===== PDF PAGE 74 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: < t:+. c_ Resolution No. 25-R-0036 - Contract Award - Strada Construction Co. for the 2025 Concrete Maintenance COMMITTEE AGENDA DATE: May 1, 2025 Program in an Amount Not to Exceed $100,000.00. COUNCIL AGENDA DATE: May 19, 2025 STAFF REVIEW: Mehul T. Patel, P.E., CFM, Director of Public Works SIGNATURE._________ _ APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE._________ _ ITEM SUMMARY: The 2025 Concrete Maintenance Program will consist of intermittent removal and replacement of sidewalks, curb and gutters, and concrete alleyway pavement at various locations throughout the City. This annual Program also includes the construction of an aggregate base course for ground stabilization, inlet adjustments, detectable warning installation, tree root pruning, and restoration items, including hot- mix-asphalt and concrete driveway replacements, pavement patching, and sodding. The request for bids was advertised in the Daily Herald and on an online bidding platform, QuestCDN, on April 1, 2025, with the bid opening on April 22, 2025. The bid results are as follows: Bidder Bid Amount Overall Rank Strada Construction Co. $66,869.00 1 Schroeder & Schroeder, Inc. $94,530.00 2 Alliance Contractors, Inc. $146,900.00 3 Engineer's Estimate $99,391.45 NIA Strada Construction Co. (Strada) of Addison, Illinois, submitted the lowest responsible bid of $66,869.00, which is $32,522.45 or approximately 33% lower than the engineer's estimated cost of $99,391.45. Strada satisfactorily completed the City's 2024 Sidewalk and Curb Maintenance Program, which was of a similar size and scope. Additionally, Strada is a registered prequalified contractor with the Illinois Department of Transportation. The FY 2025 budget includes $155,000.00 under Account No. 08-34-53-4863 for the Program. However, $55,000.00 was reallocated to cover the overage in the 2025 Bishop Street and Brown Street Water Main and Streets Rehabilitation Project, leaving $100,000.00 budgeted for the 2025 Concrete Maintenance Program. There are more sidewalk, curb, and concrete alleyway repairs throughout the City that can be included in this Program, but staff elected to bid a conservative amount of quantity to ensure the bid does not exceed the remaining budget. To take advantage of the favorable bid pricing and to address additional sidewalk, curb, and concrete alleyway repairs throughout the City, staff is recommending awarding the contract to Strada Construction Co. of Addison, Illinois, for the 2025 Concrete Maintenance Program, for an amount not to exceed $100,000.00. ACTIONS PROPOSED: Approve Resolution No. 25-R-0036 authorizing the Mayor to execute a construction contract with Strada ===== PDF PAGE 75 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO Construction Co. of Addison, Illinois, for the 2025 Concrete Maintenance Program in an amount not to exceed $100,000.00 (Bid Amount $66,869.00). COMMITTEE RECOMMENDATION: ===== PDF PAGE 76 ===== [Extraction: embedded PDF text] RESOLUTION NO. 25-R-0036 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A CONSTRUCTION CONTRACT WITH STRADA CONSTRUCTION CO. OF ADDISON, ILLINOIS, FOR THE 2025 CONCRETE MAINTENANCE PROGRAM IN AN AMOUNT NOT TO EXCEED $100,000.00 BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a construction contract with Strada Construction Co. of Addison, Illinois, for the 2025 Concrete Maintenance Program in an amount not to exceed $100,000.00 (using the unit pricing in Strada's lowest bid amount of $66,869.00), in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 19th day of May 2025. AYES: NAYES: ABSTAIN: ABSENT: Daniel Bovey, Mayor ATTEST: Valeria Perez, Executive Office Manager ===== PDF PAGE 77 ===== [Extraction: embedded PDF text] NI C LN O TY I DR N WILT X IN OOD CT CIR HILL S HONEY O DR ROUTE TR EW HONEYSUCKLE RBURY LN F WISCON 006 IL RD S CT WAY LAK T YAL WARWICK RD 