===== PDF PAGE 1 ===== [Extraction: embedded PDF text] Historical Preservation Commission Tuesday, January 28, 2025 - 6:00 p.m. West Chicago City Hall – Council Chambers 475 Main Street West Chicago, IL 60185 AGENDA 1. Call to Order, Roll Call and Establishment of a Quorum 2. Public Comment 3. Certificate of Appropriateness Review A. C.O.A. 25-01 – 209 E Washington Street – Roof & Siding Color B. C.O.A. 25-02 – 116 Main Street – Roof C. C.O.A. 25-03 – 100 Main Street – Signage D. C.O.A. 25-04 – 115 Main Street – Roof Handrail E. C.O.A. 25-05 – 431 E Washington Street – Radon Mitigation System 4. Preliminary Review 5. Historic District/Landmark Updates 6. Approval of the draft October 29, 2024 Meeting Minutes 7. Other Business A. Nomination of candidates for Vice Chair B. Election of Vice Chair C. Review and Approval of Annual Report to the City Council D. Approval of 2025 Historical Preservation Commission Meeting Schedule E. Six-month review of all unreleased executive session minutes 8. Adjournment – The next regularly scheduled meeting is February 25, 2025 CC: Historical Preservation Commission Members Alderman Beebe, City Council Liaison to Historical Preservation Commission Mayor & City Council Michael Guttman, City Administrator Tom Dabareiner, Director of Community Development Kelley Chrisse, Business and Community Relations Director Sara Phalen, City Museum Director News Media ===== PDF PAGE 2 ===== [Extraction: embedded PDF text] DRAFT WEST CHICAGO HISTORICAL PRESERVATION COMMISSION MEETING September 24, 2024 Members Present: City Staff: Keith Letsche, Chairman John Sterrett, City Planner Reverend Bill Andrews Richard Vigsnes Guests: Wendy Christman Allan Gilbert Luis Campos Members Absent: Michael Krog SueEllen Edwards 1. Call to Order, Roll Call, and Establishment of a Quorum The meeting was called to order by Chairman Letsche at 6:00p.m. Roll call found Chairman Letsche, and Commissioners Vigsnes, Christman, and Andrews present. Commissioner Edwards was excused. With four members present, a quorum was established. 2. Public Comment - None 3. Certificate of Appropriateness (COA) Review A. C.O.A. 24-18 – 216 Main Street – Awning Mr. Sterrett stated that Allan Gilbert, owner of The Bunker Bar and Grill at 216 Main Street in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness to install an awning across the front of the tenant space. The awning will be a black Sunbrella and will run the entire length of the tenant space, approximately 50 linear feet. The awning will contain the logo of the business on the front portion of the awning with the street address to be printed on the valance. The proposed awning is consistent with previous awnings that have recently been installed on Main Street. Two existing signs on the building will be permanently removed including a projecting sign with the logo of the business and a flush-mounted “Budweiser” sign. The subject building is Greek Revival constructed in in the 1850s. According to the Historical District Property Survey, the building is contributing to the district but is not a candidate for local landmark status. After a brief discussion, Commissioner Andrews made a motion, seconded by Commissioner Christman, to approve the COA application as presented. With a voice vote of all ayes the motion carried. B. C.O.A. 24-19 – 179-183 W Washington Street – Wood Restoration of Entryway ===== PDF PAGE 3 ===== [Extraction: embedded PDF text] Mr. Sterrett stated that Michael Krog of the Atcherson Association, owner of 179-183 W Washington Street in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness to restore existing wood of the entryway to the building as well as replace minor molding accents. The wood to the entryway door has fallen into disrepair and the applicant intends to sand, re-stain, and apply a protecting polyurethane coating. The subject building is a Classic Revival constructed in 1908. According to the Historical District Property Survey, the building is contributing to the district and is a candidate for local landmark status. After a brief discussion, Commissioner Christman made a motion, seconded by Commissioner Andrews, to approve the COA application as presented. With a voice vote