===== PDF PAGE 1 ===== [Extraction: OCR (rendered-page OCR)] ClTy OF WEST CHICAGO WHERE HISTORY & PROGRESS MEET INFRASTRUCTURE COMMITTEE Thursday, November 7, 2024 7:00 P.M. — City Council Chambers AGENDA Call to Order, Roll Call, and Establishment of a Quorum Approval of Minutes A. Infrastructure Committee of October 3, 2024 Public Participation / Presentations Items for Consent A. Resolution No. 24-R-0079 — Contract Award — Mississippi Lime Company — Hydrated Lime for Fiscal Year 2025 in an Amount Not to Exceed $471,237.00 B. Resolution No. 24-R-0080 — Intergovernmental Agreement with the County of DuPage for Lighted Street Name Signs at Kress Road and Roosevelt Road (IL- 38) and Fabyan Parkway and Roosevelt Road (IL-38) C. Resolution No. 24-R-0083 — Change Order No. 1 — MacCarb, Inc — Carbon Dioxide for Fiscal Year 2024 in an Amount Not to Exceed $4,000.00 Items for Discussion Unfinished Business New Business A. Fiscal Year 2025-2029 Capital Improvement and MFT Program Reports from Staff Adjournment 475 Main Street T (630) 293-2200 West Chicago, Illinois F (630) 293-3028 Ruben Pineda Michael L. Guttman 60185 westchicago.org MAYOR CITY ADMINISTRATOR ===== PDF PAGE 2 ===== [Extraction: OCR (rendered-page OCR)] ITY OF WEST CHICAGO WHERE HISTORY & PROGRESS MEET Draft MINUTES INFRASTRUCTURE COMMITTEE October 3, 2024 7:00 P.M. 1. Call to Order, Roll Call, and Establishment of a Quorum. Chairman Morano called the meeting to order at 7:00 P.M. Roll call found Aldermen Dan Beebe, Heather Brown, Sandra Dimas, Alton Hallett, Joe Morano, and John C. Smith, Jr. present. Alderman Jeanne Short was absent. Staff present included Director of Public Works, Mehul Patel, and Administrative Assistant, Ashley Heidorn. 2. Approval of Minutes A. Infrastructure Committee Minutes of September 5, 2024. Alderman Brown made a motion, seconded by Alderman Beebe to approve the Meeting Minutes of September 5, 2024. Roll call found the vote unanimous for approval. Voting Yea: Aldermen Beebe, Brown, Dimas, Hallett, Morano, and Smith. Voting Nay: 0. 3. Public Participation / Presentations. None. 4. Items for Consent. Alderman Morano requested discussion on Consent Item B, and Alderman Brown requested discussion on Consent Item C. Alderman Dimas made a motion, seconded by Alderman Smith to approve: A. Ordinance No. 24-O-0033 — Authorizing the Disposal of Surplus Equipment, Stock Inventory, and/or Personal Property Owned By the City of West Chicago D. Resolution No. 24-R-0072 — Contract Extension — Rowell Chemical — Liquid Sodium Hypochlorite for Fiscal Year 2025 in an Amount Not to Exceed $105,456.00 Roll call found the vote unanimous for approval. Voting Yea: Aldermen Beebe, Brown, Dimas, Hallett, Morano, and Smith. Voting Nay: 0. 5. Items for Discussion. 4.B. Resolution No. 24-R-0056 — Amendment No. 2 — Professional Engineering Services — Thomas Engineering Group for the Lift Station 5 and Forcemain Project in an Amount Not to Exceed $100,057.58. Mr. Patel provided some background on the Lift Station 5 Project. Unfortunately, the project did not proceed as expected despite the best efforts of City and : - 475 Main Street T (630) 293-2200 Infrastructure Committee Meeting October 3, 2024 West Chicago, Illinois F (630) 293-3028 Ruben Pineda Michael L. Guttman Page 1 of 3 60185 westchicago.org MAYOR CITY ADMINISTRATOR ===== PDF PAGE 3 ===== [Extraction: embedded PDF text] Thomas Engineering Group (TEG) staff. The scheduled date of completion was November 26, 2023, the contractor, Integral Construction, Inc., anticipated completion by the end of January 2024, but the project was not substantially completed until June 2024. In December 2023, City Council authorized Amendment No. 1 to the original engineering contract with TEG for additional construction oversight until the end of January 2024, but they provided these services through July 2024. In September 2024, the City issued a letter to Integral to exercise its right to collected liquidated damages per the contract, and these funds will be used to offset the cost of this Amendment No. 2. Discussion followed. Alderman Dimas made a motion, seconded by Alderman Brown to approve. Roll call found the vote unanimous for approval. Voting Yea: Aldermen Beebe, Brown, Dimas, Hallett, Morano, and Smith. Voting Nay: 0. 4.C. Resolution No. 24-R-0071 - Contract Extension - MacCARB, Inc - Carbon Dioxide for Fiscal Year 2025 in an Amount Not to Exceed $66,000.00. Alderman Brown asked how much carbon dioxide was used in 2023, but Mr. Patel did not have the specific amount available. He explained that due to a calculating error, the estimated amount to be used in FY2024 was a bit low and the reason there is an estimated increase for FY2025. However, it is still well below the average of 300 tons in prior years, and fluctuations in use can occur from time to time. Alderman Dimas made a motion, seconded by Alderman Brown to approve. Roll call found the vote unanimous for approval. Voting Yea: Aldermen Beebe, Brown, Dimas, Hallett, Morano, and Smith. Voting Nay: 0. 6. Unfinished Business. None. 7. New Business. Emerald Ash Borer Treatment. Mr. Patel explained that the City has a little over 1,000 ash trees left, and every year a soil treatment is done and every other year a trunk injection is given as well. On average, 50 trees have been lost annually, but some of the existing ash trees have continued to grow. As the City continues to lose ash trees, there is a question of whether or not to continue the emerald ash borer treatments. At the current rate, it is possible that all would be lost after about 20 years, and continuing to treat them during that time could cost around $1 ,000,000.00. Discussion followed. Alderman Dimas noted it seems like it would be spending money on a lost cause, and there may be future tree ailments to focus on otherwise. Alderman Brown also noted that for the last couple of years she did not support the ongoing treatments, so she is glad future treatments are being questioned. Mr. Patel added that there are currently about 900 open spots available throughout the City for tree planting, so the City could instead focus on filling those to try to counteract potential ash tree losses over time. There was a consensus to stop future emerald ash borer treatments and instead allocate some of the funds to add more trees during the spring parkway tree planting program. Mr. Patel proposed adding $60,000.00 to the tree planting budget, and the Committee concurred. 8. Reports from Staff. Mr. Patel commented that a majority of the City's projects are done with some punchlist items remaining. Conde Street has streetlights installed but the project is waiting on a controller; Harvester Road opened back up to two-way traffic but is also waiting on a controller; and the 200 Main Street electrical cutover finally occurred. Infrastructure Committee Meeting October 3, 2024 Page 2 of 3 ===== PDF PAGE 4 ===== [Extraction: embedded PDF text] 9. Adjournment. At 7:30 P.M., Alderman Brown made a motion to adjourn, seconded by Alderman Hallett. Motion was unanimously approved by voice vote. Respectfully submitted, Ashley Heidorn Administrative Assistant of Public Works Infrastructure Committee Meeting October 3, 2024 Page 3 of 3 ===== PDF PAGE 5 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: 4 { ~ - Resolution No. 24-R-0079 - Contract Award - Mississippi COMMITTEE AGENDA DATE: November 7, 2024Lime Company- Hydrated Lime For Fiscal Year 2025 in COUNCIL AGENDA DATE: November 18, 2024 an amount not to exceed $471,237.00 STAFF REVIEW: Eddie A Ramos, Water Treatment Plant Superintendent SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: Hydrated Lime is one of the various chemicals used at the City's Water Treatment Plant. Approximately 1,300 tons of Hydrated Lime are used annually. Hydrated Lime is the key component to City's water softening process. Hydrated lime reacts with existing bicarbonate salts (Calcium, Magnesium, and most importantly, Radium) and converts them to insoluble carbonate salts, thus removing them to a great degree from the treated water. A Notice to Bidders was advertised in the Daily Herald on September 26, 2024, as well as on the online bidding platform, QuestCDN, and sealed bids were opened on October 17, 2024. Two (2) bids received. The results are below. Bidder Bid Amount Overall Rank Mississippi Lime Company $471,237.00 1 Carmeuse Lime & Stone $690,456.00 - 2 The low bidder was Mississippi Lime Company of St. Louis, Missouri, for a total contract price of $471,237.00 ($362.49/ton delivered). This represents a 12.38% increase over FY 2024 unit prices ($322.54/tons delivered). The increase is largely attributed to the market supply and demand for this product. A bid tab showing the results of the bid opening is attached for reference. Staff recommends that a contract be awarded to Mississippi Lime Company for the procurement of Hydrated Lime, at a unit price of $362.49/ton delivered, for an amount not to exceed $471,237.00 for FY 2025. Adequate funds will be budgeted in the Water Fund, Water Treatment Plant Operations - Chemicals (06- 34-48-4626) to cover this expenditure in FY2025. ACTIONS PROPOSED: