===== PDF PAGE 120 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: 4~0. Resolution No. 24-R-0027 - Contract Award - Schroeder COMMITIEE AGENDA DATE: March 7, 2024Asphalt Services, Inc. for the 2024 Roadway Rehabilitation COUNCIL AGENDA DATE: March 18, 2024Project in an Amount Not to Exceed $940,368.23. STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The 2024 Roadway Rehabilitation Project (Project) includes resurfacing approximately 1.55 miles of various streets in the City as specified on the enclosed location map. The scope of work generally consists of pavement milling, hot-mix asphalt (HMA) resurfacing, full-depth HMA pavement patching, intermittent concrete sidewalk, including, ADA curb ramps, intermittent combination concrete curb and gutter removal and replacement, storm and sanitary sewer repairs, including storm and sanitary structure replacement and adjustments, parkway restoration, thermoplastic pavement markings, and all incidental and miscellaneous work necessary to complete the project as shown on the project bid documents. The request for bids was advertised in the Daily Herald on February 16, 2024, and on an online bidding platform QuestCDN on February 15, 2024. Staff opened bids on February 29, 2024, and below are the bid results: AS-CORRECTED RANK CONTRACTOR BID SUBMITTAL (BASE BID) AMOUNT Schroeder Asphalt Services, Inc. $940,368.23 1 Brothers Asphalt Pavinq, Inc. $1 ,008,313.40 2 Plote Construction, Inc. $1 ,012,211.13 3 J.A. Johnson Pavinq, Inc. $1,014,650.00 4 A Lamp Concrete Contractors, Inc. $1 ,014,985.18 5 Geneva Construction Company $1J148,313.63 6 ENGINEER'S EST/MA TE $885, 106. 64 NIA Schroeder Asphalt Service, ' Inc. (SAS) of Huntley, Illinois submitted a bid proposal value of $940,368.23, which is approximately 6.2% higher than the engineer's estimated cost of $885, 106.64. The FY 2024 budget includes $928,900.00 in the Motor Fuel Tax Fund Account No. 16-34-58-4807 for the 2024 Roadway Rehabilitation Project. SAS's bid proposal value of $940,368.23 is $11,468.23 or 1.12% over the budgeted amount. The overage will most likely be offset by the reduction of actual contract quantities during the construction phase. The City has previously contracted with SAS to perform similar work, including various roadway and underground rehabilitation projects throughout the City, including the 2023 Fair Meadows Subdivision Rehabilitation Project. The project was completed satisfactorily. In addition, SAS is registered by the Illinois Department of Transportation as a prequalified contractor. Staff recommends awarding the 2024 Roadway Rehabilitation Project to the lowest responsible bidder, Schroeder Asphalt Services, Inc., for a bid amount not to exceed $940,368.23. ===== PDF PAGE 121 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 24-R-0027 authorizing the Mayor to execute a Contract with the lowest responsible bidder, Schroeder Asphalt Services, Inc. of Huntley, Illinois, for the 2024 Roadway