of all ayes the motion carried. C. C.O.A. 24-20 – 111 Turner Court – Roof Shingle Replacement Mr. Sterrett stated that Luis Campos, owner of 111 Turner Court (110 Main Street) in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness to replace the existing roof shingles located on the overhang above the entrance to the building. The roof shingles have fallen into disrepair and need replacement. The existing roof shingles are 3-tab and are a type of black color. Mr. Campos is proposing to replace them with Atlas Pinnacle Pristine architectural shingles in Pristine Black. No other changes to the exterior of the building are proposed. The subject building is a Victorian constructed in the 1850s and remodeled Modern in the 1950s. According to the Historical District Property Survey, the building is contributing to the district but is not a candidate for local landmark status. After a brief discussion, Commissioner Vigsnes made a motion, seconded by Commissioner Christman, to approve the COA application as presented. With a voice vote of all ayes the motion carried. D. C.O.A. 24-21 – 201 W Washington Street – Driveway Repair/Replacement Mr. Sterrett stated that Miguel Gonzalez, owner of 201 W Washington Street in the Turner Junction Historic District, is requesting approval to repair and replace the existing asphalt driveway at the property. The existing structure on the property is used as a single-family dwelling. The driveway will be constructed with at least 2.5 inches of asphalt over at least 6 inches of gravel. The footprint and location of the driveway will not change. No work is proposed to the building and no other site improvements are proposed. Please see attached for more details. The subject building is Italianate with elements of Gothic Revival constructed in 1867. According to the Historical District Property Survey, the building is contributing to the district and is a candidate for local landmark status. ===== PDF PAGE 4 ===== [Extraction: embedded PDF text] After a brief discussion, Chairman Malina made a motion, seconded by Commissioner Vigsnes, to approve the COA application as presented. With a voice vote of all ayes the motion carried. E. C.O.A. 24-22 – 100 Main Street – Siding Replacement Mr. Sterrett stated that Efren Toledo, owner of 100 Main Street in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness for previous work performed on the building that included removal and replacement of the existing vertical wood siding. The siding that was removed was due to water entering the building between the cedar shingled roof overhang and the bottom of the brick near the top of the building. The wood siding was removed, caulk was added, and wood siding matching the same style and color was placed back on the building. No other changes were made to the building. The subject building is Art Moderne constructed in the 1930s. According to the Historical District Property Survey, the building is contributing to the district but is not a candidate for local landmark status. After a brief discussion, Commissioner Christman made a motion, seconded by Commissioner Andrews, to approve the COA application as presented. With a voice vote of all ayes the motion carried. 4. Preliminary Review 209 E Washington Street – The property owner of 209 E Washington Street was present to discuss a proposed roof project on the house at 209 E Washington Street because of damage. The Commission was generally acceptable of the proposal pending that an official COA application being approved at the next meeting for the proposed work. 5. Historic District/Landmark Updates None 6. Approval of September 24, 2024 Meeting Minutes Commissioner Vigsnes made a motion, seconded by Commissioner Andrews, to approve the September 24, 2024 meeting minutes. With a voice vote of all ayes the motion carried. 7. Other Business Nomination of Vice Chair of the Historical Preservation Commission – Tabled to next meeting. 