===== PDF PAGE 44 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: 7.2. Resolution No. 24-R-0033 — Contract Award — Plote Construction, Inc. for the 2024 Harvester Road Reconstruction Project in an Amount Not to Exceed $3,819,800.57 COMMITTEE AGENDA DATE: April 4, 2024 COUNCIL AGENDA DATE: April 15, 2024 STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE. SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman ITEM SUMMARY: The Harvester Road Reconstruction Project between Powis Road and Hawthorne Lane, as denoted in the enclosed location map, includes full-depth reconstruction and widening of road pavement with 10” jointed Portland Cement Concrete (PCC) pavement, street light removal and replacement, new sidewalk construction, installation of ADA- compliant detectable warnings and curb ramps, driveway removal and replacement with curb & gutter, relocation of fire hydrants, miscellaneous storm sewer structure adjustments, reconstruction and replacement of spot sanitary sewer structures and pipes, and other miscellaneous work as denoted in the Project plans and specifications. The net length of roadway improvements is approximately 0.76 miles or 4,002 feet. The construction is anticipated to begin in spring 2024 and is expected to be completed in October 2024, weather dependent. The Project was re-advertised for public bids in the Daily Herald and on an online bidding platform, QuestCDN, on February 29, 2024. Staff opened bids on March 21, 2024, and below are the bid results: AS CORRECTED BID CONTRACTOR SUBMITTAL AMOUNT Plote Construction Inc. $3,819,800.57 R.W. Dunteman Co. $3,829,000.00 Acura, Inc. $4,029,463.15 Alliance Contractors, Inc. $4,414,821.53 A Lamp Concrete Contractors, Inc N/A* ENGINEER’S ESTIMATE $4,599,960.55 * Bid submittal amount not read publicly as the bid submittal requirements were not met. The City Council approved Resolution No. 24-R-0004 on January 15, 2024, appropriating the use of Motor Fuel Tax (MFT) and Rebuild Illinois (RBI) grant funds for the Project. The City received $1,785,073.98 in RBI grant funds from the State, which shall be obligated by July 1, 2025. The FY 2024 Budget includes a total of $3,777,800.00 for the Project from various funds as summarized in the table below: FY 2024 ee) Budget Amount Motor Fuel Tax MFT Rebuild Illinois Grant Capital Projects Fund Water Fund Sewer Fund Item Account No. Commodities & Projects 16-34-58-4807 16-34-58-4807 08-34-53-4807 06-34-47-4806 05-34-43-4806 Total: $570,000.00 $1,780,000.00 $1,327,800.00 $50,000.00 $50,000.00 $3,777,800.00 Capital Outlay — Street Improvements Capital Outlay —- Other Capital Outlay Capital Outlay — Other Capital Outlay ===== PDF PAGE 45 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Plote Construction, Inc. of Hoffman Estates, Illinois submitted a bid proposal value of $3,819,800.57, which is $780,159.98 or approximately 17% lower than the engineer's estimated cost of $4,599,960.55; however, it is $42,000.57 over the FY 2024 budgeted amount of $3,777,800.00. Staff recommends funding the $42,000.57 overage from the Capital Projects Fund — Capital Outlay — Street Improvement Account No. 08-34-53-4807. Under the same account, $438,900.00 is budgeted in FY 2024 for the York Avenue Area Water Main and Rehabilitation Project, which is partially grant-funded by the Community Development Block Grant (CDBG) Program through DuPage County. Staff recently learned that due to limited funding, the County has deprioritized and included this Project in its B-List category. Therefore, staff does not foresee the York Avenue Area Water Main and Rehabilitation Project under construction in FY 2024. The City has previously contracted with Plote Construction, Inc., including on the 2023 Technology Boulevard Resurfacing Project, which was completed satisfactorily. Plote is registered with the Illinois Department of Transportation as a prequalified contractor. Staff recommends awarding the 2024 Harvester Road Reconstruction Project to Plote Construction, Inc. for a total contract amount not to exceed $3,819,800.57. ACTIONS PROPOSED: Approve Resolution No. 24-R-0033 authorizing the Mayor to execute a Contract with the lowest responsible bidder, Plote Construction, Inc. of Hoffman Estates, Illinois, for the 2024 Harvester Road Reconstruction Project in an amount not to exceed $3,819,800.57. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 5-0 for approval.