Approve Resolution No. 24-R-0079 authorizing the Mayor to execute a contract with Mississippi Lime Company of St. Louis, Missouri, for the procurement of Hydrated Lime for Fiscal Year 2025 in an amount not to exceed $471,237.00. COMMITTEE RECOMMENDATION: ===== PDF PAGE 6 ===== [Extraction: embedded PDF text] RESOLUTION NO. 24-R-0079 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT WITH MISSISSIPPI LIME COMPANY FOR THE PROCUREMENT OF ROTARY HYDRATED LIME FOR FISCAL YEAR 2025 IN AN AMOUNT NOT TO EXCEED $471,237.00. BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a contract with Mississippi Lime Company of St. Louis, Missouri, for the procurement of Rotary Hydrated Lime for Fiscal Year 2025 in an amount not to exceed $471,237.00, in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 18th day ofNovember 2024. AYES: NAYES: ABSTAIN: ABSENT: Mayor Ruben Pineda ATTEST: Valeria Perez, Executive Office Manager ===== PDF PAGE 7 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: _4~,~~------- Resolution No. 24-R-0080 - Intergovernmental Agreement FILE NUMBER: _____ _with the County of DuPage for Lighted Street Name Signs at Kress Road and Roosevelt Road (IL-38) and Fabyan COMMITTEE AGENDA DATE: November 7, 2024 Parkway and Roosevelt Road (IL-38) COUNCIL AGENDA DATE: November 18, 2024 STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE _________ _ APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE _________ _ ITEM SUMMARY: The Illinois Department of Transportation (IDOT) under its contract #62G63 is proposing a project along IL-38 from east of Technology Boulevard to County Farm Road. The major scope of work includes resurfacing within the project limits and upgrading sidewalks in compliance with the American Disability Act (ADA) requirements. As part of these improvements, in accordance with the City's 2016 Strategic Plan, the City of West Chicago requested installation of landscape medians at strategic locations, installation of LED street name signs at signalized intersections and painting signal equipment within the City limits. The requested improvements will provide aesthetic upgrades within the project corridor. On September 16, 2024 the City Council approved Resolution No. 24-R-0064 entering into an Intergovernmental Agreement (IGA) with IDOT to cover the costs for improvements requested by the City. Within the project limits, the intersection of Kress Road at Roosevelt Road and part of the intersection of Fabyan Parkway at Roosevelt Road are under the jurisdiction of County of DuPage. Staff approached the County for its desire to participate in the cost sharing for improvements at these intersections. The County has agreed to reimburse the City for the fabrication and installation and any future maintenance of two lighted street name signs and associated cables at these intersections, which will reduce the cost of City's participation. The costs will be determined at the completion of the project construction. The County has prepared an IGA to memorialize its participation. Staff has reviewed the IGA and recommends approval of the IGA. ACTIONS PROPOSED: Approve Resolution No. 24-R-0080 authorizing the Mayor to execute an Intergovernmental Agreement with the County of DuPage for Lighted Street Name Signs at Kress Road and Roosevelt Road (IL-38) and Fabyan Parkway and Roosevelt Road (IL-38). COMMITTEE RECOMMENDATION: ===== PDF PAGE 8 ===== [Extraction: embedded PDF text] RESOLUTION NO. 24-R-0080 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE AN INTERGOVERNMENTAL AGREEMENT WITH THE COUNTY OF DUPAGE FOR LIGHTED STREET NAME SIGNS AT KRESS ROAD AND ROOSEVELT ROAD (IL-38) AND FABYAN PARKWAY AND ROOSEVELT ROAD (IL-38) WHEREAS, the City of West Chicago (MUNICIPALITY) has entered into a separate agreement with the Illinois Department of Transportation (hereinafter "IDOT")for roadway improvements along Roosevelt Road (IL 38) (hereinafter "PROJECT"); and WHEREAS, as part of the PROJECT, the MUNICIPALITY has requested the COUNTY to reimburse the MUNICIPALITY for the fabrication and installation and any future maintenance of two (2)lighted street name signs and associated cables at the intersections of the two (2) County Highways included in the PROJECT; at Roosevelt Road (IL 38)and CHIS/Kress Road and at Roosevelt Road (IL 38)and CH 21/Fabyan Parkway(hereinafter "STREET NAME SIGNS"); and WHEREAS, the COUNTY and MUNICIPALITY, in order to facilitate the free flow of traffic and ensure the safety of the public desire to enter into an intergovernmental agreement to define the construction, energy responsibilities and future maintenance related to said STREET NAME SIGNS; and WHEREAS, the STREET NAME SIGNS lie within the corporate limits of the MUNICIPALITY; and WHEREAS, the COUNTY and the MUNICIPALITY have determined that it is in their mutual best interests to enter into this AGREEMENT; and WHEREAS, the COUNTY by virtue of its power set forth in "Counties Code" (55 ILCS 5/5-1001 et seq.) and "Illinois Highway Code" (605 ILCS 5/5-101 et seq.), ===== PDF PAGE 9 ===== [Extraction: embedded PDF text] and the MUNICIPALITY by virtue of its power set forth in the "Municipal Code" (65 ILCS 5/1-1-1 et seq.) are authorized to enter into this AGREEMENT; and BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute an Intergovernmental Agreement with the County of DuPage for lighted street name signs at Kress Road and Roosevelt Road (IL-38) and Fabyan Parkway and Roosevelt Road (IL-38), in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 18th day ofNovember 2024. AYES: NAYES: ABSTAIN: ABSENT: Ruben Pineda, Mayor ATTEST: Valeria Perez, Executive Office Manager ===== PDF PAGE 10 ===== [Extraction: embedded PDF text] AGREEMENT BETWEEN THE COUNTY OF DU PAGE AND THE CITY OF WEST CHICAGO FOR LIGHTED STREET NAME SIGNS AT CH 18/KRESS ROAD AND ROOSEVELT ROAD (IL 38) AND CH 21/FABYAN PARKWAY AND ROOSEVELT ROAD (IL 38) This Agreement (hereinafter referred to as "AGREEMENT") is executed this ____ day of _________ , 2024, between the County of DuPage (hereinafter referred to as "COUNTY") , a body corporate and politic, with offices at 421 North County Farm Road, Wheaton, Illinois and the City of West Chicago, Illinois (hereinafter referred to as "MUNICIPALITY"), municipal corporation and home rule unit of local government under the laws and constitution of the State of Illinois, with offices at 475 Main Street, West Chicago, Illinois 60185. The COUNTY and the MUNICIPALITY are hereinafter sometimes individually referred to as a "party" or together as the"parties." RECITALS WHEREAS, the MUNICIPALITY has entered into a separate agreement with the Illinois Department of Transportation (hereinafter "IDOT")for roadway improvements along Roosevelt Road ( IL 38) (hereinafter "PROJECT"); and WHEREAS, as part of the PROJECT, the MUNICIPALITY has requested the COUNTY to reimburse the MUNICIPALITY for the fabrication and installation and any future maintenance of two (2)lighted street name signs and associated cables at the intersections of the two (2) County Highways included in the PROJECT; at Roosevelt Road (IL 38)and CH18/Kress Road and at Roosevelt Road (IL 38)and CH 21/Fabyan Parkway(hereinafter "STREET NAME SIGNS"); and WHEREAS, the COUNTY and MUNICIPALITY, in order to facilitate the free flow of traffic and ensure the safety of the public desire to enter into an intergovernmental agreement to define the construction, energy responsibilities and future maintenance related to said STREET NAME SIGNS; and WHEREAS, the STREET NAME SIGNS lie within the corporate limits of the MUNICIPALITY; and WHEREAS, the COUNTY and the MUNICIPALITY have determined that it is in their mutual best interests to enter into this AGREEMENT; and WHEREAS, the COUNTY by virtue of its power set forth in "Counties Code" (55 ILCS 5/5-1001 et seq.) and "Illinois Highway Code" (605 ILCS 5/5-101 et seq.), and the MUNICIPALITY by virtue of its power set forth IGA for LED Street Signs West Chicago 1 10.16.24 ===== PDF PAGE 11 ===== [Extraction: embedded PDF text] in the "Municipal Code" (65 ILCS 5/1-1-1 et seq.) are authorized to enter into this AGREEMENT; and NOW, THEREFORE, in consideration of the premises, the mutual covenants, terms, and conditions herein set forth, and the understandings of each party to the other, the parties do hereby mutually covenant, promise and agree as follows: 1.0 INCORPORATION 1.1 . All recitals set forth above are incorporated herein and made part thereof, the same constituting the factual basis for this AGREEMENT. 1.2. The headings of the paragraphs and subparagraphs of this AGREEMENT are the inserts for convenience of reference only and shall not be deemed to constitute part of this AGREEMENT or to affect the construction hereof. 