===== PDF PAGE 39 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEMNUMBER: — eK. Resolution No. 24-R-0055 -— Amendment No. 2 —- Professional Engineering Design Service to Gewalt Hamilton Associates, Inc. for IL-38 and Technology Boulevard Traffic Signal Project in an Amount Not to Exceed $24,900.00 for a Revised Contract Amount of COMMITTEE AGENDA DATE: August 1, 2024 COUNCIL AGENDA DATE: August 5, 2024 $104,150.00 STAFF REVIEW: Mehul T. Patel, P.E., CFM — Director of Public Works SIGNATURE. APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE, ITEM SUMMARY: The DuPage Business Park, located on the southwest side of the City of West Chicago, has seen major developments over the past few years, which has resulted in an increased traffic volume. To protect the safety of motorists, the City desires to install a traffic signal at the intersection of IL-38 (Roosevelt Road) and Technology Boulevard. The Illinois Department of Transportation (IDOT) has jurisdiction over IL-38, while the City has jurisdiction over Technology Boulevard. In 2020, State Senator Karina Villa, as part of the Public Act 102-0017, included improvements associated with this traffic signal to be appropriated from the Build Illinois Bond Fund via the Illinois Department of Commerce and Economic Opportunity (DCEO). The cost associated with these improvements is listed at $600,000.00. The grant agreement was fully executed by DCEO on September 27, 2023. On February 21, 2022, the City Council approved Resolution No. 22-R-0010 authorizing the Mayor to execute the initial contract with Gewalt Hamilton Associated, Inc. (GHA) for engineering services related to Phase II — Design, which included the preparation of an intersection design study, topographic survey, traffic signal installation plan, traffic signal interconnect plans, minor geometric improvements, and bidding assistance in the amount of $51,950.00. On August 7, 2023, the City Council approved Resolution No. 23-R-0070 authorizing the Mayor to execute Amendment No. 1 with GHA for the engineering design services for an amount not to exceed $27,300.00, for a revised contract amount of $79,250.00, to begin the detailed design of the project, including the intersection lighting, and prepare bid documents. Staff and GHA are having ongoing project coordination with IDOT for the involvement of the State Route and for the use of Motor Fuel Tax (MFT) funds for the construction and construction engineering of the project. Additional Phase II —- Design coordination, which was not initially anticipated during GHA’s Phase ll- Design scope, is now requested by IDOT for the project to acquire final IDOT approvals before the City can advertise the project for bids. The additional scope for GHA includes Environmental Survey Request, IDOT — District 1 Bureau of Local Roads and Streets (BLRS) coordination, utility coordination, plan revisions, location drainage technical memorandum, and Intersection Design Study (IDS) revisions as required by IDOT BLRS. ===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Staff recommends approving Amendment No. 2 to GHA’s contract for the IL-38 and Technology Boulevard Traffic Signal Project in an amount not to exceed $24,900.00, for a revised contract amount of $104,150. GHA’s Amendment No. 2 will be funded through Capital Projects Fund Account No. 08-34-53- 4225 in the FY 2024 Budget. ACTIONS PROPOSED: Approve Resolution No. 24-R-0055 authorizing the Mayor to execute Amendment No. 2 for the Professional Engineering Design Services contract with Gewalt Hamilton Associates, Inc. for the IL-38 and Technology Boulevard Traffic Signal Project for an amount not to exceed $24,900.00 for a revised contract amount of $104,150.00. COMMITTEE RECOMMENDATION: Pending recommendation from the Infrastructure Committee at its meeting on August 1, 2024.