8. Adjournment Commissioner Vigsnes made a motion, seconded by Commissioner Christman, to adjourn the meeting. With a voice vote of all ayes the motion carried and the Historical Preservation Commission, at 6:53 p.m., adjourned. Respectfully submitted by John H. Sterrett, City Planner ===== PDF PAGE 5 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Roof Replacement and Siding Color AGENDA ITEM NUMBER: 3 A.209 E Washington Street Mudassir Siddiqui COMMISSION AGENDA DATE: 01-28-25C.O.A. # 25-01 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: Mudassir Siddiqui, owner of the home located at 209 E Washington Street in the East Washington Street Historic District, is requesting approval of a Certificate of Appropriateness for a previous roof replacement on the home that was granted by the Commission under preliminary review at the last meeting. The installed roof shingles are Timberline HDZ architectural shingles with a pewter gray col- or to match the previous shingles. The applicant is also seeking approval to change the color of the existing horizontal siding of the home to an Off-White shade. The existing color of the siding is a yel- low hue around most of the home with a white colored vertical siding on the rear of the house. Please see scope of work and photos for more details. The building is a 1900 Queen Anne and according to the East Washington street Historic District sur- vey the building is contributing to the District though is not indicated as a candidate for local landmark status. ACTION PROPOSED: Consideration of previous roof shingle replacement and proposed siding color change at 209 E Wash- ington Street. ===== PDF PAGE 6 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 7 ===== [Extraction: embedded PDF text] **Scope of Work: Roof Replacement** **Property Address**: 209 E Washington St, West Chicago, IL **Overview**: The roof replacement project for 209 E Washington St will adhere strictly to the InternaƟonal ResidenƟal Code (IRC) for One and Two Dwelling ProperƟes as adopted by the City of West Chicago. This ensures compliance with current building standards and guarantees the durability and safety of the roofing system. All work will be conducted by licensed roofing professionals and will follow the manufacturer’s guidelines for installaƟon. --- **Roofing Requirements and SpecificaƟons**: 1. **Underlayment and Valley Lining**: - The roofing underlayment will include a minimum of No. 15 or 30-pound felt laid parallel to the eaves. - Valley linings will be installed in strict accordance with the manufacturer’s installaƟon instrucƟons to ensure waterƟght integrity and extend the roof’s lifespan. 2. **Ice and Water Shield ProtecƟon**: - Ice and water shield will be used in place of standard underlayment along the roof edge. - This protecƟon will extend from the eave’s edge to a minimum of 24 inches inside the exterior wall line of the building, providing an addiƟonal barrier against ice and water infiltraƟon. 3. **Drip Edge InstallaƟon**: - Drip edges will be installed following the manufacturer's specificaƟons to protect roof edges from water seepage and ensure that water is directed away from the fascia and underlying roof structure. 4. **Materials and Shingles**: ===== PDF PAGE 8 ===== [Extraction: embedded PDF text] - High-quality, durable asphalt shingles will be used, installed as per the manufacturer’s guidelines and in compliance with IRC standards. hƩps://www.homedepot.com/p/GAF-Timberline-HDZ-Pewter-Gray-Algae-Resistant-Laminated-High- DefiniƟon-Shingles-33-33-sq-Ō-per-Bundle-0487552/309755248#overlay - Shingle colors, textures, and styles will be selected to complement the historic nature of the property while meeƟng all code requirements. 5. **City of West Chicago Requirements**: - Although the City of West Chicago does not mandate inspecƟons for roof work, all installaƟons will adhere to local building codes. - The roofing contractor will provide documentaƟon verifying compliance with all specificaƟons and manufacturer guidelines. **Work Schedule**: - The project start and compleƟon dates will be scheduled to ensure minimal disrupƟon to the property. **Site Management and Safety**: - The roofing contractor will maintain a clean and secure job site. - All necessary safety measures will be in place, including harnessing, scaffolding, and protecƟve coverings. **Waste Removal**: - All waste materials, including old shingles and debris, will be removed from the site upon