===== PDF PAGE 39 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEMNUMBER: _?-G. | Resolution No. 24-R-0015 — Contract Award — Pacific GOMES RAENGRIOR TE. hab a) Construction Services, LLC for the North Public Works ne a eruary Garage Insulation Project in an Amount Not to Exceed POLNCIL AGENDA'DATE: February 19, 2024 $160,380.00 STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE MLA J APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The North Public Works Garage Insulation Project includes the installation of closed-cell spray foam insulation of approximately 6,500 SF of wall surface and 10,000 SF of the roof surface with an intumescent top coating at the interior perimeter of the walls and roof surface areas of an existing prefabricated and uninsulated metal garage building at the 135 W. Grand Lake Boulevard. This garage is primarily used for storage of the major diesel-powered equipment used in the snow and ice removal operations. These pieces of equipment use a product called Diesel Exhaust Fluid (DEF). which is a solution of urea and water that's injected into the exhaust stream of diesel vehicles to turn NOx gases (harmful emissions) into nitrogen and water. The freezing point of DAF is 12 degrees Fahrenheit, at which it can cause expansion of the fluid and damage the tanks and other parts on the equipment. The best way to prevent it from freezing is to store equipment inside in a temperature-controlled environment. The insulation will help with the temperature control inside the building. The Project will also help reduce energy costs, reduce moisture intake, and help protect the structural integrity of the North Garage. The Project is anticipated to begin once snow operations are completed in 2024 and is expected to be completed in July 2024. This Project was advertised for bids in 2023 as an alternate to the roofing project at the same location but was not awarded due to budgetary reasons. The Project was re-advertised for public bids in the Daily Herald and on an online bidding platform, QuestCDN, on January 2, 2024. A non-mandatory pre-bid meeting took place on-site on January 12, 2024. Staff opened bids on January 23, 2024, and below are the results: BID CONTRACTOR SUBMITTAL RANK AMOUNT Pacific Construction Services, LLC $160,380.00 4 KWCC, Inc. $167,494.00 2 BIOFOAM, Inc. $198,750.00 3 Boller Construction Co., Inc. $216,700.00 4 BUDGETED AMOUNT $200,000.00 - Kluber, Inc., the City’s Phase I! and III Architect, completed a scoping review with Pacific Construction Services, LLC (PCS) of Chicago, Illinois, which submitted the lowest bid in the amount of $160,380.00. PCS’s bid is $39,620.00 or approximately 20% under the FY 2024 budgeted amount. Staff recommends awarding the North Public Works Garage Insulation Project to PCS for a total contract amount not to exceed $160,380.00. The FY 2024 Budget includes $200,000.00 under the Capital Projects Funds — Capital Outlay account no. 08-34-53-4801 for the construction phase of the Project. ===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 24-R-0015 authorizing the Mayor to execute a Contract with the lowest responsible bidder, Pacific Construction Services, LLC of Chicago, Illinois, for the North Public Works Garage Insulation Project in an amount not to exceed $160,380.00. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.