===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: _ tr Resolution No. 23-R-0078 -— Change Order No. 1 —- COMMITTEE AGENDA DATE: September 7, 2023 Construction, Inc. for the First and Lower Level Renovation ss , Project at 200 Main St. in an Amount not to Exceed COUNCIL AGENDA DATE: September 18, 2023 $150,000.00 for a Revised Contract Value of $1,340,000.00 STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works SIGNATURE MAt dem - APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main Street. The primary entrance to the ground floor is from Main Street while a secondary entrance to the lower level is from Turner Court. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. In 2022, the City completed a structural and masonry rehabilitation on the building along with roof replacement. On May 16, 2022, the City Council approved Resolution No. 22-R-0026 to award an architectural design contract to Matocha Associates to prepare drawings and bid documents for the renovations of the first floor and lower level. On February 20, 2023, the City Council approved Resolution No. 23-R-0007 authorizing the Mayor to award a construction Contract to Construction, Inc. for the First and Lower Level Renovation Project at 200 Main St in the Amount $1,190,000.00. The scope of work for this project includes interior renovations of the First and Lower level along with building the backbone of the electrical, mechanical and plumbing systems for the entire building. The project work began in May 2023. At this time, the project is still under construction. To date, the Project has run into some unforeseen circumstances as well as some necessary changes that required for completing the project. To date, twenty additional scope of work items have been identified. The following table summarizes the additional work and its associated costs. No. Additional Work Item Reasoning for additional work Cost 1 Portland Cement Concrete sidewalk These items were accidently omitted | $21,016.00 and Curb & Gutter along Turner Court —_| from the bidding plans for ADA compliance Electrical Service Connection and Re- For proper hook up to the new 3- $18,353.00 routing (Change order No. 6 — credit for | phase electrical transformer, a change in lighting inside the building conduit needs to be bored under lumped into the price) Turner Court; a transformer pad needs to be installed; Changes from single phase to three phase feed for ===== PDF PAGE 41 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO the building; credit for material change for lighting Three interior doors and hardware The plans specifically didn’t call out for three new doors for various spaces and as such were not included in the base bid. $10,565.00 Cabinetry on Lower and First Level Contractor claimed these items were not clear on the plans; however, this item was denied after showing specific call outs in the plans Fire Rated Glass on Turner Court elevation (refer to Change Order No. 14) The disagreement between contractor and architect was over two of the five windows not be specifically called out as fire rated windows. Change order denied. Material Credit for Lighting fixtures Credit of $1,400 reflected in Change Order No. 2 for changes in the fixtures $0 Material Credit for Square edge tile Changed from tegular tile to square edge $(1,101.00) Demolition of Column Unforeseen circumstance. Hidden column was discovered during demolition $3,188.00 Lower Level Re-configuration After demolition of the existing walls, staff sough a field change to the design by re-configuring lower level proposed floor plan for better functionality $11,809.00 3-Phase AC Condensing Units Necessary change to the AC units after switching power from single _phase to 3-phase $2,289.00 Underground Plumbing Re-routing and addition of an ejector pit Unforeseen circumstance discovered during demolition, not enough gravity pitch to covey lower level bathrooms into existing sanitary $18,506.00 Wood Base Trim Aesthetic change from cove base to wood base trim on First floor. Change Order denied due to cost. First Floor — Think Brick Veneer (incorporated into Change Order No. 16) Unforeseen circumstance. After removal of the stone fagade on Main St., the underlying brick wythe, which is the continuous vertical section of the brick masonry unit, is in poor shape due to deteriorating condition. Cost effective solution to install a think brick veneer over existing bricks. ===== PDF PAGE 42 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Windows at Fire Escape along Turner Court (see Change Order No. 5) The architect came up with a re- design of fire sprinkler system inside the building to eliminate Change Order No. 5 and covert the proposed windows from fire rated to regular windows ($193.00) 15 Existing Steel and stairs conflict The steel plates used to reinforce existing columns during structural rehab previously in conflict with proposed stairs from Lower level to First Level $6,695.00 — 16 Knee Wall Demo at First Floor (included Change Order No. 13) Unforeseen circumstance. The existing foundation wall at the First floor level along Main St is in poor structural shape, needs to be reinforced and constructed properly to support missing layer of existing brick wythe as well as support think brick veneer $35,000.00* 17 Lead base paint abatement Unforeseen circumstance. The existing fire escape paint is lead based paint and requires proper mitigation and disposal. $15,535.00 18 Stair and Railing — 3% floor to roof Plan calls for half wall between third floor to the roof, extending to full height wall. Contractor claimed these items were not clear on the plans; however, this item was denied after showing specific call outs in the plans. $0 19 Cabinet Stain Aesthetic change from laminate finish to a stained finish for cabinets on both levels. Change Order denied due to cost. $0 20 Structural Brick Cavity Infill Unforeseen circumstance. The brick column supports along Main St have voids between wythe of brick. The voids needs to be infilled with concrete. $7,500.00* Total $149,162.00 Fund (08-34-53-4360). “Estimated increase as contractor is still working through pricing. The above referenced Project will be paid for using the Capital Projects Funds (08-34-53-4818) where approximately $110,000.00 remain available. The remainder will be paid using the unused Capital Projects ===== PDF PAGE 43 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 23-R-0078 authorizing the Mayor to approve Change Order No. 1 with Construction, Inc. of Lombard, Illinois, in an amount not to exceed $150,000.00 for a revised contract value of $1,340,000.00, for the First and Lower Level Renovation Project at 200 Main Street. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.