2.0 SCOPE OF AGREEMENT 2.1 The COUNTY and the MUNICIPALITY agree that the scope of this AGREEMENT involves the COUNTY to reimburse the MUNICIPALITY for the fabrication, and installation of the signs as part of the PROJECT and future costs incurred by the MUNICIPALITY, pursuant to Section 3.4 and 3.5 herein, of the two (2) STREET NAME SIGNS as listed below: Lighted Street Sign One Doub1e-Sided Sign Location Roosevelt Road (IL38) Indicating "Kress Road" at CH 18 Kress Road Roosevelt Road (IL38) Indicating "Fabyan Parkway" at CH 21 Fabyan Parkway 3.0 RESPONSIBILITIES OF THE COUNTY 3.1 The COUNTY agrees to reimburse the MUNICIPALITY for the actual costs incurred as part of the PROJECT to furnish and install the two (2) STREET NAME SIGNS in Section 2.0 above, as well as associated electrical cables and peripheral hardware. The COUNTY shall make said payments as outlined hereinafter. IGA for LED Street Signs West Chicago 2 10.16.24 ===== PDF PAGE 12 ===== [Extraction: embedded PDF text] 3.2 The COUNTY agrees to pay the MUNICIPALITY fifty percent (50%) of the costs upon award of the contract by IDOT for the STREET NAME SIGNS, including associated cable, based upon as-bid unit prices and upon receipt of a properly documented invoice from the MUNICIPALITY. The COUNTY will pay within sixty (60) days of receipt. 3.3 Upon completion and acceptance of the STREET NAME SIGNS, not to be unreasonably withheld by the COUNTY, and based upon the documentation of final costs and quantities for the fabrication and installation of the STREET NAME SIGNS, including associated cable, submitted by the MUNICIPALITY to the COUNTY in a final invoice, the COUNTY agrees to reimburse the MUNICIPALITY the balance of the actual cost as referenced herein above within sixty (60) days of receipt of a properly documented invoice from the MUNICIPALITY. 3.4 The COUNTY shall reimburse the MUNICIPALITY for the actual costs of maintaining the STREET NAME SIGNS when the MUNICIPALITY is invoiced by IDOT or the IDOT's electrical maintenance contractor and the COUNTY receives a properly documented invoice from the MUNICIPALITY. The COUNTY will pay within sixty (60) days of receipt. 3.5 The COUNTY reserves the right to coordinate any necessary maintenance activities with IDOT or other entities as the COUNTY deems appropriate and to pay maintenance costs directly to IDOT, IDOT's electrical maintenance contractor, the COUNTY' s electrical maintenance contractor, or other qualified entities without involving the MUNICIPALITY. 4.0 RESPONSIBILITIES OF THE MUNICIPALITY 4 .1 MUNICIPALITY shall make all necessary arrangements for engineering, construction, and ongoing maintenance with IDOT at no cost to the COUNTY except as set forth herein. 4. 2 MUNICIPALITY shall be responsible for any energy costs billed by IDOT or the energy provider related to the STREET NAME SIGNS. 4. 3 MUNICIPALITY agrees to waive all local permit fees for the COUNTY related to the PROJECT, and any future maintenance activities, if applicable. IGA for LED Street Signs West Chicago 3 10.16.24 ===== PDF PAGE 13 ===== [Extraction: embedded PDF text] 5.0 FUTURE MODERNIZATION/RECONSTRUCTION 5.1 The parties acknowledge that this AGREEMENT does not change or alter any existing responsibilities for maintenance or energy costs of any other elements of the traffic signal installations in the PROJECT. Further, this AGREEMENT does not obligatef either party, nor IDOT, to continue to maintain or operate STREET NAME SIGNS. However, during the term of this AGREEMENT, so long as the STREET NAME SIGNS are operational, the parties agree to maintain and pay for the signs' operation according to the terms of this AGREEMENT. 5.2 If, in the future, it is determined that one or both of the traffic signals in the PROJECT require modernization or reconstruction due to age, condition, etc. or if any construction project ( s) is undertaken by IDOT, MUNICIPALITY, or COUNTY, which result in the need to modernize or reconstruct said traffic signals, the COUNTY will be responsible for the costs to relocate or replace the STREET NAME SIGNS. 5.3 If, in the future, any modifications to the STREET NAME SIGNS are required resulting from work undertaken by a third-party entity, including but not limited to a private developer, utility company, airport authority, school district, or park district, none of the construction costs related to the STREET NAME SIGNS will be charged to the COUNTY. The MUNCIPALITY shall be responsible for assigning costs to the proper entity for said work. 6.0 INDEMNIFICATION 6.1 The COUNTY shall, to the extent permitted by law, indemnify, hold harmless and defend MUNCIPALITY, its officials, officers, employees, and agents from and against all liability, claims, suits, demands, proceedings and action, including costs, fees and expense of defense, arising from, growing out of, or related to, any loss, damage, injury, death, or loss or damage to property resulting from, or connected with, the COUNTY's negligent or willful acts, errors or omissions in its performance under this AGREEMENT to the extent permitted by law. 6. 1.1. The COUNTY and MUNCIPALITY acknowledge that the COUNTY has made no representations, assurances or guaranties regarding the COUNTY'S or any successor's or assign's authority and legal IGA for LED Street Signs West Chicago 4 10.16.24 ===== PDF PAGE 14 ===== [Extraction: embedded PDF text] capacity to indemnify MUNCIPALITY as provided for in this AGREEMENT. In the event a court of competent jurisdiction holds that the COUNTY, or any successor or assign, is deemed to lack the lawful authority or ability to indemnify, defend or hold harmless MUNCIPALITY, or any person or entity claiming a right through MUNCIPALITY, or in the event of change in the laws of the State of Illinois governing the COUNTY'S or any successor's or assign's indemnification authority, such occurrence ( s) shall not affect the validity and enforceability of the remainder of this AGREEMENT or the parties rights and obligations provided for therein. 6.2 MUNCIPALITY shall indemnify, hold harmless and defend the COUNTY, its officials, officers, employees, and agents from and against all liability, claims, suits, demands, proceedings and action, including costs, fees and expense of defense, arising from, growing out of, or related to, any loss, damage, injury, death, or loss or damage to property resulting from, or connected with, MUNCIPALITY's negligent or willful acts, errors or omissions in its performance under this AGREEMENT to the extent permitted by law. MUNCIPALITY does not hereby waive any defenses or immunity available to it with respect to third parties. 6.3 Nothing contained herein shall be construed as prohibiting the COUNTY, its officials, directors, officers, agents and employees, from defending through the selection and use of their own agents, attorneys and experts, any claims, suits, demands, proceedings and actions brought against them. Pursuant to Illinois law, 55 ILCS 5/3-9005, any attorney representing the COUNTY, under this paragraph or paragraph 6 .1, who is not already an Assistant State's Attorney, is to be appointed a Special Assistant State's Attorney, as provided in 55 ILCS 5/3-9008. The COUNTY's participation in its defense shall not remove MUNCIPALITY's duty to indemnify, defend, and hold the COUNTY harmless, as set forth above. 6.4 The COUNTY does not waive, by these indemnity requirements, any defenses or protections under the Local Governmental and Governmental Employees Tort Immunity Act (745 ILCS 10/1 et seq.) or otherwise available to it, or OWNER, under the law. IGA for LED Street Signs West Chicago 5 10.16.24 ===== PDF PAGE 15 ===== [Extraction: embedded PDF text] 6.5 Any indemnity as provided in this AGREEMENT shall not be limited by reason of the enumeration of any insurance coverage herein provided. 7 . 0 AGREEMENT TERM 7.1 This AGREEMENT is effective from the date fully executed by the parties and remains in full force and effect for ten (10) years and will automatically renew at the end of each term for another ten (l0)years unless the County provides notice of termination at any time during a term pursuant to par. 14 .1. 8 . 0 ENTIRE AGREEMENT 8.1. This AGREEMENT represents the entire AGREEMENT between the parties with respect to the STREET NAME SIGNS and supersedes all previous communications or understandings whether oral or written. 9.0 NOTICES 9 .1. Any notice required hereunder shall be deemed properly given to the party to be notified at the time it is personally delivered or mailed by certified mail, return receipt requested, postage prepaid, to the party's address. The address of each party is as specified below; either party may change its address for receiving notices by giving notices thereof in compliance with the terms of this subsection. For MUNICIPALITY: City of West Chicago Public Works Department 475 Main Street West Chicago, IL 60185 Attn: Mehul Patel Director of Public Works Phone: 630.293.2200 Email: mpatel@westchicago.org IGA for LED Street Signs West Chicago 6 10.16.24 ===== PDF PAGE 16 ===== [Extraction: embedded PDF text] For COUNTY: DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL 60187 Attn: Stephen M. Travia, P.E. Director of Transportation Phone: 1 630.407.6900 Email: stephen.travia@dupagecounty.gov 10.0 AMENDMENT OR MODIFICATION OF THIS AGREEMENT 10.1 No modification or amendment to this AGREEMENT shall be effective until approved by the parties in writing. 10.0 NON-ASSIGNMENT 10.1 Subject to paragraph 10.2 hereinafter, this AGREEMENT shall not be assigned by either party without the written consent of the other party, whose consent shall not be unreasonably withheld. 