Rehabilitation Project in an amount not to exceed $940,368.23 COMMITTEE RECOMMENDATION: ===== PDF PAGE 122 ===== [Extraction: embedded PDF text] RESOLUTION NO. 24-R-0027 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT WITH SCHROEDER ASPHALT SERVICES, INC. OF HUNTLEY, ILLINOIS, FOR THE 2024 ROADWAY REHABILITATION PROJECT IN AN AMOUNT NOT TO EXCEED $940,368.23 BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a Contract with the lowest responsible bidder, Schroeder Asphalt Services, Inc. of Huntley, Illinois, for the 2024 Roadway Rehabilitation Project in an amount not to exceed $940,368.23, m substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 1 gth day of March 2024. AYES: NAYES: ABSTAIN: ABSENT: Ruben Pineda, Mayor ATTEST: Valeria Perez, Executive Office Manager ===== PDF PAGE 123 ===== [Extraction: OCR (rendered-page OCR)] 048 Dearne ibn 2000 BOURCANY POE FU 113 FOREST PRESERVE MAP PREPARED BY: ADMINISTRATIVE SERVICES WC GIS. MAP PREPARED: MAY, 2003, ‘MAP UNDATED: AUGUST, 2011, AUGUST, 2013, FEBRUARY 2016, MARCI2020 115 CITY OF WEST CHICAGO 2024 ROADWAY REHABILITATION PROJECT MUNICIPAL BOUNDARY +++ RAILROAD INDEX GRID FOR FURTIIER INFORMATION REGARDING TIIIS MAL CLEASE CONTACT TITE CITY OF WEST CHICAGO, ADMINISTRATIVE SERVICES DIVISION 418. MAIN STREET, WEST CHICAGO, IL 60188 PHONE: (630) 293-2200 1 inch = 1,000 feet Roadway Locations No. Street Beginnin, Ending 1 Diversey Pkwy Norris Ave IL-S9 12 Mulberry Or Diversey Pkwy Indianwood Ln \ 3 Eagle Ridge Ct Mulberry Or Cul-de-sac y 4 | Indianwood Ln Arapaho Dr Cul-de-sac 5 Arapaho Or indianwood Ln Chippewa in = g 6 Chippewa Ln Arapaho Dr Cherokee Dr — 7 Cherokee Dr Indianwood Ln Chippewa Ln = A oss 8 | Ancient Oaks Dr 1L-64 Dead End i” 9 | Charlestowne Dr Kings Cir Arbor Ave 10 Yale St W National St W Elmwood Ave 7 11} Elmwood Ave Yale St Fremont St 12 | £ Grand Lake Blvd IL-59 Ridgeland Ave ae pereeceenes een o =e os 7 oth a = {it * a H et ose 083 one a a BATAVIA { oss os ae . ¥ iz ' x > a | Sal RMI , Nh A or Be 103 ‘4 ;CELERATOR [ov 109 120 080 129 wees 2024 Roadway Rehabilitation Project Areas ===== PDF PAGE 124 ===== [Extraction: embedded PDF text] th ~~as. en g I n~_e r in g_ g_r o up s e r v i c e a I I h e h I g h e s I g r a d e 0 7 62 shoreline drive suite 200 aurora. illinois 60504 MEMORANDUM TO: Dave Shah, P .E. - Assistant Director of Public Works, City of West Chicago FROM: Douglas M. Masters - Senior Project Manager, Thomas Engineering Group, LLC DATE: February 29, 2024 RE: Bid Proposal Evaluation - 2024 Roadway Rehabilitation Project (MFT: 24-00000-01-GM) Thomas Engineering Group, LLC (TEO) prepares this memo to recommend a general contracting firm for performing roadway construction for the City's 2024 Roadway Rehabilitation Project (MFT funded, 24-00000-01-GM). The work as shown in the bid documents consists mainly of roadway resurfacing, concrete flat work, sewer pipe and structure repairs. All quantities on the bid's Schedule of Prices were used in