===== PDF PAGE 43 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE, AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: __/-F. Resolution No. 24-R-0005 — Amendment No. 1 — Professional Architectural Services — Matocha Associates for the First Floor and Lower Level Renovation Project at 200 Main Street in an amount not to exceed $31,300.00. COMMITTEE AGENDA DATE: January 4, 2024 COUNCIL AGENDA DATE: January 15, 2024 STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works SIGNATURE. MSA = = APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The City owns the four-story masonry building built in approximately 1880 located at 200 Main St. The primary entrance to the ground floor is from Main St while a secondary entrance to the lower level is from Turner Ct. This building is currently vacant. It was previously used as a mixed use building with commercial on the lower level and ground floor, while the second and third stories of the building were used as residential. In 2022, the City completed the roof replacement, the exterior masonry improvements, and the structural rehabilitation of the building. On February 20, 2023 (Resolution No. 23- R-0007), the City Council awarded a contract to Construction, Inc. for the First Floor and Lower Level Renovation Project at 200 Main Street. On the same day, the City Council also awarded a professional architectural services contract for the construction oversight services for the project (Resolution No. 23-R- 0008) to Matocha Associates based on its knowledge, past experience, and familiarity with this building. In May 2023, the construction begun on the First and Lower Level Renovation Project. To date, much of the construction has been completed. However, additional time and effort are required to facilitate this project as well as to ensure quality and compliance with the contract. Matocha has spent more time than anticipated for material submittal and shop drawing reviews as well as unexpected design changes which arose due to unforeseen field conditions. The original contract completion date was November 21, 2023. There are several weeks of work remaining for the project. The new completion date will March 31, 2024, for all contract items except for the new electrical service which is anticipated to be installed by ComEd by July 2024. Staff recommends approving Amendment No. 1 to Matocha’s original contract for First Floor and Lower Level Renovation Project at 200 Main Street in the amount not to exceed $31,300.00, bringing the total contract value to $91,300.00. Matocha’s amendment will be funded via account 08-34-53-4818. ACTIONS PROPOSED: Approve Resolution No. 24-R-0005 authorizing the Mayor to execute an Amendment No. 1 for the Professional Architectural Services contract with Matocha Associates of Hinsdale, Illinois, for the First Floor and Lower Level Renovation Project at 200 Main Street in an amount not to exceed $31,300.00. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.