10. 2 In the event, in the future, part or all of the PROJECT involving the STREET NAME SIGNS no longer lies within the corporate limits of the MUNICIPALITY, the MUNCIPALITY may, upon written notice to the COUNTY, per Section 9.0 above, but without the COUNTY's consent, assign all of its interest in and to this AGREEMENT to the Municipality/Agency that the PROJECT involving the STREET NAME SIGNS becomes a part of. 11.0 GOVERNING LAW 11.1. This AGREEMENT shall be governed by the laws of the State of Illinois as to both interpretation and performance. 11.2. The forum for resolving any disputes concerning the parties' respective performance, or failure to perform, under this AGREEMENT, shall be the Judicial Circuit Court for DuPage County. 12.0 SEVERABILITY 12.1. In the event any provision of this AGREEMENT is held to be unenforceable or invalid for any reason, the enforceability thereof shall not affect the remainder of the AGREEMENT. The remainder of this AGREEMENT shall be construed as if not containing the particular provision and shall continue in full force, effect, and enforceability, in accordance with its terms. IGA for LED Street Signs West Chicago 7 10.16.24 ===== PDF PAGE 17 ===== [Extraction: embedded PDF text] 13.0 FORCE MAJEURE 13.1 Neither party shall be liable for any delay or non- performance of their obligations caused by any contingency beyond their control including but not limited to Acts of God, war, civil unrest, strikes, walkouts, fires and natural disasters. 14.0 TERMINATION 14. 1 The COUNTY may, at its sole discretion, withdraw ongoing financial and maintenance support for the STREET NAME SIGNS at any time and for any reason. In such case, the COUNTY shall notify the MUNICIPALITY at least sixty (60) days prior of its intent and give MUNICIPALITY the opportunity to make alternative arrangements for maintaining the STREET NAME SIGNS. IN WITNESS whereof, the parties set their hands and seals as of the date first written above. COUNTY OF DuPAGE CITY OF WEST CHIHCAGO Deborah A. Conroy, Chair Authorized Signatory DuPage County Board Print Name Title ATTEST: ATTEST: Jean Kaczmarek, County Clerk Signature Print Name Title IGA for LED Street Signs West Chicago 8 10.16.24 ===== PDF PAGE 18 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: _ 4__,__,-=L,=--c;-• __ Resolution No. 24-R-0083 - Change Order No. 1 - COMMITTEE AGENDA DATE: November 7, 2024MacCarb, Inc - Carbon Dioxide for Fiscal Year 2024 in COUNCIL AGENDA DATE: November 18, 2024 amount not to exceed $4,000.00 STAFF REVIEW: Eddie A Ramos, Water Treatment Plant Superintendent SIGNATURE_________ _ APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE _______ __ _ ITEM SUMMARY: Carbon Dioxide is one of the various chemicals used at the City's Water Treatment Plant. Approximately 180 tons of Carbon Dioxide are used annually. Liquid Carbon Dioxide is used in the treatment process to stabilize the water chemistry after the softening process is complete. This process, known as Recarbonation, lowers the pH of the softened water to an acceptable level. On November 20, 2023, the City Council approved Resolution No. 23-R-0085, entering a contract with MacCarb, Inc. for the procurement of liquid Carbon Dioxide for Fiscal Year 2024 in the amount of $54,000.00. Staff had made an error in estimating the amount Carbon Dioxide required for Fiscal Year 2024. Staff recommends approving Change Order No. 1 to MacCarb's original contract for the procurement of Carbon Dioxide for Fiscal Year 2024 in the amount not to exceed $4,000.00, bringing the total contract value to $58,000.00. Adequate funds are available the Water Fund, Water Treatment Plant Operations - Chemicals (06-34-48- 4626) to cover this expenditure in FY2024. ACTIONS PROPOSED: Approve Resolution No. 24-R-0083 authorizing the Mayor to execute Change Order No. 1 with MacCarb, Inc. of Elgin, Illinois, for the procurement of Carbon Dioxide for Fiscal Year 2024 in an amount not to exceed $4,000.00. COMMITTEE RECOMMENDATION: ===== PDF PAGE 19 ===== [Extraction: embedded PDF text] RESOLUTION NO. 24-R-0083 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. I WITH MACCARB, INC. FOR THE PROCUREMENT OF LIQUID CARBON DIOXIDE FOR FISCAL YEAR 2024 IN AN AMOUNT NOT TO EXCEED $4,000.00 FOR A REVISED CONTRACT AMOUNT OF $58,000.00 BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a Change Order No. 1 with MacCarb, Inc. of Elgin, Illinois, for the procurement of Carbon Dioxide for Fiscal Year 2024 in an amount not to exceed $4,000.00 for a revised Contract amount of $58,000.00, in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 18th day of November 2024. AYES: NAYES: ABSTAIN: ABSENT: Mayor Ruben Pineda ATTEST: Valeria Perez, Executive Office Manager ===== PDF PAGE 20 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: 'I' AGENDA ITEM NUMBER: -q. •~ Fiscal Year 2025-2029 Capital Improvement and MFT Program COMMITTEE AGENDA DATE: November 7, 2024 COUNCIL AGENDA DATE: STAFF REVIEW: Mehul T. Patel, P.E., Director of Public Works SIGNATURE _________ _ APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE____ _____ _ ITEM SUMMARY: West Chicago's Long Range Capital Improvement Program (CIP) is one of the major planning documents that establishes the context for the physical development and improvement of the community. Through it, the City Council establishes the nature and quality of many physical characteristics of West Chicago, which overall impacts our quality of life. The five-year CIP provides a context and direction for the development of the annual capital budget and serves as a major policy document. In it, the City Council establishes the capital work program for the next twelve months, as well as the fundamental direction of the capital planning and execution for the following four budget years. The CIP has been designed and annually modified to continue with an aggressive street rehabilitation program (i.e., resurfacing, reconstruction, etc.), municipal buildings and grounds improvement program, and the continuation of various annual Citywide programs, including pavement rejuvenation, pavement markings maintenance, sidewalk cutting, sidewalk and curb & gutter replacement, forestry maintenance (removals and trimmings), rights-of-way maintenance (mowing) and tree replacement. In FY 2024, the roadway and utility improvement capital outlay projects included the 2024 Roadway Rehabilitation, Harvester Road Reconstruction Project, Conde Street Resurfacing Project, and Klein Road Culvert Replacement Project. In addition, the annual maintenance projects included Pavement Rejuvenation, Pavement Marking Maintenance, Sidewalk Cutting, Sidewalk Curb and Gutter Replacement, and Crack Sealing. The Water and Sewer Fund capital outlay projects included the Fremont Water Tower Rehabilitation Project and Sanitary Sewer Rehabilitation projects. Furthermore, the building improvement projects included the completion of 200 Main Street Interior Renovation Project, Streets Division North Garage Insulation Project, Streets Division Gate Replacement Project, Streets Division Overhead Door Replacement Project, and Fleet Garage Overhead Door Replacement Project. Furthermore, the building improvement projects such as the Museum Roof Replacement Project was deferred to FY 2026 and the Police Department Roof Top Unit (RTU) and Boilers Replacement Project was deferred to FY 2025 and budgeted again due to scope and construction budget increase during the start-up of the projects. In FY 2024, approximately $6.95 Million in major capital improvement projects were completed throughout the City, which are summarized in the enclosed table. Furthermore, in FY 2024, Staff, in coordination with consulting engineers, applied for various grant applications in FY 2024 as follows: 1.) Illinois Transportation Enhancement Program (ITEP) grant for the Main Street Streetscaping Improvement Project on Main Street from Wilson Ave to IL-59; 2.) Rebuild Downtowns & Main Streets (RDMS) grant for Rebuild West Chicago Downtown and Main Street Project on Main Street from Washington St to Wilson Ave, including Turner Ct.; 3.) Community Development Block Grant (CDBG) for the York Avenue Area Watermain and Streets Rehabilitation Project; and 4.) Tree Equity Grant for Citywide tree planting to diversify its canopy. In addition, Staff applied for and successfully secured Surface Transportation Program (STP) grants for both construction and construction engineering for the Atlantic Drive Resurfacing Project in the amount of $1,479,344 for FY 2028 and the Arbor Avenue Resurfacing Project in the amount of $1,377,149 for FY 2029. ===== PDF PAGE 21 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO Similar to FY 2024, another packed year for infrastructure improvements is scheduled for FY 2025. Project locations and limits are shown on the enclosed Location Map. The Motor Fuel Tax (MFT) funded 2025 Roadway Rehabilitation Project will tentatively include improvements on Trillium Tr., Spring Cress Ln., Cranesbill Ln., Columbine Ln., Wild Ginger Ln., Aster Ln., Bainbridge