===== PDF PAGE 45 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY AGENDA ITEM NUMBER: 7. ITEM TITLE: Resolution No. 24-R-0024 - Contract Award — RJN Group, Inc. for Professional Design Engineering Services Related to the 2024 SSES Repair Program in the Not to Exceed Amount of $25,000.00 COMMITTEE AGENDA DATE: March 7, 2024 COUNCIL AGENDA DATE: March 18, 2024 STAFF REVIEW: Mehul T. Patel, P.E.,CFM -Director of Public Works SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael Guttman SIGNATURE. ITEM SUMMARY: In June 2022, the Infrastructure Committee directed staff to continue addressing defects identified as part of the Sanitary Sewer Evaluation Survey (SSES) via cured in place pipe, manhole lining, and five feet of lateral lining within the public rights-of-way and easements. The 2024 Sanitary Sewer Rehabilitation Project (Project) will continue the rehabilitation of the City’s sanitary collection system using trenchless technologies to address structural defects and infiltration issues in the Roosevelt Highlands Subdivision, which is generally the area between Illinois Route 59 and Gates Street, and between Dayton Avenue and Forest Avenue. The Project location was previously identified as a location of high inflow and infiltration. Most of the sanitary sewers in the Roosevelt Highlands Subdivision are located in backyard public easements. A large portion of the sanitary sewer segments in this area are obstructed by severe root intrusion, offset pipe joints, and faulty service lateral connections to the mainline sanitary sewer. The 2023 Sanitary Sewer Rehabilitation Project also took place in the same neighborhood, but the scope had to be reduced due to budgetary reasons. In 2023, approximately 4,500 lineal feet of 8” sanitary sewer and services within those segments received the cured in place pipe lining. Due to its knowledge of SSES, familiarity and past performance, staff requested a proposal from RJN Group (RJN) for the design engineering services related to the Project. RUN’s scope of work will include preparing plans, specifications and bid documents to repair approximately 2,050 feet of sewer and associated manhole rehabilitations in this area. All the work will be focused within the public right-of-way and/or easements. After successful negotiations, RJN has provided a proposal for an amount not to exceed $25,000.00 for design engineering services. Staff feels the design costs are appropriate for a project of this scale. Staff recommend moving forward with the design of the Project. In FY2024 Sewer Fund, Sewer Main Repairs (05-34-43-4410), $550,000.00 has been budgeted which will be used for the 2024 SSES Repair Program. ACTIONS PROPOSED: Approve Resolution No. 24-R-0024 authorizing the Mayor to execute a professional services agreement with RJN Group, Inc. for design engineering services related to the 2024 SSES Repair Program in an amount Not to Exceed $25,000.00. ===== PDF PAGE 46 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.