===== PDF PAGE 36 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDAITEMNUMBER: 7-2. Resolution No. 23-R-0023 — Contract Award — Brothers SCATTERERS A DIE ARaaA 05s Asphalt Paving, Inc. for the 2023 Roadway Rehabilitation SUIS WUE tap Project Base Bid in an Amount Not to Exceed $1,650,677.26 SCENE IE Benga Pere: Mareni20, 2025 and Reject the Alternate Bid STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works signaTine Ml ee APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE. SEZ Zale ITEM SUMMARY: The 2023 Roadway Rehabilitation Project (Project) includes resurfacing approximately 2.73 miles of various streets in the City as specified on the enclosed location map under the Base Bid category. The project's scope of work generally consists of pavement milling, hot-mix asphalt (HMA) resurfacing, full-depth HMA pavement patching, intermittent concrete sidewalk, including, ADA curb ramps, intermittent combination concrete curb and gutter removal and replacement, storm and sanitary sewer repairs, including storm and sanitary structure replacement and adjustments, parkway restoration, thermoplastic pavement markings, and all incidental and miscellaneous work necessary to complete the Project as shown on the Project plans and specifications. For the 2023 construction season, staff anticipated a significant cost increase in construction materials such as HMA and portland cement concrete. Furthermore, industry-wide, a 20% cost increase for portland cement concrete items were anticipated due to cement shortages and fuel price increases. Therefore, 0.45 miles of streets were separated from the original Base Bid and included in the contract documents as an Alternate Bid. This method would provide the City Council an option to select the Alternate Bid if the total of Base and Alternate Bid prices were within the allocated FY 2023 budget. Project limits for alternate streets are also denoted in the enclosed location map. The request for bids was advertised in the Daily Herald and on an online bidding platform QuestCDN on January 31, 2023. Staff opened bids on February 21, 2023, and below are the bid results: BASE BID ALTERNATE BID RANK CONTRACTOR SUBMITTAL SUBMITTAL (BASE BID) AMOUNT AMOUNT Brothers Asphalt Paving, Inc. $1,650,677.26 $326,086.84 1 Schroeder Asphalt Services, Inc. $1,654,149.60 $321,716.00 2 A. Lamp Concrete Contractors, Inc. $1,724,184.45 $325,240.15 3 Plote Construction, Inc. $1,751,770.50 $344,734.30 4 J.A. Johnson Paving Co. $1,783,216.00 $349,356.00 5 M & J Asphalt Paving Company, Inc. $1,812,888.55 $353,265.70 6 ENGINEER’S ESTIMATE $1,623, 562.40 $301,616.55 N/A Brothers Asphalt Paving, Inc. (BAP) of Addison, Illinois, submitted a base bid proposal value of $1,650,677.26, which is approximately 1.7% higher than the engineer's estimated cost of $1,623,562.40. The City has previously contracted with BAP to perform similar work, including various rehabilitation and resurfacing projects throughout the City in 2004, 2017, and 2022. All projects were completed satisfactorily. BAP is registered by the Illinois Department of Transportation as a prequalified contractor. ===== PDF PAGE 37 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Out of the $3,071,200 allocated for Street Improvements under Capital Project Funds Account No. 08-34-53-4807, the FY 2023 budget includes $1,626,800 for the Project. BAP’s base bid proposal value of $1,650,677.26 is $23,877.26 over the budgeted amount. This cost increase will be offset by the available fund balance of $550,000 in Account 08-34-53-4848 from the 200 Main Street Renovation Project. Staff recommends awarding the 2023 Roadway Rehabilitation Project to the lowest responsible bidder, Brothers Asphalt Paving, Inc., for the Base Bid amount not to exceed $1,650,677.26. Staff does not recommend selecting BAP’s Alternate Bid due to budgetary constraints. ACTIONS PROPOSED: Approve Resolution No. 23-R-0023 authorizing the Mayor to execute a Contract with the lowest responsible bidder, Brothers Asphalt Paving, Inc. of Addison, Illinois, for a Base Bid contract amount not to exceed $1,650,677.26 and to reject the Alternate Bid for the 2023 Roadway Rehabilitation Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.