Blvd., Havens Dr., Wyeth Dr., Andrus Dr., Camden Dr., and Culver Ln. with construction anticipated to begin in Spring 2025. The CDBG-funded Bishop Street and Brown Street Water Main and Stre·ets Rehabilitation Project will include water main, lighting, and roadway improvements on Bishop St. and Brown St. with construction anticipated to begin in the Summer of 2025. The Economic Development Program (EDP) grant-funded 2025 Nuclear Drive and Northwest Drive Reconstruction Project will include roadway improvements on Nuclear Dr. and Northwest Dr. with construction anticipated to begin in Spring 2025. The DCEO grant-funded IL-38 & Technology Blvd Traffic Signal Installation Project is anticipated to begin in the Summer of 2025. Finally, the STP grant-funded Town Road Reconstruction Project along Town Rd. between IL-38 and Washington St. is tentatively scheduled for June 2025 IDOT letting. The Town Road Reconstruction Project will be administered through IDOT and is anticipated to be awarded in FY 2025 by IDOT, with construction anticipated to start in Summer 2025. In FY 2025, municipal building maintenance projects will include improvements at the City Hall and the Police Department. Staff also anticipate completing the DCEO grant-funded Site Remediation Project at 119 W Washington Street. In addition, coordination with staff and consultants will begin in FY 2025 to complete the issuance of bonds for various phases of the 2026-2028 Industrial Streets Improvement Project, including the design for Phase I, which is programmed for construction in FY 2026. All annual maintenance projects will also take place in 2025. The 5-year Capital Improvement Program as proposed totals $49,832,900, which is an annual average of $9,966,580 per year. The street improvement program will be partially funded using various dollars such as bonds, MFT, STP, DCEO, and CDBG. Some of these projects also include watermain replacement as well as sanitary sewer improvements, which will be funded by Water and Sewer Funds respectively. The Capital Equipment Replacement Fund (CERF) is used for purchases of vehicles and equipment across all of the Departments in the City. In FY 2025, there are a total of seventeen (17) pieces of equipment/vehicles due for replacement for an anticipated cost of $1,132,300. The FY 2025-2029 Capital Improvement Program outlines the full range of the City's physical improvement needs to the extent that they can be anticipated or predicted based on the availability of funding. Cost estimates have been assigned to each project and the projects have been scheduled over the five-year span of the program. By approving the FY 2025-2029 Capital Improvement Program, the City Council will set priorities for the projects outlined in the program, thus giving direction to staff on how to proceed. ACTIONS PROPOSED: Recommend approval of the FY 2025-2029 Capital Improvement and MFT Program to the City Council. COMMITTEE RECOMMENDATION: ===== PDF PAGE 22 ===== [Extraction: embedded PDF text] TY I DR ON WIL X IN OOD CT CIR HILL S HONEY O DR ROUTE TR EW HONEYSUCKLE RBURY LN F WISCON 006 IL RD S CT WAY LAK T YAL WARWICK RD 009 CANTE PACIFIC WAYNE RO 010 J W 008 A LN MES RR 005 AY E OOD 004 C 003 007 HILL CT 002 W POWIS MUNGER ERSET LN BAINBRIDGE BLVD KIDWEL L RA 001 LN DR FORSYTHIA T CT BRIAR CT GS D RD OM S R KIN S SMITH O RD W CIR GATE DR CHA F SMITH RD BERKSHIRE CT E RI PEPPER CT R EN E SMITH RD CHALL G CT E DR CT ALAMANCE T JENLOR N QUEEN A KIN A HAVENS TRL DR DR DR AVE KING ELIZABETH W ELIZABETH DR DR T BLVD S RD CT AUBREY RD LN RD RD CT JAMES EANORCK KING KING WY LN ETHDR L BRAEMORE DR AUGUSTA DORAL ADE UNION WOODLAND PRAIRIE E SPICER WIANT AVARD KAELIN NELTNOR LIA CTWILLIAM KING LN DR DR PACIFIC DR RD LAKE ST ANDREWS LN LEHMAN 017 LN RICHARD 013 020 ANDRUS CT LN 018 019 WHITNEY RD RD VIEW BLANCHARD RR POWIS AMDEN CULVER CT KING ILLINOIS 015 AY C 016 LN 014 BLVD SHENANDOAH LINDS RD GOLF RICHARD AVE KLEIN BLVD CT RD AVE 011 AVE LN OV DR RD WOODL ST ER D AND TRL S KING WHITNEY RD PRAIRIE OAKS CT RNHART JAMES 012 BEC BA QUEEN MANSFIE K LD RD NPORT L KAELIN LOCUST NORRIS ST ANNE AVE FAIR KENWOOD NELTNOR LN CT PATH AVAR N UNIONNORTON BAINBRIDGE SMITHN - POWIS CT DAVE CT J WIANT CAMDEN FAIRCHILD LAKE KING DR DR STOCKBERRY LEHMAN RDPACIFIC ELEANOR RD WOODLAND EDWARD 0 LN LIES RD HENRY LN ELGIN RRCREEK LN KING LN BARNHART TANAGER LN JOW CT ST KING TR B RGE O CHARLES DR SUDBURY DR AVE RD GE FOXFIELD INDIAN AVE AVE AVE OBO W BRANCH R RD BUNTINGCT HIBLACK D WAY KING TRL T AELIN H E A K RD W K IL NORRIS LOCUST SANDPIPER LN LAK KLEIN WOODLAND KENWOOD ME AD PARTRIDGE DR TRL RD KE POWISUNION PHEASANT DR SMITH LN RD MEADOW PHEASANT RD 029XFIELD CT PACIFIC LN BEECH ST SHADY 030 BLVD 028 LN FLOWER CT 026 LAKEVIEWCT 027 RR 025 RD 024 023 WIANT 022 WILD 021 CHICKADEE AVE MULBERRY DR RD NELTNOR KNOLL OAKS RD RD RD OAK KNOLL RD UNION OAK ARBORLN FAIR ELM POWIS HICKORY SHAGBA AVE MULBERRY R WOODLAND CT PACIFIC K DR CT DR DIVERSEY AVE RR ELM MAPLE NORRIS NORTH AVE MAIN ST DIVERSEY PKWY EAGLE RIDGE WYNN AVE WYNN AVE OAK LN CT WYNN AVE MULBERRYDR RD RD RD ST. ANDREWS NORTH AVE CT DR INDIANWOOD LN RD DR TER DR KLEIN KEIL CT AVE KAUTZ ILLINOIS ST. CHARLES WAY BLVD OLD WAYNE CT 38TH PL JUNIPER CIR ARAPAHO CHEROKEE DR KENWOOD AVE LESLIE TIMBERLINE PRAIRIE VALEWOOD LAKEWOOD CUYAHOGA LN CHIPPEWAD 040 0 039 MO 035 POPLAR RN 037 POPLARPL PATH- 038 ILLINOIS AVE 034 FRANCISICANTRENTNELTNOR 033 ELGIN CAPE AVE 036 031 032 CAPE AVE NORTHAVE TERESALN WAY INGSIDE TOWER RD E AVE WISCONSIN BRANCH DR AVE CAP RD CENTRAL OOOoo NORTHAVE LAKEWOOD POWIS CT CT POWIS OHIO AVE DR RD DR RD DE KLEIN ANDERSEN REQUE ST CHARLES RD DUPAGE ATLANTIC CUL DR RD SAC [J POST RD OAKCIR NELTNOR FIELDCREST DR NORTHAVE F KAUTZ MEADOWV CIR LAURELLN BLVD CROSSING IEW DR 050 OAK VALEWOOD WO HERIT O 049 046 D MEADOWVIEW XING RD TERN AV AGEWOODS DR 045 PRAIRIE --~□□~, 044 DR 041 POST 042 043 CT SHINGLE OAK DR 048 CRE AVIATION DR 047 ST UNION OAKS VALE RD s;J LN WHITE DR TC DR SWEETBAY L MARSHVIEW CROSSING OAK E 0 LN SNOWBERRY PACIFIC LN A HE ANCIENT LN N MLOCK LN WENSON AVE RR SANDCHERRY G PRINCE PRAIRIE ARTHUR DR DUPAGE OAK □b□J CT CT WAYNEWOOD DR ILLINOIS RED '-----------.0. DR GLEN RD PRAIRIE THOMASSASSAFRASDR MAR PATH- C INTERNATIONAL DR E HAHNDORF ST COMMERCE DR WINSTON ST LL ELGIN A KINGS DR NORTHWEST AVE L DR N RD ILLINOIS PRAIRIE PATH BRANCH CT KINGS 058 HILLCT SPRING DR CT CRESS 059 CT SPRING CIR KI WOODSIDE LN LN ENTERPRISE CRESS NUCLEAR LN NGS AMBERCT TR TALIE GAVIN CT HOWARD POWIS DE DR LILLIAN A CRANESBILL CR DR RD LN R ROSEWOOD DR 060 LN DR DR N D ODSI TONI ST WO TARA LN LN DR 056 E KAUTZ D 055 LAK TRILLIUM N 057 054 COLUMBINE INGALTON E LN OWNE HERRYWOOD N RIDGEWOOD LN 053 S T HARVESTER RD HARVESTER RD R N H Y 052 W D R S C ID ASTER ILL ACO 051 BONNIE ST D WOO D IL CAROLINA ATLANTIC E L AVE DR LE N W I DR WILD BLACKHAWK LO R D ILLINOIS WOO W DE OS A R E INDIAN GINGER C LL R H LN LDWOOD KNOLL VE PRAIRIE R NELTNOR RD E O A LN C Y DR BLVD E PATH- N K OODSI OR K ELG DR LON G IN OAK ARB W RD AINSLE RIDGEWOODCT HAWTHORNE LN BRANCH JACOBCT HAWTHORNE LN HAWTHORNE LN HAWTHORNE LN UNION ACADEMY LN RD CT BAYBERRY PEACHTREE LN HELEN AVE RD DR RD DR CT AVE PACIFIC AVE RD RD CT BLVD DR INDIAN RR RD RISCH HILLCREST HICKORY LN OR CT N HICKORY LN CAMBELL CROSSING QUEEN BLOSSOM CRABAPPLE T WILLIAMS FARM KNOLL PILSEN CT EL RD KRESS MAC N RD APPLEGATE DEERING INDUSTRIAL PRINCE INGALTON CHERRY PINE AVE PIONEER HONEYSUCKLE KAUTZ BERKSHIRE RD CT MCCORMICK LN PLUMTREE LN AVE 069 070 068 LEE RD LEE RD AVE LEE RD 067 066 WISCONSIN 065 AVE RD 064 LEE RD DR GENEVA DR 063 062 BLVD LANE JAMES AVE JAMES AVE DUMHAM DR CENTRAL CT RIDGELAND DR 061 RD ARBOR WILLIAMS HIGH RIDGE ALENA DR RAY AVE RAY AVE COURSE 0 NOR-OAKS RAY AVE NELTNOR DR AVE CT NATIONAL RD NATIONAL ST PERSIMMON PILSBURY DR NATIONAL ST OAK HIGHGATE AVE GENEVA ILLINOIS PRAIRIE PATH - GENEVA SPUR HAMPTON MEADOW ILLINOIS PRAIRIE PATH - GENEVA SPUR ST ST AVE AVE AVE AVE AVE AVE GROVE RIDGE ILLINOIS PRAIRIE PATH - GENEVA SPUR DR AVE PILSBURY DR GROVE AVE HAMPTON YALE ELITE COURSE HIGHLAKE RD DR ELMWOOD AVE FREMONT KNOLL RD OAKGR ARBOR BELLEVIEW HIGHLAND CLAREMONT INGALTON RD AVE OVE PILSBURY DR WESTERN DR UNIONWISCONSIN ELMWOOD ILLINOIS AVE PRAIRIE PATH - GENEVA BRANCH WENDALL AVE INDIAN AVERILL RD RD 078 079 WILLIAMS PACIFICCENTRALRR RR LAKE BLVD AVE GRAND GRAND LAKE BLVD CROSSING OAK 077 AVE BLVD ST 076 RD 075 PACIFIC PINE ST PRINCE 074 INDUSTRIAL AVE ST FAIRVIEW 073 ELLIOTT ST AVE TURNER WOODLAND AVE 071 072 080 RIDGELAND AVE AVE KRESS UNION AVE FREMONT ARBOR GARDEN NELTNOR YORK AVE SOPHIA YORK AVE AVE RD RR AVE VERGIE AVE PL INGALTON OAK KAUTZ DOWNS DR PACIFIC MC CONNELL AVE PLYMOUTH COOLIDGE GENEVA RD CT UNION DR OAKWOOD LONGEST DR ST AVE RD EST AVE WASHINGTON AVE NG ST ST WASHINGTON ST O L ST KNOLL LAKE MAIN SUMMIT AVE FULTON TATEST DR AVE CT WASHINGTON ST ST AURORA ST SUNSET GALENA HIGH BURR OAKS DR ORO TURNER MORNINGSIDE INDIAN COLFORD AVE UNION PACIFIC RR UNION PACIFIC RR COLFORD CENTER ST AVE HIGH 089EASTON UNION PACIFIC RR UNION PACIFIC RR WOOD CT UNION PACIFIC RR UNION PACIFIC RR RD 090 ST WOODB WOODLAND MAIN ST CHICAGO GENEVA SPUR PATH - ILLINOIS PRAIRIE STST MAIN ST BLVD