compleƟon. The property will be leŌ in clean, orderly condiƟon. **Final DocumentaƟon**: - Upon project compleƟon, the contractor will provide documentaƟon for all work completed, including manufacturer warranƟes, proof of material compliance, and a final project report detailing the work executed. ===== PDF PAGE 9 ===== [Extraction: embedded PDF text] This scope of work ensures the new roof installaƟon meets all required safety and performance standards while preserving the aestheƟc and structural integrity of this historic property. Timberline HDZ Pewter Gray Algae Resistant Laminated High DefiniƟon Shingles (33.33 sq. Ō. per Bundle) Here is the Sample Color ===== PDF PAGE 10 ===== [Extraction: OCR (rendered-page OCR)] | i eres J % eet . ? ’ = ke Fr A ‘ fi | =—| . IE =a | —s a / —= "a =. >t ee 3 ‘tik } fi j a2 a] Te // : _ = ns a pile § u | : ' = aj] cS ; SJ ih \ “| ‘ f La 4 rm = Rs ; r. >‘ = sone ‘ : CR a - Vie ¥ | ped aa / we & | “é ===== PDF PAGE 11 ===== [Extraction: OCR (rendered-page OCR)] 4 —__.—_— LoyerLock” Technology A if j ir } e } rke Na ] Arex . Vura Grip Adhesive = LoyerLock Technology r tt ry ) , la) € su ’ e ===== PDF PAGE 12 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Roof Replacement AGENDA ITEM NUMBER: 3 B. 116 Main Street Oscar Munoz COMMISSION AGENDA DATE: 01-28-25 C.O.A. # 25-02 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: Oscar Munoz, owner of 116 Main Street in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness for a roof repair needed from a fire that occurred in the building in 2024. The roof repair was deemed an emergency repair to protect the integrity of the interior of the building and the work was performed in November of last year. The roof was removed down to the plywood decking for inspection of any additional damage and installation of new plywood where needed. The existing shingles were replaced with Timberline HDZ architectural shingles with a match- ing color. Please see photos and spec sheet for more details. The building is a 1900 Late Victorian. According to the Turner-Junction Historic District survey the building is non-contributing to the District and is not a candidate for local landmark status. ACTION PROPOSED: Consideration of the roof replacement at 116 Main Street. ===== PDF PAGE 13 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 14 ===== [Extraction: OCR (rendered-page OCR)] TECHNICIAN ROOFING 2 LLC 1480 BERNARD DRIVE UNIT E ADDISON, IL 60101 PHONE (630) 495-0409 FAX (630) 495-0411 ROOF REPLACEMENT PROPOSAL PREPARED BY: Calixto Perez Project Address: 116 Main Street 10. iL. 12, 13, SCOPE OF WORK CONDUCT A PRE-JOB MEETING WITH ALL APPROPRIATE PERSONNEL TO REVIEW SCHEDULING, SPECIFIC SAFETY REQUIREMENTS AND JOB-SITE LOGISTICS. LIFT ROOFING MATERIAL ONTO THE ROOF. TRI WILL SPREAD OUT THE MATERIAL TO ENSURE THE WEIGHT WILL BE EVENLY DISTRIBUTED OVER THE ENTIRE SURFACE OF THE ROOF. TRI SERVICEMEN WILL REMOVE AND DISPOSE OF ALL EXISTING ROOFING OF ENTIRE BUILDING APPROXIMATELY 16 SQUARES (ONE LAYER) TRI WILL CAREFULLY REMOVE THE FRONT LOW ROOF WITH PROPER COVERING BECAUSE OF THE ASBESTOS THAT IS INSTALLED. (TOTAL OF 1 SQUARE) TECHNICIAN SERVICEMEN WILL INSPECT PLYWOOD DECK. IF ANY IS FOUND ROTTEN OR DETERIORATED TRI WILL REPLACE AT AN ADDITIONAL COST OF $75 PER 4X8 SHEET. FRONT ROOF LOW WILL INSTALL NEW PLYWOOD BEFORE INSTALL NEW METAL ROOF TRI SERVICEMEN WILL INSTALL 36” WIDE ICE & WATER SHIELD UNDERLAYMENT AT ALL BOTTOM EDGES OF ROOF TRI SERVICEMEN WILL INSTALL SYNTHETIC SHINGLING FELT OVER ENTIRE ROOF’S SURFACE. TRI SERVICEMEN WILL INSTALL GAF TIMBERLINE HDZ® ARCHITECTURAL SHINGLE OVER ENTIRE ROOF. SHINGLES WILL BE NAILED WITH 1-1/4 GALVANIZED ROOFING NAILS. TRI SERVICEMEN WILL INSTALL THREE MUSHROOM VENTS WHERE NEEDED FOR VENTILATION PURPOSES TRI SERVICEMEN WILL INSTALL ONE 5” SOIL STACK TRI SERVICEMEN WILL INSTALL NEW RIDGE CAP APPROXIMATELY 41 LINEAL FEET ON THE PEAK OF THE ROOF WHERE NEEDED TRI SERVICEMEN WILL INSTALL PROPER COUNTER FLASHING WHERE NEEDED APPROXIMATELY 30 LINEAL FEET FLAT ROOF ON SHINGLE ROOF AREA - TRI WILL INSTALL NEW 1” INSULATION OVER THE DECK AND APPLY EPDM FULLY ADHERE OVER THE NEW INSULATION NOTE, ANY ADDITIONAL WORK NEEDED TO COMPLETE THE ROOF SYSTEM