===== PDF PAGE 39 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: 7H. Resolution No. 24-R-0089 — Amendment No. 1 — Kluber, Inc. — Phase II & Phase III Professional Architectural Services for the | COMMITTEE AGENDA DATE: December 5, 2024 2025 Police Station HVAC Improvements Project in an Amount | COUNCIL AGENDA DATE: December 16, 2024 Not to Exceed $73,175.00 for a Revised Contract Amount of $83,025.00 STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE ITEM SUMMARY: The professional architectural services for the 2025 HVAC Improvements Project at the Police Station located at 325 Spencer Street, as denoted in the location map, are separated into three separate phases. Phase | services include the study and the assessment of the existing mechanical system; Phase II services include the mechanical design and project procurement; and Phase Ill services include the construction administration phase. The scope of the Project includes replacement of the two rooftop units (RTU), replacement of two boilers, variable air volume (VAV) system upgrades, and necessary electrical upgrades at PD. Both the RTUs and boilers were last replaced as part of the 1991 renovation project at the Station. The RTUs have exceeded their expected median service life of 20 years, and the boilers have exceeded their expected median service life of 22 years. The proposed Project is anticipated to be completed in fall 2025, dependent on equipment procurement lead time. In October 2024, Kluber, Inc. successfully performed the Phase | component, the initial study and the assessment, for the mechanical equipment (e.g., RTU, boilers, electrical apparatus) at the Station, which was approved under the spending authority of the Director of Public Works for an amount not to exceed $9,850.00. The study recommended that the RTU and boilers be replaced. Furthermore, it was also recommended to replace the VAV box pneumatic controls with direct digital controls (DDC) that interface with the existing building automation. DDC upgrade would provide more accurate control and improve the overall environment inside the Station. Kluber, Inc.’s proposal for Phase I] and Phase Ill professional architectural services amounts to $73,175.00 for a revised contract amount of $83,025.00, which equates to approximately 7.0% of the architect’s overall project estimate of $1,191,610.00. FY 2025 budget under Capital Projects Fund Account No. 08-34-53-4801 includes $80,000.00 for Phase II & III professional architectural services for the project. Kluber, Inc. has previously provided Phase II and Phase II professional architectural services for various facilities projects in FY 2023 and FY 2024, including the insulation and roof replacement projects at the Streets Division Garage, interior renovation at the Fleet Garage, and exterior renovations at the Metra Depot, which were all completed successfully. Staff recommends approval of Kluber, Inc.’s proposal for Phase II and Phase III professional architectural services amounts to $73,175.00 for the 2025 Police Department HVAC Improvements Project. ACTIONS PROPOSED: Approve Resolution No. 24-R-0089 authorizing the Mayor to execute an Amendment No. 1 for professional architectural services contract with Kluber, Inc. for Phase Il - Design and Phase IIl — Construction Administration for the 2025 Police Department HVAC Improvements Project in the amount not to exceed $73,175.00 for a revised contract amount of $83,025.00. ===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.