CLARA ST GENEVA 087 CHARLES KRESS ST ST CHURCH RD ROOSEVELT RD RD AVE AVE AVE CT 086 HARRISON AVE 088 L DR 085 AVE SHERMAN 084 AVE HILLVIEW NELTNOR 083 WASHINGTON ST MILO ST CT 081 082 ST ALLEN AVE ST KNOL LAKE ST UNION CT AVE CT STPARKER SPENCER IAN CT PACIFIC CROSSING SUNSET WEGNER STERLING AVE RR ST VINE D WOOD HIGH ST NORRIS AVE ST JOLIET RD AVARD DR MORNINGSIDE IN HILLVIEW ST CHARLES CHURCH TOWN JENICE ST AVE ST GEORGE LAWRENCE AVE PRINCE CT COOLIDGE DU PAGE ST LAKE INNOVAT BARBER WILSON CLAYTON AVE ION DR LN PEARL CT ANN ST DR AVE JERI LN CONDE ST ROOSEVELT ANN ST AVE AVE RD CT RIDGELAND CONDE ST KAMMES DISCOVERY LAKE D BLAIR ST AVE ST ST BLAIR ST R ST ST ST BLAIR ST BLAIR FENTON CHURCHST VD ROGERS CHARLES WEGNER SUNSET L BLVD HIGH B BROADVIEW ST Y AVE ST ST RO E ST EAS STIMMEL ST M AVE HIGH AVE O ST STIMMEL ST LAKE AVE P LYMAN STIMMEL LOGY RD TO MORNINGSIDE DGE UNION N HELENA ST SHERMAN CHNO 100 N AVE PACIFIC ST FACTORY WOOD WEYRAUCH POMEROY W RR GATES ST POMEROY OLI ST NELTNOR RO ST POMEROY AVE B AVE O AV ST POMEROY BARBER BLAKELEY AVE DONALD E C LINCOLN AVE KENWOOD DR PARKSIDE LN T RD S WN BRO BATAVIA TE AVE DONALD BROWN ST PEARL ST BROWN BROWN ST BROWN ST RD CALVIN SUNSET HATHAWAY KNOLL 098 BLVD 099 WEGNER 096 097 HAZEL ST BOLLES AVE BOLLES AVE 095 AVE HAZEL ST AVE 094 AVE ST 093 MORNINGSIDE ST RD INDIAN 091 092 PKWY NELTNOR ROOS EVE RD AVE LESTER ST COOLIDGE CROSSING LT LESTER ST ST ST LESTER ST JOLIET AVE AVE AV FABYAN RD TOWN PARKSIDE LINCOLN KENWOOD LYMAN ST ST LESTER ST ST E ST BISHOP BARNES AVE DONALD BARNES AVE PRINCE ELIZABETH CHESNEY COMMERCE DR JOLIET GATES OAK SARANA EASTON MC FOREST AVE FOREST AVE FOREST AVE MC FOREST AVE WEYRAUCH PL WY FABYAN PKWY PK CT CENTRAL HAHN GLEN AVE BLVD GLEN AVE A BRENTWOOD DR P E ST A ROAD RL WISCONSIN AVE ST ST ST ST ST ENTERPRISE CIR BLVD NELTNOR FERMI RD ALLEN BARBER BLAKELY BISHOP ELIZABETH OAK GATES 110 NATIONAL 107 ST ODD DR 106 KRESSCREEK 108 105 TECHNOLOGY 104 DALE AVE 109 103 ACCELERATOR TOPSOIL DR ROOSEVELT 101 102 RD JOLIET AUGUSTA AVE J ENTERPRISE CIR RD ST LABORATORY BLVD BAUMAN TOWN ST ST ST CT OAK AVE NELTNOR WASHINGTON BISHOP ELIZABETH GATES KRESS HUBBARD CREEK RD f MAY ST N DAYTON AVEST LE AVE G AVE DR WYCLIFFE DR R DR DR ST OAK IVE SS E LDS ST SARANA R CHI NN JOLIET BROWNINGMICHAEL U CIRCLE MELOLANE G WAY RD CHILDS ST RRIAGE DR A JOY RD AC AVE ROAD ROOSEVELT CROSSING RD 120 119 DR 118 LORLYN 117 116 PRINCE 115 CT CT RD MORNINGSIDE PL 111 112 113 114 AP ETREE LN LN KNOLL WINDSOR CANTERBURY ORCHARD DR GARYS MILL RD INDIAN OAKS WHISPERING WILSON ST WILSON RD K P ROADWAY CITY OF WEST CHICAGO WILSON RD DR R . ESSWOOD DR IMPROVEMENT PROGRAM 2025-2029 1 inch = 1,000 feet BROOKWOOD WILSON ST ST BLVD A ROAD JOLIET NELTNOR PURNELL 130 RD -++-++-++--+ 129 DR MUNICIPAL BOUNDARY RAILROAD 127 128 121 122 123 124 OAK DR CENTRAL WALK WHITE OOD W E CANTIGNY FOREST PRESERVE INDEX GRID CT EOLA DG WISCONSIN CT E BATAVIARD PRINCETON WILLOW LN RD CT MAYFAIR 138 139 140 CTJUNIDAR PLUMCT MAP PREPARED BY: ADMINISTRATIVE SERVICES- WC GIS MAP PREPARED: MAY, 2003 2025 Project Area 2028 Project Area MAP UPDATED: AUGUST, 2011, AUGUST, 2013, FEBRUARY 2016, MARCH 2020 FOR FURTHER INFORMATION REGARDING THIS MAP PLEASE CONTACT THE CITY OF WEST CHICAGO, ADMINISTRATIVE SERVICES DIVISION 2026 Project Area 2029 Project Area 475 MAIN STREET, WEST CHICAGO, IL 60185 PHONE: (630) 293-2200 2027 Project Area Document Name: 2020_BOUNDARY_INDEX_FINAL Grant Funded Water Improvements ===== PDF PAGE 23 ===== [Extraction: embedded PDF text] BUDGET 108,400.00 49,100.00 39,000.00 24,200.00 40,300.00 136,000.00 5,900.00 1,331,900.00 792,200.00 222,100.00 665,000.00 85,600.00 1,683,100.00 - - 2,580,000.00 479,100.00 499,900.00 8,741,800.00 2,744,100.00 1,342,600.00 - - 8,356,700.00 479,100.00 503,300.00 4,998,200.00 499,900.00 18,923,900.00 934,000.00 1,564,700.00 - - 7,189,300.00 503,300.00 293,100.00 10,484,400.00 1,401,500.00 1,530,800.00 - - 4,186,000.00 293,100.00 827,700.00 207,000.00 8,446,100.00 883,900.00 1,547,800.00 - - - 626,100.00 178,900.00 3,236,700.00 TOTAL 49,832,900.00 PROJECT $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ GRANT 600,000.00 1,554,120.40 155,470.00 930,000.00 3,239,590.40 600,000.00 2,000,000.00 2,600,000.00 600,000.00 600,000.00 600,000.00 1,344,859.00 134,485.00 2,079,344.00 600,000.00 1,251,955.00 125,194.00 1,977,149.00 10,496,083.40 FUNDING APPROVED $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ SEWER FUND 214,900.00 71,700.00 29,000.00 80,000.00 395,600.00 163,500.00 11,000.00 312,200.00 486,700.00 30,000.00 21,000.00 252,300.00 303,300.00 40,000.00 18,000.00 199,400.00 103,500.00 360,900.00 30,000.00 18,000.00 89,500.00 137,500.00 COST 1,684,000.00 SEWER ASSOCIATED $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ WATER FUND 448,600.00 100,000.00 548,600.00 1,538,200.00 1,801,800.00 616,100.00 3,956,100.00 567,800.00 1,892,800.00 2,460,600.00 1,035,400.00 1,035,400.00 667,400.00 667,400.00 COST 8,668,100.00 WATER ASSOCIATED $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 561,600.00 561,600.00 217,300.00 217,300.00 406,900.00 406,900.00 353,500.00 353,500.00 347,200.00 347,200.00 1,886,500.00 LOCAL $ $ $ $ $ $ $ $ $ $ $ FUND COST MFT 108,400.00 49,100.00 39,000.00 24,200.00 40,300.00 136,000.00 5,900.00 720,500.00 222,100.00 665,000.00 85,600.00 1,092,500.00 2,400,000.00 5,588,600.00 1,114,300.00 1,114,300.00 1,136,800.00 1,136,800.00 1,159,300.00 724,200.00 207,000.00 2,090,500.00 1,182,600.00 536,600.00 178,900.00 1,898,100.00 STATE 11,828,300.00 ROADWAY $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - (4225) 479,100.00 499,900.00 979,000.00 479,100.00 503,300.00 982,400.00 503,300.00 293,100.00 796,400.00 293,100.00 293,100.00 ASSOCIATED FUNDOTHER CONTRACTUAL SERVICES $ $ $ $ $ $ $ $ $ $ $ $ 3,050,900.00$ PROJECTS CAPITAL (4807) STREET 668,400.00 668,400.00 1,042,400.00 6,242,700.00 4,382,100.00 499,900.00 12,167,100.00 336,200.00 5,044,200.00 5,380,400.00 326,100.00 3,986,600.00 4,312,700.00 186,500.00 186,500.00 22,715,100.00 IMPROVEMENTS $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTAL: Sewer TOTAL: Sewer TOTAL: Sewer TOTAL: TOTAL: TOTAL: Sewer Sewer Sewer Sewer Sewer Sewer Sewer (Bond) FUND Sewer Water, (Bond) (Bond) FUND Sewer Water, (Bond) (Bond) FUND Sewer Water, (Bond) Sewer FUND Sewer Sewer FUND MFT Water, MFT ALLOCATIONS MFT MFT MFT MFT MFT MFT MFT Water, MFT MFT MFT MFT Water, Capital Water, Capital Capital Water, Water, MFT, Capital MFT, (Bond), Capital Capital MFT, (Bond), Capital Capital MFT, (Bond), Capital MFT, MFT, MFT, 2025-2029 FUNDING Capital, Capital, Capital, Capital, Capital, Capital, Capital Capital Capital Match $2,220,172 Oak Match Local Local Est White & 35% (Total 30% Application Amount:$2,000,000.00 Awarded 629,857 Match) Sweetbay, Nagel $1,479,344; Est. (Future Grant Deering $1,377,149; Local Oak Ln Xing, Columbine (Total 30% Red Challen Funding: Ln Ingalton) (Pending James Ridgeland, Funding: Match Fenton ($758,000.00 Reimbursement Match) Grant Grant Crse, Dr, Matc Cranesbill, Grant Ln Application Meadowview 80% Reimbursemen Fenton Local Match) Blackhawk Alamance, Garden, - STP Snowberry, Local (STP Hickory, Reimbursement Dr, Reimbursement Dr, STP Local 80% Aster, Downs - Blackhawk Local Grant, Fenton 20% (Future Andrus Hampton D 70% $4,998,136.00) Virgie, 61F62 65% Dr, Howard, - Dr, Downs 20% Pioneer, Grant, Hemlock, Breamore, Cress, Application INDEX 61G26 Blackhawk , D (STP Projec Grant, Grant - Dr, Grant Ridge, (York, Project Howard, Culver, Construction $1,788,507; (Stp Meadowview - Application $2,069,014.40; Project Match (Arthur,(2025-2029) Estimate: Downs (Industrial Grant, (Western Spring Adella, (STP (STP Laurel Dr (STP (Future Dr, Reimbursement Howard, Local McCormic, (Arthur, - PROJECT Project (Industrial (Cost Engineering (Future Meadow (STP Cost Engineering Camden, (Western Project Oak, Cress, $2,580,000.00 Estimate: 70% Ct) Somerset, Engineering) Rehabilitation Estimate: Project Rehabilitation Cost Engineering Farm, Engineerin Engineering Engineering (Arthur, Overbeck, Post 61F55 Engineering (Industrial Ridge, Allen) (Western Engineering Rehabilitation - (Cost Engineering PH3 (Cost Engineering Spring Grant, Havens, JenicePROGRAM Engineering Streets Estimate: High Engineering Rehabilitation Streets Engineering Design Construction Construction View) Construction Construction Fieldcrest, - - - Trail, Improvements (STP - - Ave, Project Academy, And (Geneva, And Wyeth, (Cost Blanchard, Rehabilitation Pavement Construction Construction Golf Construction Construction (Including Sandcherry, Design Construction Construction - - Design Construction Construction - - Streets Design Construction Construction - - - - - - St. Construction Construction Main Dunham, - - - LAFO Project Project Project Construction Construction Main Trillium Access - - Project Project I I I II II II III III III - - Hillview Project Crossing, 1397) And & Project Crossing) Project Woods, (Campbell, Engineering Water 5041) (Whitney, Street Street Street Ave, Water Factory Grant) Grant) Phase Phase Phase Phase Phase Phase Phase Phase Phase (Bainbridge, (Devonport, (FAU Grant) Grant) Main Ginger, Installation Installation - - - - - - - - - Winston) St. Resurfacing Resurfacing (Prairie Prince St. LAFO St., Main Main Main (FAUIMPROVEMENT Widening (Persimmon, Resurfacing Resurfacing (STP (STP (STP (STP & & & (Wild Street Water (Heritage (Easton Blvd Blvd Signal Signal - Rehabilitation Project Project Project Project Project Project Project Project Project Bishop Hazel Subdivision Project Project Project Project Subdivision Reconstruction Construction Carolina, Charles, Subdivision Subdivision Street Street Avenue Crossing - Pomeroy Project Project Project Project Project And Area And Dr Area Subdivision Traffic Traffic Farm (St. Detention, St. Downtown Downtown Downtown Subdivision St. St., Lakes Subdivision Ave. Subdivision Ave Lakes Subdivision Estates Washington Forest Prince Technology Technology Conde Conde - - - - - - - Blvd Blvd HillsROADWAY 3817) Improvement Improvement Improvement Improvement Improvement Improvement Streets Improvement Improvement Improvement Brown York Allen Brown Brown Meadows Rehabilitation Trails Northwest - - Rehabilitation - Rehabilitation - Rehabilitation Crossing (Woodboro, Resurfacing Resurfacing - Rehabilitation Grove Chicago Chicago Chicago Resurfacing Resurfacing Chicago Project Project Project Project Project Project Project (FAU Reconstruction and Andrew's Streets Streets Streets Streets Streets Streets St. Various Prestonfield Various Hampton Prairie Streets Streets Streets Cornerstone West Cornerstone Forest Dr Technology Technology Avenue Avenue Project Road Road & & Roadway West Open Open Open Open Open Open Open West Project Roadway Project Roadway West West Project Roadway Drive Drive Project Roadway Prince of City DuPage DMS 10/29/2024 2019 2019 2021 2023 2023 2024 2024 CDBG Town Town IL-38 IL-38 2025 Nuclear Industrial Rebuild CDBG 2026 Industrial Industrial Industrial Rebuild Rebuild CDBG 2027 Industrial Industrial Industrial CDBG 2028 Industrial Industrial Atlantic Atlantic CDBG 2029 Arbor ArborRECOMMENDED AGENCY: BY: YEAR 2025 2026 2027 2028 2029 5-YEAR LOCAL COUNTY: EDITS DATE ===== PDF PAGE 24 ===== [Extraction: embedded PDF text] BUDGET 479,100.00 479,100.00 8,523,900.00 479,100.00 503,300.00 9,506,300.00 7,333,100.00 503,300.00 293,100.00 8,129,500.00 4,269,800.00 293,100.00 4,562,900.00 TOTAL 22,677,800.00 PROJECT $ $ $ $ $ $ $ $ $ $ $ $ $ $ - COST 312,200.00 312,200.00 252,300.00 252,300.00 199,400.00 199,400.00 763,900.00 FUND SEWER SEWER ASSOCIATED $ $ $ $ $ $ $ $ - - WATER FUND 1,801,800.00 1,801,800.00 1,892,800.00 1,892,800.00 COST 3,694,600.00 WATER ASSOCIATED $ $ $ $ $ $ $ 479,100.00 479,100.00 167,200.00 479,100.00 503,300.00 1,149,600.00 143,800.00 503,300.00 293,100.00 940,200.00 83,800.00 293,100.00 376,900.00 COST CONTRACTUAL 2,945,800.00 SERVICES (Bond) OTHER $ $ $ $ $ $ $ $ $ $ $ $ $ $ ROADWAY FUND - ASSOCIATED CAPITAL 6,242,700.00 6,242,700.00 5,044,200.00 5,044,200.00 3,986,600.00 3,986,600.00 STREETS 15,273,500.00 IMPROVEMENT $ $ $ $ $ $ $ $(2026-2028) TOTAL: Sewer TOTAL: Sewer TOTAL: Sewer TOTAL: (Bond) FUND Water, (Bond) (Bond) FUND Water, (Bond) (Bond) FUND Water, (Bond) FUND SUBTOTAL: ALLOCATIONSPROGRAM Capital (Bond), Capital Capital (Bond), Capital Capital (Bond), Capital FUNDING Capital Capital Capital IMPROVEMENT ROADWAY INDUSTRIAL Ln) Ln) Fenton Dr, Fenton Ln) Blackhawk) Downs Blackhawk) Dr, Fenton Dr) Dr, Howard, Downs Dr, INDEX Dr) Blackhawk) Dr, Howard, (Arthur, Downs (Western (Industrial Dr) (Arthur, PROJECT (Western Dr, (Industrial Howard, (Arthur, Engineering (Western Engineering (Industrial Engineering Engineering Engineering Engineering Design Construction Construction Design Construction Construction Design Construction Construction - - - - - - - - - I I I II II II III III III Phase Phase Phase Phase Phase Phase Phase Phase Phase - - - - - - - - - Project Project Project Project Project Project Project Project Project Improvement Improvement Improvement Improvement Improvement Improvement Improvement Improvement Improvement Chicago Streets Streets Streets Streets Streets Streets Streets Streets Streets West of City DuPage DMS 10/29/2024 Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial AGENCY: BY: YEAR 2025 2026 2027 2028 LOCAL COUNTY: EDITS DATE ===== PDF PAGE 25 ===== [Extraction: embedded PDF text] 140,000.00 11,200.00 80,000.00 25,000.00 15,000.00 225,000.00 45,000.00 275,000.00 27,500.00 15,000.00 587,500.00 120,000.00 24,000.00 20,000.00 100,000.00 15,000.00 279,000.00 225,000.00 45,000.00 200,000.00 15,000.00 485,000.00 200,000.00 15,000.00 215,000.00 BUDGET 1,000,000.00 1,271,200.00 2,250,200.00 TOTAL PROJECT $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ SUBTOTAL: SUBTOTAL: SUBTOTAL: SUBTOTAL: SUBTOTAL: TOTAL FY2029) - 08-34-53-4801(FY2025 NO. Replacements) Railing Services Services ACCOUNT Services - INDEX Ramp,IMPROVEMENTS Stairs, FUND Architectural Architectural PROJECT Architectural III Door, III III Replacement) Services & & II & Services II Main II Roof ServicesGROUNDS Phase Phase - Phase - - Architectural& PROJECTS (Exterior Windows, Architectural III Project Project III & Project II Project Project Architectural Project Doors, III & Phase - Phase II -BUILDING CAPITAL Main Improvement Replacement Replacement Replacement Improvement Project Phase Project Project Replacement - Project (Exterior Roof Roof Entrance Boiler Boiler& Floors Entrance & Project Project Garage Garage Main RTU Improvement Coating Main RTU Improvement Replacement Replacement Repairs South South Repairs Repairs Replacement Repairs Repairs Repairs Roof Roof Epoxy Chicago Improvement Masonry Department Door Improvement Masonry Department Division Division Department West Department Holder Holder Garage Garage Garage Holder of Police Police Hall Museum Museum City DuPage DMS 10/29/2024 Police Police City Miscellaneous Museum Museum Miscellaneous Miscellaneous Fleet Fleet Fleet Place Miscellaneous Streets Streets Place Miscellaneous Place Miscellaneous AGENCY: BY: YEAR 2025 2026 2027 2028 2029 LOCAL COUNTY: EDITS DATE ===== PDF PAGE 26 ===== [Extraction: embedded PDF text] Total 2,651,600 5,506,200 $8,157,800 9,251,000 26,373,000 481,100 159,900 $36,265,000 - 200,000 775,000 100,000 282,000 - - - - 750,000 1,306,500 175,000 300,000 - $3,888,500 2,837,700 1,676,000 1,000,000 60,000 400,000 60,000 1,365,400 - - - - - $7,399,100 55,000 26,500 5,000 300,000 500,000 41,500 $928,000 187,500 137,500 300,000 10,000 30,000 331,900 100,000 1,525,000 55,000 255,000 $2,931,900 $59,570,300 752,800 1,127,000 122,400 153,500 291,400 0 204,500 $2,651,600 Yr 5 - - - - - - - - - - - - - - - - - - - - $570,700 $1,709,000 $2,279,700 905,300 186,500 $1,091,800 40,000 155,000 20,000 50,000 150,000 287,500 35,000 60,000 $797,500 215,000 $215,000 11,000 5,500 1,000 60,000 100,000 9,700 $187,200 37,500 27,500 60,000 2,000 6,000 73,100 20,000 305,000 11,000 51,000 $593,100 $5,164,300 159,700 239,000 25,000 32,500 67,700 46,800 $570,700 2029PROPOSED - - - - - - - - - - - - - - - - - - - - $551,700 $1,713,900 $2,265,600 1,372,900 4,312,700 $5,685,600 40,000 155,000 20,000 50,000 150,000 273,800 35,000 60,000 $783,800 485,000 $485,000 11,000 5,400 1,000 60,000 100,000 9,000 $186,400 37,500 27,500 60,000 2,000 6,000 69,600 20,000 305,000 11,000 51,000 $589,600 $9,996,000 155,000 232,000 25,000 31,600 62,600 45,500 $551,700 2028PROPOSED - - - - - - - - - - - - - - - - - $533,500 $1,341,400 $1,874,900 2,166,400 7,273,200 120,300 $9,559,900 40,000 155,000 20,000 50,000 150,000 260,700 35,000 60,000 $770,700 279,000 1,000,000 682,700 $1,961,700 11,000 5,300 1,000 60,000 100,000 8,300 $185,600 37,500 27,500 60,000 2,000 6,000 66,200 20,000 305,000 11,000 51,000 $586,200 $14,939,000 150,400 225,200 25,000 30,700 57,900 44,300 $533,500 2027PROPOSED - - - - - - - - - - - - - - - $516,200 $741,900 $1,258,100 2,665,000 13,818,200 120,300 32,000 $16,635,500 40,000 155,000 20,000 50,000 150,000 248,200 35,000 60,000 $758,200 587,500 400,000 60,000 682,700 $1,730,200 11,000 5,200 1,000 60,000 100,000 7,600 $184,800 37,500 27,500 60,000 2,000 6,000 63,000 20,000 305,000 11,000 51,000 $583,000 $21,149,800 146,000 218,600 25,000 29,900 53,600 43,100 $516,200 2026PROPOSED 479,500 - $479,500 2,141,400 782,400 240,500 127,900 $3,292,200 - 40,000 155,000 20,000 82,000 - - - - 150,000 236,300 35,000 60,000 - $778,300 1,271,200 1,676,000 - 60,000 - - - - - - - $3,007,200 11,000 5,100 1,000 60,000 100,000 6,900 $184,000 37,500 27,500 60,000 2,000 6,000 60,000 20,000 305,000 11,000 51,000 $580,000 $8,321,200 141,700 212,200 22,400 28,800 49,600 - 24,800 $479,500 2025PROPOSED $443,500 - $443,500 1,207,100 1,374,100 - - $2,581,200 30,000 37,900 110,000 20,000 50,000 - - 595,800 11,100 135,300 163,000 25,000 42,700 22,100 $1,242,900 455,900 - - - - - - - - - 463,900 20,000 $939,800 7,400 5,000 100 67,400 100,000 6,200 $186,100 40,000 42,100 20,000 - 5,000 30,000 10,000 215,000 11,000 45,000 $418,100 $5,811,600 138,900 194,500 14,100 26,300 41,500 - 28,200 $443,500 2024ESTIMATED 464,100 - $464,100 1,300,700 1,967,800 - 27,200 $3,295,700 . 