===== PDF PAGE 37 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEMNUMBER: — 7-2. Resolution No. 23-R-0069 - Contract Award — Alliance RRS EST Vay ee POI oe Contractors, Inc. for the Klein Road Culvert Replacement SUB TESS Project for an Amount not to Exceed $622,932.62. OSE TSIBUSE S500} OPES (NM th 2% STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE. ITEM SUMMARY: In June 2022, the City received an American Rescue Plan Act Grant through the DuPage County for the Klein Road Culvert Replacement Project in an amount not to exceed $169,000.00. Subsequently, the City Council approved an Intergovernmental Agreement (IGA) with DuPage County on September 6, 2022, for acceptance of grant funds for construction costs. The IGA requires the City to substantially complete the project by October 31, 2024. The Project's scope includes the removal of the existing corrugated metal pipe culvert and two cast-in-place (CIP) junction chambers and replace it with a single-cell, 6’ x 3’ precast concrete box culvert with a CIP end section, solider pile retaining wall and a precast concrete junction chamber, full depth hot-mix asphalt (HMA) pavement removal and reconstruction, HMA resurfacing, widening and placement of 8-foot HMA bike path to accommodate for future Wayne Township's bike path project along Klein Road, HMA and aggregate shoulder construction, storm sewer improvements, temporary detour, thermoplastic pavement markings, fieldstone riprap installation, tree removals, native planting, landscaping, and other collateral work necessary to complete the project as described in the Project plans and specifications. The Project also requires obtaining temporary and permanent easements from the Forest Preserve District of DuPage County (FPDDC) for proposed improvements. The easement agreement between the City and FPDDC was approved by the City Council on July 17, 2023. The request for bids was re-advertised in the Daily Herald and on an online bidding platform, QuestCDN, on July 6, 2023. Staff opened bids on July 20, 2023, and below are the bid results: BID SUBMITTAL CONTRACTOR AMOUNT RANK Alliance Contractors, Inc. $622,932.62 1 Herlihy Mid-Continent Company $659,423.71 2 Martam Construction, Inc. $716,956.20 3 ENGINEER’S ESTIMATE $447,194.00 N/A The FY 2023 budget includes $338,000.00 under the Capital Projects Fund Account No. 08-34-53-4857 for the Construction of the Project. The responsible low bidder, Alliance Contractor of Woodstock, Illinois is $284,932.62 or 84% over the budgeted amount and $175,738.62 or 39% over the Engineer’s Estimate. The Project's Phase |! Design Engineer, Engineering Resource Associates (ERA), believes that increases in fuel cost, industry workload, demand, and labor shortages are the biggest factors for the inflated bids. Additionally, since the rejection of the bids, staff has been in discussion with the DuPage County Stormwater Management team to determine if there was a mechanism in place to request additional grant funds for the Project. After successful conversations, the County has confirmed the City can qualify for up to 50% cost share for the bid amount of the Project. The County plans to prepare an amendment to the IGA, which will be forthcoming and will be presented to the City Council under a separate agenda item at a future meeting, likely in September 2023. ===== PDF PAGE 38 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Per the IGA, the Project construction cost of $622,932.62 will need to be initially funded by the City and then seek reimbursement through the County at the completion of the Project. Alliance Contractors, Inc. does not anticipate performing any work in FY 2023; therefore, the Project will be appropriately re-budgeted in FY 2024. Staff recommends awarding the contract to Alliance Contractors, Inc for the Klein Road Culvert Replacement Project in an amount not to exceed $622,932.62. ACTIONS PROPOSED: Approve Resolution No. 23-R-0069 authorizing the Mayor to execute a Contract with Alliance Contractors, Inc., of Woodstock, Illinois in an amount not to exceed $622,932.62 for the Klein Road Culvert Replacement Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.