AND NOT STATED IN THIS PROPOSAL WILL NOTIFY THE CUSTOMER BEFORE CONTINUING THE WORK, CHARGE WILL BE BASE ON TIME MATERIAL UPON COMPLETION, ALL GROUNDS WILL BE ROLLED WITH A HEAVY-DUTY MAGNET TR) WILL CLEAN THE AREA AROUND THE HOUSE ALL THE DEBRIS WILL BE REMOVED BY A DUMPSTER/TRAILER PROVIDED BY IRI Investment Cost ... $18,198.00 PAYMENT TERMS: 50°o DUE UPON LOADING OF MATERIALS AND 50% DUE UPON COMPLETION AFTER THE COMPLETION OF YOUR ROOF SYSTEM, TRI WILL ISSUE A FIVE-YEAR LABOR WARRANTY FOR SHINGLE ROOF. MANUFACTURE WARRANTY ON SHINGLES WOULD BE REGISTER WITH PROVIDER Be (LL Jones | CUSTOMER SYGNA October 9, 2024 ===== PDF PAGE 15 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Flush-Mounted Signage AGENDA ITEM NUMBER: 3 C. 100 Main Street Deisy Torres – American Family Insurance COMMISSION AGENDA DATE: 01-28-25 C.O.A. # 25-03 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: Deisy Torres of American Family Insurance, tenant at 100 Main Street, Suite B in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness to install a flush-mounted panel sign on the side of the north side of the building facing West Washington Street. The sign, which will advertise the tenant’s business, will be 24 square feet, which complies with the maximum 92 square feet of signage permitted on this portion of the building. The sign will be attached to the brick with 3/8” Tapcon screws. Please see photos and spec sheet for more details. The subject building is Art Moderne constructed in the 1930s. According to the Historical District Property Survey, the building is contributing to the district but is not a candidate for local landmark sta- tus. ACTION PROPOSED: Consideration of the installation of a flush-mounted panel sign at 100 Main Street. ===== PDF PAGE 16 ===== [Extraction: OCR (rendered-page OCR)] et oy ele Nae es eer oe Rae ===== PDF PAGE 17 ===== [Extraction: OCR (rendered-page OCR)] maxi XIRA RKING ===== PDF PAGE 18 ===== [Extraction: OCR (rendered-page OCR)] la MAXMEAL SIGN © MOUNTED WITH 3/6" TAPCON SCREWS Customer: DEISY TORRES Company: ‘Address: ‘AMERICAN FAMILY INSURANCE City: State/ZIP: Phone: Ne AMERICAN FAMILY J INSURANCE § DEISY TORRES Office: 331-200-6146 Drop in for a free quote SIDE MOUNTED VIEW SHOWING SCREWES MOUNTED ‘AMERICAN FAMILY Pinsurance ES 148 Job No.: Date: 11/8/2024 Order Date: Salesperson: 408 684in x 464.466in $ $0.00 Comments: Z ===== PDF PAGE 19 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Roof Guardrail AGENDA ITEM NUMBER: 3 D.115 Main Street Juan Torres COMMISSION AGENDA DATE: 01-28-25C.O.A. # 25-04 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: Juan Torres of JMK Exteriors, Inc., representing the owner of 115 Main Street in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness to install a guardrail along the edge of the low roof on the rear of the building. No guardrail currently exists on this low roof and the applicant intends to install an aluminum ornamental rail with a brown color. Please see photos and spec sheet for more details. The building is an 1898 Italianate Victorian. According to the Turner-Junction Historic District survey the building is contributing to the District and is a candidate for local landmark status. ACTION PROPOSED: Consideration of the guardrail on the low roof on the rear of the building at 115 Main Street. ===== PDF PAGE 20 ===== [Extraction: OCR (rendered-page OCR)] | | | 7 Be | = | 1/7 : | 1! ~ | 7 4g : a | ] ‘ en ARS WY | \ | is Aan fi | Sa ===== PDF PAGE 21 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 22 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Radon Mitigation System AGENDA ITEM NUMBER: 3 E.431 E Washington Street David Lundeen COMMISSION AGENDA DATE: 01-28-25C.O.A. # 25-05 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: David Lundeen, owner of the home located at 431 E Washington Street in the East Washington Street Historic District, is requesting approval of a Certificate of Appropriateness to install a radon mitigation system in the home. Although the system will be installed primarily inside the home, an AMG Eagle Extreme duct fan with a 3-inch PVC pipe for venting will be installed on the exterior of the home at the northwest