===== PDF PAGE 4 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO PUBLIC AFFAIRS COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: BA. Draft Community Park Plan — Former Kerr-McGee Site FILE NUMBER: COMMITTEE AGENDA DATE: August 21, 2023 COUNCIL AGENDA DATE: STAFF REVIEW: Tom Dabareiner, AICP SIGNATURE ZA ra APPROVED BY CITY ADMINISTRATOR: Michael SIGNATURE Guttman At the January 23, 2023 meeting of the Public Affairs Committee, Upland Design Ltd., the consultant contracted by the City for park planning services for the former Kerr-McGee site, presented a Draft Community Plan for the future park site on the property. Following the discussion of the draft Plan, members of the Committee directed Upland to prepare a phasing plan for the development of the park and include the anticipated cost of construction associated with each phase. Members also re- quested additional information for the proposed playground area and sensory garden with respect to ADA amenities. Upland has prepared this information and will present it at the August 21, 2023 meeting of the Public Affairs Committee. ACTIONS PROPOSED: Following the presentation by Upland Design, Ltd. the Committee should discuss and make a rec- ommendation to the City Council for adoption of the Community Park Plan. COMMITTEE RECOMMENDATION: Attachments: Draft Community Park Plan Summary Cost of Construction Phases Community Park Plan Enlargement Playground Enlargement ===== PDF PAGE 5 ===== [Extraction: OCR (rendered-page OCR)] Connection to Existing Parking Lot Pioneer Park Connection at Existing Underpass Proposed Monitoring Building Location Current Monitoring Building Location Existing Monitoring Station ~~ 3 ADA Parking Spaces - 20 Parking Spaces Soccer Fields ~~ 2 Soccer Fields 225’ x 360° - Bleachers LINAWdO13Aa40 MYVd OOVIIHD LSSM “s He: MASTER PLAN ‘Shade Tree with Major Soil Amendments O® ===== PDF PAGE 6 ===== [Extraction: OCR (rendered-page OCR)] uplandDesign Prepared Date: 07/06/2023 #1071 West Chicago Park Development City of West Chicago Phase 0 Phase 1 Phase 2 Phase 3 Phase 4 Summary Cost 2024 2025 2026 - OSLAD 2027 2028 AREA_____| | cost |e [erect] eet ee Asphalt Trals~ North EGIL 9 | i 7 a Asphalt Trails - Center Loop 196,107.00 es o707es00| fe eae 546,612.07 | | Seto || 720,260.40 | an cies! Se biorrarall em | Sled Hill Cc S Ss C $ Asphalt Trails - South $ $ entral Parking Lot outh Parking Lot 2-12 Playground ensory Garden hallenge Course 488,565.56, sd S $119,577.20 [aaa $ 790,641.09 $ 199,080.64 $ 473,516.68 258,939.75 | $ 266,268.23 $ 133,926.56 Go Ee ee Pe ee es SPAM (os | $216,097.90 [ina ta| | PERM | Nicosia sia | $_516)130.10 ree en ee ome | 482,230.25 [fae S| $525,640.78 | Ce eee eee ee 1,419,674.71 [SSOP SSS 20 | ee 655,520.68 [Eeaemeiemwess| a | $714:517.54 [Fe ee 210,465.64 Te) ES eb eee | Pickleball Courts - 4 New Courts $ Tennis Courts - 2 New Courts $ Precast Restroom Building - 2 Unisex Restrooms $ Community Pavilion $ ‘Two Picnic Grove Shelters - North $ [One Picnic Grove Shelter-South TS 105,23279T TS 121,017.02 | Multi-UseFields | dS «43,945.40 | aE | DENTINE || $4 7,900:50) [SR | EEE Basketball Court-1FullSize Cid 110,928.48 120,912.05] $_1,589,262.06 [$_1,635,551.24 $_1,728,129.62[$ 1,774,418.80 es a a ee Pn ned Total Per Phase | $ 1,589,262.06 | $ 4,445,300.10 | $ 4,420,546.61 | $ 4,012,356.08 | $ _1,895,435.82 Yearly Estimated Inflation Rate 12% 15% Page 1 of 1 Upland Design Ltd Chicago 312.350.4088 uplandDesign.com 815.254.0091 Plainfield ===== PDF PAGE 7 ===== [Extraction: OCR (rendered-page OCR)] ‘Shelter at Tennis and Pickleball Courts | ~ ‘ a Sa J - , a TennisiPickleball Courts be Dele i} i % hg 4 be ml Central Parking Lot [2 Tennis Courts b i <: i z , ~ 4 ADA Parking Spaces - 4 Piceball Courts q Pee ose ; 4 <3 - 32 Parking Spaces = Picnic Tables i \- = 5 ao ra ) -Wheelstops - 4 tA Z & 7 ‘ bat - Pedestrian Dropoff Challenge Course _/_- Challenge Course Equipment F -Engin ~__ Existing Monitoring Station ; MASTER PLAN ENLARGEMENT po LNAWdO1SASd0 MYVd OOVOIHD LSAM ifs uh ===== PDF PAGE 8 ===== [Extraction: OCR (rendered-page OCR)] Flower Talk Tubes. Multi-Textured Concrete Paving Play House - Sensory Play Equipment - Permable Pavers PLAYGROUND ENLARGEMENT @ “5-12 Play Zone ~Pouredn Place Satety Su fety Surfacing Swit Sg Swing - 2-5 Swing Bay with ADA Seat ~ 5-12 Swing Bay with ADA Seat - Poured in Place Safety Surfacing Bench Seating with 16" x 16’ Fabric Shade 8' Wide Asphalt Trail ~ Bench Seating Area SCALE: 1" = 40-0" 0 2 «0 ca 120 lS LNAWdOTSASC0 WeVd OOVOIHD LSAM