===== PDF PAGE 20 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Parking Lot/Sidewalk/Stoop Repair AGENDA ITEM NUMBER: 3 D. 110-112 Galena Street Jose Antonio Arias COMMISSION AGENDA DATE: 09-24-24 C.O.A. # 24-17 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: Jose Antonio Arias, owner of 110-112 Galena Street in the Turner Junction Historic District, is re- questing approval of a Certificate of Appropriateness to repair the existing parking lot, sidewalk, and two stoops serving the multi-tenant commercial structure. The existing concrete and asphalt will be removed from the site and will be replaced with concrete. No changes in the size of location of the parking lot, sidewalk, or stoops are proposed. No other changes to the property nor to the building are proposed. Although it is not a condition that needs to be approved by the Commission, staff will place a condition on the building permit requiring the parking lot to be restriped Please see photos and scope of work for more details. The subject building is a Greek Revival constructed in the 1870s. According to the Historical District Property Survey, the building is non-contributing to the district and is not a candidate for local land- mark status. ACTION PROPOSED: Consideration of parking lot/sidewalk/stoop repair at 110-112 Galena Street. ===== PDF PAGE 21 ===== [Extraction: OCR (rendered-page OCR)] PROPOSAL 110,112 Galena St West Chicago Improvement Proposal 110,112 Galena St West Chicago remove existing concrete »stone ,dirt and disposal of to. An authorized dumpsite, demo and frame 31X5 Ft side walk ,28X10 front sidewalk ,6X5 Ft sidewalk, 6X5 Ft sidewalk,6X5 stoop. Remove. 4 inches of dirt and add 4 inches of stone grade and compacted ,drill and installed rebar to all needs areas(foundation and side walks )for more reinforcement, also add wire mesh for extra reinforce ;installed 5 of 6 bag 4000 psi concrete and finish to match existing concrete w/broom finish. Next day strip boards and clean up areas of work backfield w/dirt in necessary areas. Tonys Construction 0N660 Essex Lane Aes. Projet ost 2, 309 Winfield, IL 60190 Cell 630-673-3088 tonyseo ‘uction1 @hotmail. com THANK YOU FOR YOUR BUSINESS ===== PDF PAGE 22 ===== [Extraction: OCR (rendered-page OCR)] SHIP. 39: NORTH,’ RANGE 9.EAST OFTHE THIRD PRINCIPAL: MERIDI ; F AN 7; THEREOF/;RECORDED ON: JULY. 22, “1856 AS: DOCUMENT, 10634%1N DUSPAG . S bee iy tee STATE OF ILLINOIS COUNTY OF DU PAGE. pte cient it 3 ° THIS IS TO CERTIFY THAT|, ; ~ ILLINOIS:LAND SURVEVOR, HA\ SURVEYED THE AGOVE DESCRIBED PROPERTY’ AS SHOWN ON THE ANNEXED PLAT WHICH IS CORRECT REC RESENTATIDN OF SAID-SUAVEY. ALL DISTANCE lil FEET AND'DECIN DTHERWISE SHOWN. : fe ete : WHEATON. ILLINOIS, _ BUILDINGS WERE:Log pare ===== PDF PAGE 23 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 24 ===== [Extraction: OCR (rendered-page OCR)] Dan Jimenez 630-231-4646 ===== PDF PAGE 25 ===== [Extraction: embedded PDF text] DRAFT WEST CHICAGO HISTORICAL PRESERVATION COMMISSION MEETING July 23, 2024 Members Present: City Staff: Vince Malina, Chairman John Sterrett, City Planner SueEllen Edwards Richard Vigsnes Guests: Reverend Bill Andrews Jim Widlowski Keith Letsche, Vice Chairman (arr. 6:11pm) Members Absent: Wendy Christman 1. Call to Order, Roll Call, and Establishment of a Quorum The meeting was called to order by Chairman Malina at 6:00 p.m. Roll call found Chairman Malina, and Commissioners Edwards, Vigsnes, and Andrews present. Commissioner Christman was excused. With four members present, a quorum was established. Vice Chairman Letsche arrived at 6:11 p.m. to bring the number of members present to five. 2. Public Comment None 3. Certificate of Appropriateness (COA) Review A. C.O.A. 24-13 – 131 Fremont Street – Awning Fabric Mr. Sterrett stated that PGSTL Holdings, LLC, owner of 131 Fremont Street in the Turner Junction Historic District, is requesting approval of a COA to replace two existing awnings on the subject building. The building is used by West Chicago Printing Company and has two green awnings, one 48 feet in length along the front facing Fremont Street and another 7 feet in length on the side of the building facing the parking lot. The awnings have begun to fall into disrepair and are proposed to be removed. The applicant is proposing to keep the existing awning frames and will recondition them. New awning fabric is proposed on each and will consist of Sunbrella material and a Midnight color. No changes to the existing size or location of the awnings are proposed. Jim Widlowski of West Chicago Printing Company stated that no graphics nor signage will be placed on the awnings. After a brief discussion, Chairman Malina made a motion, seconded by Commissioner Edwards, to approve the COA application as presented with the condition that no graphics or signage be put on the awnings unless an additional COA application is submitted, reviewed, and approved. With a voice vote of all ayes the motion carried. ===== PDF PAGE 26 ===== [Extraction: embedded PDF text] B. C.O.A. 24-14 – 200 Main Street – Amendment to C.O.A. 24-04 Mr. Sterrett stated that at the April meeting, members of the Commission voted on the City’s application for a COA for certain appurtenances associated with the 200 Main Street façade renovation including the exterior windows, doors, and lights. The approval of the COA included conditions requiring that the existing silver window frames on the front of the building be refinished in bronze, that a lintel be installed between the new brick on the first floor and the original brick above the first floor, and that the exterior lights above the exit doors be replaced with gooseneck style lights. Since then, Public Works has received a quote for installing a lintel between the two types of brick and a quote for refinishing all of the silver window frames. The exterior lights, however, cannot be replaced with gooseneck style lights because they are no large enough for a battery back-up required for lights above exit doors. At the June HPC meeting, members of the Commission had reviewed at the last meeting if the window frames should be refinished with bronze or if it would be fine to leave them as silver. Since that time, Public Works has indicated they will move forward with refinishing the silver trim with bronze, as was previously approved. Because the original COA approval from April included changing out the existing lights to gooseneck, the approval will need to be amended. The other two requirements, including the installation of the lintel and the refinishing of the silver frame to bronze, will remain as is and no further action is needed by the Commission. After a brief discussion, Chairman Malina made a motion, seconded by Commissioner Vigsnes, to approve the amendment as presented. With a voice vote of all ayes the motion carried. 4. Preliminary Review None 5. Historic District/Landmark Updates Chairman Malina distributed information related to historic districts in other communities. The Commission discussed the landmarking process and extending the boundaries of the historic districts. 6. Approval of June 25, 2024 Meeting Minutes Chairman Malina made a motion, seconded by Vice Christman Letsche, to approve the June 25, 2024 meeting minutes. With a voice vote of all ayes the motion carried. 7. Other Business None 8. Adjournment Chairman Malina made a motion, seconded by Commissioner Christman, to adjourn the meeting. With a voice vote of all ayes the motion carried and the Historical Preservation Commission, at 6:40 p.m., adjourned. Respectfully submitted by John H. Sterrett, City Planner