corner, away from public view. The vent pipe will run up the side of the house and extend 12 inches past the roof line. Please see photos and spec sheet for more details. The building is an 1907 Queen Anne and according to the East Washington street Historic District survey the building is significant to the District and is a candidate for local landmark status. ACTION PROPOSED: Consideration of radon mitigation system with exterior duct fan and vent piping at 431 E Washington Street. ===== PDF PAGE 23 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 24 ===== [Extraction: OCR (rendered-page OCR)] sy CLEAN AIR RADON SYSTEMS, INC. Date Clean Air Radon Systems QU OTE Oct 7, 2024 (RNM2017208 Quote Number Attention: J. Schan Willis Dean Westrom QU-1514 2805 Wheatland Ct NAPERVILLE IL 60564 USA Scope of work Encapsulate and seal gravel crawl space. Install AMG Eagle Extreme high suction, high air flow inline duct fan to side of house and vent. Install soil gas collection point into basement floor. Install secondary soil gas collection point into encapsulated crawl space membrane. Patch open areas in basement floor. Description Amount USD Sub Slab Suction Radon Mitigation system 1,600.00 Small Gravel crawl space encapsulation 500.00 Additional suction point crawl space 200.00 Subtotal 2,300.00 TOTAL TAX 0.00 TOTAL USD 2,300.00 Terms Scope of Work: Sub-Slab,Block Wall, Crawl-space or Combination. . Cut a 3 to 4-inch hole in slab, disposal of approx 5 gal of aggregate to create a suction point. . Place a 3-inch schedule 40 rated PVC pipe just below service, run up the wall, through the rim joints. Registered Office: Attention: J. Schan Willis, 2805 Wheatland Ct, Naperville, IL, 60564, United States. ===== PDF PAGE 25 ===== [Extraction: OCR (rendered-page OCR)] . Attach a radon fan 2 feet off grade, run pipe up wall, go through, or around soffit, 12 inches above roof line as close to ridge as possible, if on roof, pipe will be booted. Sticker will mark pipe on roof. Fan will be wired with shut off switch or plug within reach, in exterior rated box and conduit. Pipe will be sealed at all penetrations through walls, floor,soffit and roof with proper sealant. All accessible Cracks, joints,holes will be sealed. Sump pump will be sealed according to |.E.M.A guidelines so system can run most effective. You will be given all warranties and guarantees in writing. | will arrive on agreed date at said time, job will be finished same day and everything cleaned up. Operating costs of system is approximately $40.00 per year with a 5-year warranty on Radon fan, Lifetime on structural, barring any man made or natural damages to system. Scope of work for New construction homes: Install and activate Radon fan in attic of home Install all 1.E.M.A. approved and mandated labels, tags, and U-tube manometer. Install |.E.M.A. approved sump pit cover Caulk all visible and accessible cracks and penetrations below grade. Expressed Warranties: . Furnished and installed Festa fan with 5- year warranty. . Lifetime warranty of piping system, unless damage by someone or natural causes. . System is guaranteed to reach a Radon level of 3.9 pCi/ or lower unless any area of home in which additional suction points or encapsulation would be necessary is inaccessible . Warranties and guarantees transfer with building. . Estimated cost to operate system is approximately $40.00 per year. Thank you for Choosing Clean Air Radon Systems for your Radon mitigation needs. As a token of our thanks, we have attached a promotional code for 5% off an Ecosense continuous Radon monitor! Thank you kindly * Due to the age of this home. Clean Air Radon Systems Cannot fully guarantee that initial mitigation techniques will reduce levels below 4 pCi/L. Clean Air Radon Systems will assist customer in an unofficial post mitigation test to gage effectiveness. If levels are averaging below 4 then no further mitigation needs to be done, and it will be advised to order official post mitigation test at that time. If initial test results are still high, then additional soil gas collection points will need to be installed at additional costs. Registered Office: Attention: J. Schan Willis, 2805 Wheatland Ct, Naperville, IL, 