ Estimate $1,675,190.66 Staff has performed a reference check on the lowest apparent bidder Construction, Inc. and all responses received were positive. This project will be paid for using Capital Project Funds in which $1,800,000 is budgeted for in account 08-34-53-4818. The project will begin construction in 2023 with a completion date of November 21, 2023. ===== PDF PAGE 43 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 23-R-0007 authorizing the Mayor to award a construction Contract to Construction, Inc. of Lombard, Illinois for the First and Lower Level Renovation Project at 200 Main St in the amount $1,190,000.00. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.