determining the lowest responsible bidder. On Thursday, February 29, 2024, staff received and opened six (6) bid proposals from interested firms. A bid tabulation worksheet with engineer's estimate (attached) was developed for evaluation of the bid values submitted at the bid opening. Staffs evaluation of bids included consideration of the bid's unit prices and bidder's past performances with the City and other municipalities and counties. Based on the attached tabulation, Schroeder Asphalt Services, Inc. (Schroder Asphalt), from Huntley, IL, submitted the lowest overall cost proposal. Below is a table depicting the bid results: CONTRACTOR BASE BID OVERALL SUBMITTAL RANK AMOUNT Schroeder Asphalt Services, Inc. $940,368.23 1 Brothers Asphalt Paving, Inc. $1,008,313.40 2 Plote Construction, Inc. $1,012,211.13 3 J.A. Johnson Paving Co. $1,014,650.00 4 A. Lamp Concrete Contractors, Inc. $1,014,985.18 5 Geneva Construction Co. $1,148,313.63 6 ENGINEERS ESTIMATE $885, 106.64 NA thoma s en ' ( . ' ===== PDF PAGE 125 ===== [Extraction: embedded PDF text] February 29, 2024 RE: Bid Proposal Evaluation - 2024 Roadway Rehabilitalion Project Page 2 of2 Schroeder Asphalt submitted a bid proposal value of $940,368.23, approximately 6.2% higher than the engineer's estimated cost of $885,106.64. The second lowest bid proposal, submitted by Brothers Asphalt Paving, Inc., was $1,008,313.40. The City has previously contracted with Schroeder Asphalt to perform similar work. They were most recently awarded the Fair Meadows Subdivision Rehabilitation Project (CDBG, 2023 construction season) and the Commerce Drive Reconstruction Project (MFT, 2021 construction season), which were performed satisfactorily. Schroeder Asphalt is registered by the Illinois Department of Transportation as a prequalified contractor. This information can be found on IDOT's website at: https://idot.illinois.gov/Assets/uploads/files/Doing-Business/Specialty- Lists/Highways/Construction/Pregual-Lists/Preg I ist.txt Therefore, TEG hereby recommends that the project's contract for the 2024 Roadway Rehabilitation,Project be awarded to the lowest responsible bidder, Schroeder Asphalt, for a base- bid contract amount not to exceed $940,368.23. Should you have any questions or need additional information, please feel free to contact me. Enclosures: Engineer's Estimate with Bid Tabulation - 2024 Roadway Rehabilitation Project cc: - 2024 ,Roadway Rehabilitation Project - Project File ===== PDF PAGE 126 ===== [Extraction: embedded PDF text] 416.00 205.93 828.00 624.00 252.00 512.50 288.00 950.00 480.00 372.40 596.20 Co. TOTAL 2,400.00 2,600.00 3,750.00 2,250.00 11,600.00 2,400.00 1,314.00 3,500.00 5,200.00 3,900.00 153,630.00 238,980.00 12,410.00 134,862.50 14,028.00 110,551.68 14,455.00 26,972.50 3,750.00 11,375.00 12,000.00 13,020.00 1,949.00 1,268.25 4,249.41 4,090.00 2,397.02 1,264.17 1,329.48 28,080.00 1,994.22 101,185.00 60,000.00 2,332.00 1,925.00 1,100.00 37,618.02 1,500.00 1,200.00 