60564, United States. ===== PDF PAGE 26 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 27 ===== [Extraction: embedded PDF text] 2024 ANNUAL REPORT TO THE CITY COUNCIL In accordance with Section 2-282 of the Code of Ordinances, the Historical Preservation Commission hereby submits this annual report to the City Council summarizing its activities from 2024. The Commission was established in 1990 to provide a mechanism to identify and preserve the special distinctive historic characteristics of West Chicago and foster and encourage preservation, restoration, and historically sensitive rehabilitation of properties and streetscapes. During 2024, the Commission reviewed 22 applications for a Certificate of Appropriateness (COA). Nineteen COA applications were for building improvements for structures located in the Turner Junction Historic District (TJHD), and 7 of those COA applications were for signage. A notable project in the TJHD that started in 2023 and completed in 2024 was the renovation of 200 Main Street, a historically contributing building the TJHD owned by the City. Three COA applications were received for residential properties located in the East Washington Street Historic District. No COA applications were received for any of the existing landmarked properties. All COA applications reviewed in 2024 received approval. The Commission held 8 regularly scheduled meetings in 2024. Regularly scheduled meetings are held the fourth Tuesday of every month. The chair of the Commission vacated his seat on the Commission in September. This left a vacancy on the Commission in addition to one existing vacancy. The Vice Chair of the Commission was then appointed as chair by the Mayor. Both vacant seats on the Commission were filled in December to bring the total number of commissioners back to seven. There were no applications received or reviewed this year for sites to be added to the National Register of Historic Places. The Commission continues to monitor the building at 132 Main Street as a site on the National Register of Historic Places. The building is the former Turner Town Hall from 1884 and is owned by the City and houses the West Chicago City Museum. The City provided financial assistance via the City’s Downtown Façade Improvement Program to one property located in the TJHD. The grant was for 216 Main Street for The Bunker Bar and Grill for an awning with signage. This project received COA approval from the Commission. The grant, although typically funded by the City’s Downtown Tax Increment Financing (TIF) district, was funded by the General Fund due to the TIF fund not having enough increment in 2024. Lastly, the City’s annual Certified Local Government report will be submitted to the Illinois Historic Preservation Agency office once the Agency opens their reporting portal. ___________________________________ Keith Letsche, Chairman ===== PDF PAGE 28 ===== [Extraction: embedded PDF text] City of West Chicago Historical Preservation Commission 2025 Meeting Schedule Tuesday, January 28, 2025 The Historical Preservation Commission meets the fourth Tuesday of each month. Tuesday, February 25, 2025 Meetings occur at 6:00 p.m. Tuesday, March 25, 2025 Meetings will take place in the Council Tuesday, April 22, 2025 Chambers of West Chicago City Hall – 475 Street, unless otherwise indicated. Tuesday, May 27, 2025 Packets are sent electronically to Tuesday, June 24, 2025 commissioners and are posted on the City website the Thursday prior to a meeting. Tuesday, July 22, 2025 Notices for cancelled meetings will be sent Tuesday, August 26, 2025 as soon as practical. Tuesday, September 23, 2025 The Historical Preservation Commission requires at least 4 commissioners to be Tuesday, October 28, 2025 present to constitute a quorum. Tuesday, November 25, 2025 Members are expected to attend all regularly scheduled meetings. If a member is not able No Meeting Scheduled in December to attend a meeting, the member should notify City staff as soon as practical. For questions, please contact John Sterrett, City Planner, at 630-293-2247 or at jsterrett@westchicago.org. \\city_fs\users\comdev\Historical Preservation Commission\Meeting Dates\Meetings Dates - 2025.docx