===== PDF PAGE 12 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Roof Replacement AGENDA ITEM NUMBER: 3 B. 116 Main Street Oscar Munoz COMMISSION AGENDA DATE: 01-28-25 C.O.A. # 25-02 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: Oscar Munoz, owner of 116 Main Street in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness for a roof repair needed from a fire that occurred in the building in 2024. The roof repair was deemed an emergency repair to protect the integrity of the interior of the building and the work was performed in November of last year. The roof was removed down to the plywood decking for inspection of any additional damage and installation of new plywood where needed. The existing shingles were replaced with Timberline HDZ architectural shingles with a match- ing color. Please see photos and spec sheet for more details. The building is a 1900 Late Victorian. According to the Turner-Junction Historic District survey the building is non-contributing to the District and is not a candidate for local landmark status. ACTION PROPOSED: Consideration of the roof replacement at 116 Main Street. ===== PDF PAGE 13 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 14 ===== [Extraction: OCR (rendered-page OCR)] TECHNICIAN ROOFING 2 LLC 1480 BERNARD DRIVE UNIT E ADDISON, IL 60101 PHONE (630) 495-0409 FAX (630) 495-0411 ROOF REPLACEMENT PROPOSAL PREPARED BY: Calixto Perez Project Address: 116 Main Street 10. iL. 12, 13, SCOPE OF WORK CONDUCT A PRE-JOB MEETING WITH ALL APPROPRIATE PERSONNEL TO REVIEW SCHEDULING, SPECIFIC SAFETY REQUIREMENTS AND JOB-SITE LOGISTICS. LIFT ROOFING MATERIAL ONTO THE ROOF. TRI WILL SPREAD OUT THE MATERIAL TO ENSURE THE WEIGHT WILL BE EVENLY DISTRIBUTED OVER THE ENTIRE SURFACE OF THE ROOF. TRI SERVICEMEN WILL REMOVE AND DISPOSE OF ALL EXISTING ROOFING OF ENTIRE BUILDING APPROXIMATELY 16 SQUARES (ONE LAYER) TRI WILL CAREFULLY REMOVE THE FRONT LOW ROOF WITH PROPER COVERING BECAUSE OF THE ASBESTOS THAT IS INSTALLED. (TOTAL OF 1 SQUARE) TECHNICIAN SERVICEMEN WILL INSPECT PLYWOOD DECK. IF ANY IS FOUND ROTTEN OR DETERIORATED TRI WILL REPLACE AT AN ADDITIONAL COST OF $75 PER 4X8 SHEET. FRONT ROOF LOW WILL INSTALL NEW PLYWOOD BEFORE INSTALL NEW METAL ROOF TRI SERVICEMEN WILL INSTALL 36” WIDE ICE & WATER SHIELD UNDERLAYMENT AT ALL BOTTOM EDGES OF ROOF TRI SERVICEMEN WILL INSTALL SYNTHETIC SHINGLING FELT OVER ENTIRE ROOF’S SURFACE. TRI SERVICEMEN WILL INSTALL GAF TIMBERLINE HDZ® ARCHITECTURAL SHINGLE OVER ENTIRE ROOF. SHINGLES WILL BE NAILED WITH 1-1/4 GALVANIZED ROOFING NAILS. TRI SERVICEMEN WILL INSTALL THREE MUSHROOM VENTS WHERE NEEDED FOR VENTILATION PURPOSES TRI SERVICEMEN WILL INSTALL ONE 5” SOIL STACK TRI SERVICEMEN WILL INSTALL NEW RIDGE CAP APPROXIMATELY 41 LINEAL FEET ON THE PEAK OF THE ROOF WHERE NEEDED TRI SERVICEMEN WILL INSTALL PROPER COUNTER FLASHING WHERE NEEDED APPROXIMATELY 30 LINEAL FEET FLAT ROOF ON SHINGLE ROOF AREA - TRI WILL INSTALL NEW 1” INSULATION OVER THE DECK AND APPLY EPDM FULLY ADHERE OVER THE NEW INSULATION NOTE, ANY ADDITIONAL WORK NEEDED TO COMPLETE THE ROOF SYSTEM AND NOT STATED IN THIS PROPOSAL WILL NOTIFY THE CUSTOMER BEFORE CONTINUING THE WORK, CHARGE WILL BE BASE ON TIME MATERIAL UPON COMPLETION, ALL GROUNDS WILL BE ROLLED WITH A HEAVY-DUTY MAGNET TR) WILL CLEAN THE AREA AROUND THE HOUSE ALL THE DEBRIS WILL BE REMOVED BY A DUMPSTER/TRAILER PROVIDED BY IRI Investment Cost ... $18,198.00 PAYMENT TERMS: 50°o DUE UPON LOADING OF MATERIALS AND 50% DUE UPON COMPLETION AFTER THE COMPLETION OF YOUR ROOF SYSTEM, TRI WILL ISSUE A FIVE-YEAR LABOR WARRANTY FOR SHINGLE ROOF. MANUFACTURE WARRANTY ON SHINGLES WOULD BE REGISTER WITH PROVIDER Be (LL Jones | CUSTOMER SYGNA October 9, 2024