10,797.00 BID 998 60507 Box IL $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Construction P.O. Aurora, PRICE 80.00 65.00 75.00 45.00 200.00 8.00 4.00 6.00 0.01 250.00 20.00 15.00 135.00 105.00 85.00 12.50 42.00 4.08 5.00 2.50 75.00 65.00 60.00 60.00 97.45 253.65 4,249.41 2,045.00 1,198.51 1,264.17 664.74 936.00 664.74 35.00 60,000.00 1.50 3.00 7.00 1.25 2.00 4.00 7.00 25.00 30.00 44.00 12,539.34 1,500.00 24.00 71.98 18.62 29.81 Geneva UNIT BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Inc. TOTAL 1,500.00 1,800.00 1,250.00 1,250.00 870.00 286.00 4,050.00 2,409.00 205.93 1,750.00 3,770.00 2,730.00 134,284.00 213,944.00 13,140.00 94,403.75 8,350.00 71,804.40 20,959.75 21,578.00 3,700.00 10,325.00 10,800.00 10,633.00 3,240.00 750.00 5,000.00 5,500.00 2,100.00 1,100.00 1,100.00 19,500.00 1,950.00 124,313.00 60,800.00 5.52 2.08 450.00 922.50 3,789.50 468.00 3,437.50 836.00 528.00 3,300.00 18,750.00 1,000.00 1,500.00 150.00 200.00 20.00 Blvd. 60193 BID IL Contractors, $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Wright PRICE 50.00 45.00 25.00 25.00 15.00 5.50 6.75 11.00 0.01 125.00 14.50 10.50 118.00 94.00 90.00 8.75 25.00 2.65 7.25 2.00 74.00 59.00 54.00 49.00 162.00 150.00 550.00 650.00 650.00 43.00 0.01 0.01 12.50 2.25 3.25 6.50 12.50 22.00 33.00 132.00 30.00 1.00 10.00 1.00 Concrete 1900 6,250.00 1,000.00 Schaumburg, 5,000.00 2,750.00 1,050.00 1,100.00 60,800.00 UNIT Lamp A BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 60005 TOTAL 2,100.00 2,000.00 1,750.00 1,250.00 16,124.00 52.00 4,800.00 1,752.00 205.93 4,200.00 3,770.00 650.00 121,766.00 198,012.00 13,870.00 105,192.75 13,360.00 67,740.00 23,128.00 32,367.00 2,000.00 7,000.00 8,000.00 8,680.00 2,582.00 1,415.00 6,157.00 5,752.00 3,132.00 1,277.00 1,694.00 15,150.00 2,319.00 104,076.00 60,879.00 552.00 208.00 252.00 512.50 2,332.00 288.00 1,925.00 950.00 480.00 1,100.00 17,274.00 1,400.00 1,500.00 10,927.50 822.00 746.00 Company Court IL BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Paving Addison Heights, E. Johnson 1025 PRICE 70.00 50.00 35.00 25.00 278.00 1.00 8.00 8.00 0.01 300.00 14.50 2.50 107.00 87.00 95.00 9.75 40.00 2.50 8.00 3.00 40.00 40.00 40.00 40.00 129.10 283.00 6,157.00 2,876.00 1,566.00 1,277.00 847.00 505.00 773.00 36.00 60,879.00 1.00 1.00 7.00 1.25 2.00 4.00 7.00 25.00 30.00 44.00 5,758.00 1,400.00 30.00 72.85 41.10 37.30 Arlington UNIT J.A. BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 60192 TOTAL 3,450.00 400.00 500.00 500.00 9,280.00 520.00 4,800.00 2,190.00 205.93 700.00 6,500.00 1,300.00 127,456.00 200,288.00 13,870.00 113,284.50 15,030.00 74,514.00 23,850.75 32,367.00 1,500.00 5,075.00 5,600.00 5,859.00 4,400.00 2,525.00 6,000.00 7,700.00 2,200.00 1,000.00 1,800.00 17,100.00 2,700.00 109,858.00 39,053.00 1,380.00 1,664.00 252.00 512.50 2,332.00 288.00 1,925.00 950.00 480.00 1,100.00 45,000.00 1,500.00 1,350.00 18,000.00 1,900.00 600.00 Drive IL BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Construction