50,000 40,000 125,000 20,000 50,000 - - 623,000 - 150,000 225,000 35,000 42,500 40,000 $1,400,500 635,000 600,000 67,500 450,000 67,500 - - 25,000 - 765,000 20,000 $2,630,000 - 4,900 1,000 60,000 100,000 6,200 $172,100 37,500 27,500 60,000 2,000 3,000 71,800 20,000 405,000 11,000 51,000 $688,800 $8,651,200 137,500 206,000 21,700 28,100 46,700 - 24,100 $464,100 2024BUDGETED 446,508 $446,508 1,271,550 2,725,713 - - $3,997,263 50,000 39,275 117,490 19,990 49,914 11,650 47,614 412 22,709 156,631 102,498 24,149 44,720 79,296 $766,347 423,870 - - - - - - - 25,000 2,827 1,468,217 - $1,919,914 4,137 4,591 - 61,845 100,000 4,796 $175,369 49,870 36,529 47,632 - 3,309 15,869 23,897 213,888 10,675 44,524 $446,193 $7,751,594 134,011 199,491 12,095 26,110 43,727 - 31,075 $446,508 2023ACTUAL Sub-Total Sub-Total Sub-Total Sub-Total Sub-Total Sub-Total TOTAL Projects (4843) EXPENDITURE Capital (4858) Engineering Oversee Services (4845) Share (4856) to (4823) (4863) Design - Share City- (4857) Engineering (4801) (4810) (4864) Engineer City Engineering Ave (4888) of - 62N33 Program Engineering (4872) Repairs Project (4822) Engineering and Holder) (4226) (4227) Installation (4886) (4818) Square/North Engineering Costs 62G63 IDOT- (4842) Design Construction Construction (4870) - - - (Place Signal Building (4819) (4643) Barricades IDOT Contractual Project Replacement (FYE) (4854) - & Program (4871) (4225) - Andrews Design Construction Construction Reconstruction Contractual (4869) Architectural (4841) Remediation Insurance (4671) Reclamite - - - - Insurance Traffic (4672) (4375) - St Trimmings Lot Streets Insurance - (4609) - (4612) (4849) Gutter (4807) (4611) Municipal Improvement Materials and Cold Hot (4817) Tank Tank Tank Blvd Street and Replacement Replacement Material - Replacement - Design Construction Program Striping Services - - EXPENDITURES Program and Treatment Rebate Renovation Signal Improvements Medicare Fuel Fuel Fuel Parking Major Sirens IMPROVEMENTS Improvement (4200) Sign Maintenance Maintenance Repair & PROPERTIES Materials Facility (4868) (4610) Corridor Tax MFT Maintenance Materials Street (4100) Curb Culvert Culvert Culvert Materials Benefits, (4101) Payments Rejuvenation EXPENDITURES (4670) Street Materials Materials & Cutting IMPROVEMENTS Traffic (4300) HVAC Campus Campus Removals ROW Technology Administrative-Salary Operational-Salary Overtime FICA Health/Dental/Life Unemployment IMRF Washington Ground Ground Ground Signal Improvements Light Light Division Patch Paint Sewer Filling Contractual Fees Notices Debt Corridor Fees Smart & Warning Salt Road Road Road Replacement Insecticidal Storage Hall Hall Hall Main W Control Patch Patch CAPITAL EXPENDITIURES Personnel, Bond STREET Other Street IL-38 IL-64 OTHER Crack Contractual Sidewalk Sidewalk Pavement IL-38 Klein Klein Klein Forestry Right-Of-Way Right-Of-Way Tree EAB MUNICIPAL Miscellaneous 119 Street Above Above Above City City Early Salt 200 City MISCELLANEOUS Legal Audit Legal Utility/Sales Menards Insurance PREVIOUS Traffic Street Street Street Street Ice Storm Rock Bit Bit 4020 4027 4029 4050 4053 4054 4056 ===== PDF PAGE 27 ===== [Extraction: embedded PDF text] - 108,400 49,100 39,000 24,200 40,300 136,000 5,900 720,500 222,100 665,000 85,600 724,200 207,000 536,600 178,900 650,000 225,000 Total 7,572,000 2,400,000 13,714,800 $14,589,800 Yr 5 - - - - - - - - - - - - - - - 1,529,800 536,600 178,900 2,245,300 130,000 45,000 $2,420,300 2029PROPOSED - - - - - - - - - - - - - - - 1,512,800 724,200 207,000 2,444,000 130,000 45,000 $2,619,000 2028PROPOSED - - - - - - - - - - - - - - - - - 1,543,700 1,543,700 130,000 45,000 $1,718,700 2027PROPOSED - - - - - - - - - - - - - - - - - 1,331,600 1,331,600 130,000 45,000 $1,506,600 2026PROPOSED - - - - - 108,400 49,100 39,000 24,200 40,300 136,000 5,900 1,654,100 720,500 222,100 2,400,000 665,000 85,600 6,150,200 130,000 45,000 $6,325,200 2025PROPOSED - - - - - - - - - - - - - 5,600 108,800 70,800 2,346,000 815,000 3,346,200 120,800 40,000 $3,507,000 2024ESTIMATED - - - - - . 108,400 49,100 39,000 151,600 126,000 76,700 2,350,000 928,900 666,200 222,100 485,000 38,000 5,241,000 130,000 45,000 $5,416,000 2024PROPOSED - - - - - - - - - - - - - - - - 121,280 45,230 166,510 118,479 38,567 $323,556 2023 ESTIMATE 2,325,928.00 2,069,014.40 1,788,507.00 2,580,000.00 664,639.64 9,428,089.04ACTUAL COST $ $ $ $ $ $ Sub-Total TOTAL Total: Match) Match) Local Local 35% EXPENDITURE 30% Project) Open $1,479,344; $1,377,149; Project) (2023 Open Funding: Project) Funding: (2023 Grant Open Grant Reimbursement) Reimbursement) STP Reimbursement) Project) Match) Project) (2024 STP 80% 65% 70% Open Local Open 20% Grant, Grant Grant (2019 (2024 $2,069,014.40; $1,788,507; (STP (STP (STP Grant, Reimbursement) Match Reimbursement) Match) Match) $2,580,000.00) Estimate: Project) (STP 80% Engineering Estimate: 70% Local Local - Local (Cost Engineering Engineering (Cost Open Cost Engineering Project) 20% Grant, 30% Grant, Estimate: 61F62 (2021 - (STP Open (STP (Cost Construction Construction Grant, - - Project Grant, Ave) Construction Construction Match Construction Construction Construction Construction - - - - - - (2019 (STP (STP Project Project Arbor Local to Match - Cost Engineering Cost Engineering Installation Installation Grant) Grant) Grant) Grant) Installation Rd Local - 61G26- Signal Signal (STP (STP (STP (STP Signal Project (Town (4807) 20-00085-00-RS 20-00085-00-RS Reconstruction Reconstruction Construction Construction Project Project Project Project - 61F55 Project Project Project Dr Traffic - Construction- Construction- Dr Traffic Traffic - (FYE) Items Project Blvd Blvd Blvd Resurfacing Rehabilitation Resurfacing Resurfacing Rd Northwest Northwest Reconstruction Resurfacing Resurfacing Resurfacing Resurfacing Resurfacing Resurfacing Reconstruction Resurfacing Resurfacing Blvd Blvd Reconstruction St Resurfacing and and Rd Reconstruction Reconstruction Dr Dr Drive Drive Drive Technology Technology Technology Maintenance (4204) (4210)Disposal Roadway Street Street Crossing Ave Improvement Avenue Avenue Avenue Rd Rd Road & & & EXPENDITURES MFT EXPENDITURES Street Washington Forest Prince Technology Technology Conde Conde Harvester Annual Town Town Nuclear L-38 L-38 Atlantic Atlantic Arbor Arbor General Electric Refuse PROJECTS Town Atlantic Arbor Nuclear L-38 ===== PDF PAGE 28 ===== [Extraction: embedded PDF text] Awarded $679,998.50 Match, scope scope Local increased increased for for Notes 20% STP need need Project Project, Project Project theto theto Open Open Open Open due due - - - - 2025 2025 FY FY to to projected projected projected projected deferred deferred amount Project amount amount amount Actual Open Actual Actual Actual Project Project Actual 25.92 0.80 - (16,429.42) 125,171.63 (9,999.70) 27,253.83 47,620.00 22,947.58 2,163.40 20,001.50 67,890.00 56,382.55 100,000.00 250,000.00 693,028.09 Comparison Budgeted $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - - Total 3,794,229.42 803,728.37 135,999.70 595,746.17 152,380.00 15,860.00 33,788.19 6,547.18 102,052.42 19,974.08 49,999.20 37,836.60 29,998.50 432,110.00 743,617.45 6,953,867.28 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ MFT 2,340,968.36 803,728.37 135,999.70 3,280,696.43 $ $ $ $ Actual Sewer 41,593.40 432,110.00 473,703.40 $ $ $ Water 37,357.28 743,617.45 780,974.73 $ $ $ Capital 1,374,310.38 595,746.17 152,380.00 15,860.00 33,788.19 6,547.18 102,052.42 19,974.08 49,999.20 37,836.60 29,998.50 2,418,492.72 $ $ $ $ $ $ $ $ $ $ $ $ - - Total 3,819,800.57 940,368.23 135,999.70 622,932.62 160,380.00 15,860.00 33,788.19 6,547.18 110,000.00 19,974.08 49,999.20 39,616.00 29,998.50 432,110.00 747,117.45 7,164,491.72 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ MFT 2,345,944.23 940,368.23 135,999.70 3,422,312.16 $ $ $ $ Sewer 49,521.73 432,110.00 481,631.73 Awarded $ $ $ Water 49,967.28 747,117.45 797,084.73 $ $ $ Capital 1,374,367.33 622,932.62 160,380.00 15,860.00 33,788.19 6,547.18 110,000.00 19,974.08 49,999.20 39,616.00 29,998.50 2,463,463.10 $ $ $ $ $ $ $ $ $ $ $ $ Total 3,777,800.00 928,900.00 126,000.00 623,000.00 200,000.00 30,000.00 30,000.00 40,000.00 125,000.00 20,000.00 50,000.00 40,000.00 50,000.00 500,000.00 800,000.00 100,000.00 250,000.00 7,690,700.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ MFT 2,350,000.00 928,900.00 126,000.00 3,404,900.00 $ $ $ $ Sewer 50,000.00 500,000.00 550,000.00 Budgeted $ $ $ Water 50,000.00 800,000.00 850,000.00 $ $ $ Capital 1,327,800.00 623,000.00 200,000.00 30,000.00 30,000.00 40,000.00 125,000.00 20,000.00 50,000.00 40,000.00 50,000.00 100,000.00 250,000.00 2,885,800.00Summary $ $ $ $ $ $ $ $ $ $ $ $ $ $ Project Project Project Total: Program Project ProjectOutlay Project Insulation Replacement Project Replacement Project Name Project Project Project Project Garage Door Replacement BoilerCapital & Replacement Rehabilitation Project Gutter Replacement Maintenance Replacement RTU Streets Program - Gates Overhead Reconstruction Rehabilitation andMajor Rehabilitation Tower Replacement Resurfacing Door Program- Culvert Lake Rejuvenation Marking Curb Cutting Sewer Water Roof Division Division Street Department 10-29-2024 Filling Road Roadway Road Garage2024 GrandFY Harvester 2024 Conde Klein 135 Streets Streets Fleet Sidewalk Sidewalk Pavement Pavement Crack Sanitary Fremont Museum Police Updated: