===== PDF PAGE 49 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: TM. Resolution No. 24-R-0027 — Contract Award — Schroeder een ne eee eee oN Asphalt Services, Inc. for the 2024 Roadway Rehabilitation menace Project in an Amount Not to Exceed $940,368.23. COUIC® AGENDA BATE: Maren 18,'202% STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE. APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE. ITEM SUMMARY: The 2024 Roadway Rehabilitation Project (Project) includes resurfacing approximately 1.55 miles of various streets in the City as specified on the enclosed location map. The scope of work generally consists of pavement milling, hot- mix asphalt (HMA) resurfacing, full-depth HMA pavement patching, intermittent concrete sidewalk, including, ADA curb ramps, intermittent combination concrete curb and gutter removal and replacement, storm and sanitary sewer repairs, including storm and sanitary structure replacement and adjustments, parkway restoration, thermoplastic pavement markings, and all incidental and miscellaneous work necessary to complete the project as shown on the project bid documents. The request for bids was advertised in the Daily Herald on February 16, 2024, and on an online bidding platform QuestCDN on February 15, 2024. Staff opened bids on February 29, 2024, and below are the bid results: AS-CORRECTED RANK CONTRACTOR BID SUBMITTAL (BASE BID) AMOUNT Schroeder Asphalt Services, Inc. $940,368.23 4 Brothers Asphalt Paving, Inc. $1,008,313.40 2 Plote Construction, Inc. $1,012,211.13 3 J.A. Johnson Paving, Inc. $1,014,650.00 4 A Lamp Concrete Contractors, Inc. $1,014,985.18 5 Geneva Construction Company $1,148,313.63 6 ENGINEER’S ESTIMATE $885, 106.64 N/A Schroeder Asphalt Service, Inc. (SAS) of Huntley, Illinois submitted a bid proposal value of $940,368.23, which is approximately 6.2% higher than the engineer’s estimated cost of $885,106.64. The FY 2024 budget includes $928,900.00 in the Motor Fuel Tax Fund Account No. 16-34-58-4807 for the 2024 Roadway Rehabilitation Project. SAS’s bid proposal value of $940,368.23 is $11,468.23 or 1.12% over the budgeted amount. The overage will most likely be offset by the reduction of actual contract quantities during the construction phase. The City has previously contracted with SAS to perform similar work, including various roadway and underground rehabilitation projects throughout the City, including the 2023 Fair Meadows Subdivision Rehabilitation Project. The project was completed satisfactorily. In addition, SAS is registered by the Illinois Department of Transportation as a prequalified contractor. Staff recommends awarding the 2024 Roadway Rehabilitation Project to the lowest responsible bidder, Schroeder Asphalt Services, Inc., for a bid amount not to exceed $940,368.23. ===== PDF PAGE 50 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 24-R-0027 authorizing the Mayor to execute a Contract with the lowest responsible bidder, Schroeder Asphalt Services, Inc. of Huntley, Illinois, for the 2024 Roadway Rehabilitation Project in an amount not to exceed $940,368.23 COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.