Brandt Estates, Plote 1100 PRICE 115.00 10.00 10.00 10.00 160.00 10.00 8.00 10.00 0.01 50.00 25.00 5.00 112.00 88.00 95.00 10.50 45.00 2.75 8.25 3.00 30.00 29.00 28.00 27.00 220.00 505.00 6,000.00 3,850.00 1,100.00 1,000.00 900.00 570.00 900.00 38.00 39,053.00 2.50 8.00 7.00 1.25 2.00 4.00 7.00 25.00 30.00 44.00 15,000.00 1,500.00 27.00 120.00 95.00 30.00 Hoffman UNIT BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Inc. TOTAL 2,520.00 2,720.00 5,000.00 5,000.00 16,930.20 163.80 2,520.00 1,379.70 2,059.30 7,000.00 2,080.00 5,200.00 132,008.00 221,341.00 13,030.50 141,659.57 14,729.40 65,030.40 15,177.75 28,375.07 2,250.00 7,000.00 8,000.00 8,680.00 2,711.00 1,485.75 6,464.85 6,039.60 3,288.60 1,340.85 1,778.70 15,907.50 2,434.95 106,244.25 18,600.00 2,760.00 1,040.00 264.60 537.10 2,448.60 302.40 2,021.25 997.50 504.00 1,155.00 18,137.70 1,575.00 2,625.00 11,475.00 863.00 783.00 BID Paving, Avenue 60101 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Asphalt Stewart IL $ $ $ $ 2.40 5.25 2.63 4.20 6.30 8.00 2.10 7.35 3.15 5.00 7.35 1.31 4.20 0.10 5.00 S. Addison, PRICE 84.00 68.00 100.00 100.00 291.90 500.00 20.00 116.00 97.25 89.25 13.13 44.10 45.00 40.00 40.00 40.00 135.55 297.15 6,464.85 3,019.80 1,644.30 1,340.85 889.35 530.25 811.65 36.75 26.25 31.50 46.20 6,045.90 1,575.00 52.50 76.50 43.15 39.15 315 18,600.00 UNIT Brothers BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Inc. TOTAL 2,700.00 40.00 50.00 50.00 10,730.00 260.00 2,400.00 1,314.00 205.93 2,520.00 1,040.00 2,600.00 122,904.00 200,288.00 11,972.00 129,468.00 13,861.00 46,063.20 15,900.50 12,407.35 2,900.00 9,975.00 10,600.00 11,284.00 4,760.00 2,725.00 6,050.00 5,900.00 3,870.00 1,790.00 2,200.00 18,450.00 3,300.00 109,858.00 15,000.00 552.00 416.00 270.00 553.50 2,506.90 309.60 2,062.50 1,045.00 528.00 1,200.00 48,150.00 550.00 1,000.00 19,050.00 2,000.00 650.00 BID Services, 831 60142 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ IL Asphalt Box 1.70 5.50 1.15 1.00 1.00 1.00 4.00 6.00 0.01 4.00 1.00 2.15 7.50 5.00 2.00 7.50 1.35 4.30 P.O. 41.50 52.00 38.00 88.00 12.00 90.00 10.00 82.00 58.00 57.00 53.00 27.50 33.00 48.00 20.00 PRICE 108.00 180.00 238.00 550.00 127.00 185.00 615.00 545.00 100.00 Huntley, 6,050.00 2,950.00 1,935.00 1,790.00 1,100.00 1,100.00 15,000.00 16,050.00 32.50 UNIT Schroeder BID $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTAL BID $21.80 $169.52 $3,912.00 $1,903.11 $1,235.58 $4,263.00 $1,320.80 $3,900.00 $9,967.42 $802.00 $1,629.00 $543.00 $2,451.30 $1,969.20 $2,461.50 $1,751.00 $14,500.00 $2,410.50 $8,436.75 $9,440.00 $10,242.40 $1,169.20 $814.55 $7,551.60 $6,439.16 $2,094.96 $920.61 $1,000.00 $17,615.40 $2,746.59 $90,835.22 $17,255.00 $1,104.00 $208.00 $184.32 $561.70 $2,530.22 $300.24 $1,878.25 $152.00 $128.00 $375.00 $20,014.80 $1,370.25 $127,638.08 $206,751.84 $119,973.68 $12,611.84 $51,482.40 $12,402.39 $23,412.13 EST. ESTIMATE ENG. PRICE $3.26 $6.52 $8.69 $0.06 $16.04 $10.86 $27.15 $1.09 $31.42 $2.00 $1.00 $5.12 $1.37 $2.17 $4.17 $6.83 $4.00 $8.00 $15.00 UNIT $81.71 $49.23 $49.23 $35.02 $250.00 $5.08 $15.00 $112.16 $90.84 $68.27 $11.12 $37.76 $304.50 $1.90 $4.29 $2.17 $48.21 $48.21 $47.20 $47.20 $58.46 $162.91 $7,551.60 $3,219.58 $1,047.48 $920.61 $500.00 $587.18 $915.53 $6,671.60 $1,370.25 $17,255.00 EST. 1 5 1 2 2 1 2 30 3 72 275 38 16 25 3 1 50 150 20 20 30 40 50 50 58 52 600 219 334 50 175 200 217 20 552 208 36 410 1,166 2,891 14 260 260 1,138 2,276 146 10,789 27,096 2,891 10,789 20,593 ESTIMATED QUANTITY FT FT YD YD YD YD TON TON TON SQ SQ SQ SQ SQ UNIT EACH YDCU YDCU YDCU EACH YDSQ YDSQ YDSQ POUND SQ FOOT FTSQ YDSQ YDSQ YDSQ YDSQ FOOT EACH EACH EACH EACH EACH EACH EACH EACH FOOT SUML FOOT FTSQ FTSQ FOOT FOOT FOOT FOOT FOOT FOOT FOOT EACH SUML FTSQ YDCU FOOT FOOT N50 (1.5") INCH FRAME AND AND 6 11 N50 B-6.12 SYMBOLS IL-4.75, INCH, FRAME FRAME 6 "D", LESS) AND TYPE TYPE 11) 11 24 A, 4" 6" 12" 24" (TO MIX LINE LINE LINE (OR PAVEMENT, 5 - - - 1) ADJUSTED MATERIAL JOINT & 4" 6" 24" LESS) COURSE, TYPE TYPE 12" BUTT (TYPE LETTERS LINE LINE LINE LINE 2" TYPE 2 BE - - - - - OR A.M. GUTTER, (REMOVAL GRATE DIAMETER) FLANGEWAYS 2" 4" 6" (TYPE TO NEW NEW (8" REMOVAL B B B - IL-9.5, REMOVAL 12" BINDER DESCRIPTION DRIVEWAY SIDEWALK TYPE AND AND MARKING MARKING MARKING PAVER COAT) AND PROJECT 11:00 A, INCH TO INCH INCH INCH 6 BOXES WITH WITH ADJUSTED MARKING MARKING MARKING MARKING MARKING 6 6 (MFT) @ ITEM UNSUITABLE TYPE TYPE TYPE REMOVAL COURSE, REMOVAL, 6 CURB (UP REPAIRS BE OF GUTTER III, I, II, IV, BRICK MARKING MARKING ADJUSTED FRAME 2024 BID 4'-DIAMETER, REPLACEMENT) (TACK JOINTS, ASPHALT (SPECIAL) CLASS TO 11 ADJUSTED BE PAVEMENT PAVEMENT PAVEMENT A, 29, EMBANKMENT AND CONCRETE CONCRETE SPOT TYPE TYPE TYPE TYPE BASE COURSE, COURSE, COURSE, SERVICE (SPECIAL) BE TO SURFACE SURFACE SURFACE AND ADJUSTED ADJUSTED PAVEMENT PAVEMENT PAVEMENT PAVEMENT PAVEMENT (RCP) TYPE TYPE REMOVAL TO REHABILITATION BE DISPOSAL HOT-MIX TRENCH CRACKS, REINSTALL CONCRETE PAVEMENT PAVEMENT WARNINGS LIDS GRATES RAMP CHICAGO BASE BASE BASE MATERIALS 24-00000-01-GM February PRUNING SEWER TO TO CEMENT CEMENT WATER CURB REMOVAL BASIN AND URETHANE URETHANE URETHANE GRANULAR PATCHES, PATCHES, PATCHES, PATCHES, AND BACKFILL ASPHALT AND AND FOR ASPHALT ASPHALT NO.: (REMOVAL BE TERM TERM BASINS, (SPECIAL) WEST EXCAVATION D D D SEWERS D VAULTSTABULATION FILTERS ROOT ROADWAY OF GRATE SEWER Opening:BID 2024 CITY SECTION Bid TREE EARTH REMOVAL POROUS INLET AGGREGATE AGGREGATE AGGREGATE BITUMINOUS MIXTURE HOT-MIX TEMPORARY POLYMERIZED HOT-MIX PORTLAND PORTLAND SPECIAL) DETECTABLE HOT-MIX COMBINATION SIDEWALK CLASS CLASS CLASS CLASS STORM DOMESTIC CATCH REPLACEMENT) INLETS, AND MANHOLES GRATE MANHOLES GRATE VALVE FRAMES FRAMES COMBINATION MOBILIZATION SHORT SHORT THERMOPLASTIC THERMOPLASTIC THERMOPLASTIC THERMOPLASTIC THERMOPLASTIC MODIFIED MODIFIED MODIFIED (SANITARY) WASHOUT REMOVE TRENCH EXPLORATION STORM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 ITEM NO. ===== PDF PAGE 127 ===== [Extraction: embedded PDF text] 750.00 Co. TOTAL 23,077.50 2,899.40 6,750.00 8,000.00 2,093.75 26,700.70 16,005.00 4,365.00 2,920.00 1,148,313.63 1,140,313.63 BID 998 60507 Box IL $ $ $ $ $ $ $ $ $ $ $ $ Construction P.O. Aurora, PRICE 923.10 1,449.70 45.00 8,000.00 31.25 12.35 55.00 15.00 20.00 250.00 Geneva UNIT BID $ $ $ $ $ $ $ $ $ $ Inc. TOTAL 8,750.00 2,900.00 5,400.00 63,400.00 4,020.00 17,296.00 10,621.50 3,710.25 2,007.50 375.00 Blvd. 60193 BID 1,014,985.18 1,014,985.18 IL Contractors, $ $ $ $ $ $ $ $ $ $ $ $ Wright PRICE 350.00 36.00 60.00 8.00 36.50 12.75 13.75 125.00 Concrete 1900 Schaumburg, 1,450.00 63,400.00 UNIT Lamp A BID $ $ $ $ $ $ $ $ $ $ 60005 TOTAL 12,103.75 5,736.00 5,100.00 55,705.82 2,093.75 27,025.00 11,640.00 6,984.00 2,190.00 600.00 Company Court IL BID 1,014,650.00 1,014,650.00 $ $ $ $ $ $ $ $ $ $ $ $ Paving Addison Heights, E. Johnson 1025 PRICE 484.15 2,868.00 34.00 55,705.82 31.25 12.50 40.00 24.00 15.00 200.00 Arlington UNIT J.A. BID $ $ $ $ $ $ $ $ $ $ 60192 TOTAL 15,000.00 3,800.00 5,250.00 8,000.00 2,093.75 28,862.70 13,095.00 5,820.00 4,380.00 3,300.00 Drive IL BID 1,012,211.13 1,012,211.13 $ $ $ $ $ $ $ $ $ $ $ $ Construction Brandt Estates, Plote 1100 PRICE 600.00 1,900.00 35.00 8,000.00 31.25 13.35 45.00 20.00 30.00 1,100.00 Hoffman UNIT BID $ $ $ $ $ $ $ $ $ $ Inc. TOTAL 12,708.75 6,022.80 7,087.50 9,419.00 2,197.60 28,387.06 10,185.00 4,365.00 3,066.00 1,234.80 1,008,313.40 1,008,313.40 BID Paving, Avenue 60101 $ $ $ $ $ $ $ $ $ $ $ $ Asphalt Stewart IL S. Addison, PRICE 508.35 3,011.40 47.25 9,419.00 32.80 13.13 35.00 15.00 21.00 411.60 315 UNIT Brothers BID $ $ $ $ $ $ $ $ $ $ Inc. TOTAL 15,750.00 4,050.00 5,775.00 5,000.00 2,294.75 22,701.00 8,148.00 3,783.00 3,212.00 3,375.00 940,368.23 940,368.23 BID Services, 831 60142 Asphalt Box IL $ $ $ $ $ $ $ $ $ $ $ $ P.O. Huntley, PRICE 630.00 2,025.00 38.50 5,000.00 34.25 10.50 28.00 13.00 22.00 1,125.00 UNIT Schroeder BID $ $ $ $ $ $ $ $ $ $ TOTAL BID $1,345.00 $3,467.24 $4,422.00 $17,721.90 $1,675.00 $27,025.00 $7,900.65 $3,986.70 $1,416.20 $1,295.64 $885,106.64 EST. ESTIMATE ENG. PRICE Est.) (Eng. $29.48 UNIT $53.80 $25.00 $12.50 $27.15 $13.70 $9.70 $431.88 $1,733.62 $17,721.90 EST. 3 Read 1 67 25 2 150 2,162 291 291 146 Corrected As ESTIMATED QUANTITY As TOTAL UNIT FOOT EACH FOOT SUML FOOT YDSQ YDSQ YDSQ YDSQ EACH BID 1 LESS) (OR TYPE 8” NEW 3" REMOVAL WITH A.M. (SPECIAL) (SPECIAL) DESCRIPTION REPLACEMENT (SPECIAL) PROJECT 11:00 PAVEMENT, PAVEMENT (MFT) @ ITEM AND ADJUSTED BE (SPECIAL) RINGS 2024 BID B PROTECTION, REMOVAL TO 29, BASE REMOVAL TYPE AND DRIVEWAY DRIVEWAY LID REPLACEMENT REHABILITATION ADJUSTING CHICAGO 24-00000-01-GM February CURB, LOOP (DRIVEWAY) SEWER MANHOLES RESTORATION LID CONTROL ASPHALT ASPHALT WEST NO.: CLOSEDTABULATION ROADWAY OF Opening:BID 2024 CITY SECTION Bid SANITARY SANITARY FRAME, CONCRETE TRAFFIC DETECTOR PARKWAY HOT-MIX HOT-MIX CONCRETE MANHOLE 52 53 54 55 56 57 58 59 60 61 ITEM NO.