009 CANTE PACIFIC WAYNE RO 010 J W 008 A LN MES RR 005 AY E OOD 004 C 003 007 HILL CT 002 W POWIS MUNGER ERSET LN BAINBRIDGE BLVD KIDWEL L RA 001 LN DR FORSYTHIA T CT BRIAR CT GS D RD OM S R KIN S SMITH O RD W CIR GATE DR CHA F SMITH RD BERKSHIRE CT E RI PEPPER CT R EN E SMITH RD CHALL G CT E DR CT ALAMANCE T JENLOR N QUEEN A KIN A HAVENS TRL DR DR DR AVE KING ELIZABETH W ELIZABETH DR DR T BLVD S RD CT AUBREY RD LN RD RD CTBLACK JAMES EANOR KING KING WY LN ETHDR L BRAEMORE DR AUGUSTA DORAL ADE UNION WOODLAND PRAIRIELN E SPICER WIANT AVARD KAELIN NELTNOR LIA CTWILLIAM KING LN DR DR RD PACIFIC S SDR LN LAKE ST ANDREWS RICHARD LN LEHMAN 017 LN 013 020 ANDRUS CT 018 019 RD WHITNEY RD K VIEW BLANCHARD I RR POWIS N CULVER AMDEN CT G ILLINOIS R 015 AY IC C 016 LN 014 BLVD HENANDOAH LINDS RD GOLF HARD AVE KLEIN BLVD CT RD AVE 011 AVE LN OV DR RD WOODL ST ER D RD AND TRL S KING WHITNEY RT PRAIRIE OAKS NO CT U Q RNHA JAMES 012 R BEC N BA UEEN MANSFIE K A T N IO LD RD O NPORT L KAELIN LOCUST NORRIS ST NEAVE FAIR N KENWOOD NELTNOR LN CT PATH AVAR N N BAINBRIDGE SMITH CAMLN - RCHILD POWIS CT DAVE C PACI CT WIANT DEN FAI LAKE DR R KING FI DR STOCKBERRY LEHMAN RD E C ELEANOR RD WOODLAND EDWARD LN E LIES RD R HENRY NG LN ELGIN K R LN KI LN BARNHART LES EBOW KING RG ST CT TR BTANAGER LN O CHAR DR SUDBURY DR INDIA AVE RD GE FOXFIELD N AVE AVE AVE OBO BUNT W BRANCH R RD BLAC CTING HI K D WAY KING TRL T AELIN H E A K RD W K IL NORRIS LOCUST SANDPIPER LN LAK KLEIN WOODLAND KENWOOD ME AD PARTRIDGE DR TRL RD KE POWISUNION PHEASANT DR SMITH LN RD MEADOW PHEASANT RD 029 XFIELD CT PACIFIC LN BEECH ST SHADY 030 BLVD 028 E LN FLOWER E T C 026 LAKEVIEWCT 027 RR 025 RD 024 023 WIANT 022 WILD 021 CHICKAD AVE MULBERRY DR RD NELTNOR KNOLL OAKS RD RD RD OAK KNOLL RD UNION OAK ARBORLN FAIR ELM POWIS HICKORY SHAGBA AVE MULBERRY R WOODLAND CT PACIFIC K DR CT DR DIVERSEY AVE RR ELM MAPLE NORRIS NORTH AVE E MAIN ST DIVERSEY PKWY EAGL E WYNN AVE WYNN AVE OAK LN C RIDG CT WYNN AVE MULBERRYDR RD RD RD ST. ANDREWS NORTH AVE CT DR I NDIANWOOD LN RD DR TER DR KLEIN KEIL CT AVE KAUTZ ILLINOIS ST. CHARLES WAY BLVD OLD WAYNE CT 38TH PL JUNIPER CIR ARAPAHO CHEROKEE DR KENWOOD AVE LESLIE TIMBERLINE PRAIRIE VALEWOOD LAKEWOOD CUYAHOGA CHIPPEWA LN 040 039 MO 035 POPLAR RN POPLARPL 037 PATH- 038 ILLINOIS AVE 034 FRANCISICANTRENTNELTNOR 033 ELGIN CAPE AVE 036 031 032 CAPE AVE NORTHAVE TERESALN WAY INGSIDE TOWER RD E AVE WISCONSIN BRANCH DR AVE CAP RD CENTRAL NORTHAVE LAKEWOOD POWIS CT CT POWIS OHIO AVE DR RD DR RD DE KLEIN ANDERSEN REQUE ST CHARLES RD DUPAGE ATLANTIC CUL DR RD SAC POST RD OAKCIR NELTNOR FIELDCREST DR NORTHAVE FL KAUTZ MEADOWV CROSSING CIR LAURELLN BLVD IEW DR 050 IE R OAK VALEWOOD WO HERIT O 049 046 D DR MEADOWVIEW XING RD AGEWOODS STERN AVE 045 PRAI 044 DR POST 043 CT SHINGLE OAK DR 048 042 CRE S 047 SN ST 041 AVIATION DR O UNION OAKS VALE RD W WHITE LN DR TC DR EETBAY L MARSHVIEW CROSSING OAK E LN WBERRY PACIFIC LN A HE ANCIENT LN N MLOCK LN SWENSON AVE RR SANDCHERRY G PRINCE PRAIRIE K DUPAGE ARTHUR DR OA CT T WAYNEWOOD DR ILLINOIS C RED INTERNATIONAL DR DR GLEN RD PRAIRIE THOMASSASSAFRASDR MAR PATH- C INTERNATIONAL DR E HAHNDORF ST COMMERCE DR WINSTON ST LL ELGIN A KINGS DR NORTHWEST AVE CT L HILL DR N ESS WO RD CT KINGS ILLINOIS PRAIRIE PATH BRANCH 058 R SPRING DR T SP C 059 C RING CIR KI CTODSIDE LN LN CT ENTERPRISE CRESS NUCLEAR CR LN NGS AMBER AN POWIS TR TALIE ROSEWOOD DR GAVIN CT HOWARD DE DR LILLIAN I A ESBILL CR DR RD LN R 060 LN DR DR N D ODSI TONI ST WO TARA LN NGA LN DR LT 056 E KAUTZ D 055 LAK TRILLIUM N 057 054 COLUMBINE ON E LN OWNE HERRYWOOD N RIDGEWOOD LN 053 S T HARVESTER RD HARVESTER RD R N H Y 052 W D R S C ID ASTER ILL ACO 051 BONNIE ST D WOO D IL CAROLINA ATLANTIC E L AVE DR LE N W I DR WILD BLACKHAWK LO R ILLIN L D OIS WOO W DE OS A R E INDIAN GINGER C LL R H LN DWOOD KNOLL VE PRAIRIE R NELTNOR RD E O A LN C Y DR BLVD E PATH- N K OODSI OR K RID ELG DR LON G G IN OAK ARB E W W RD AINSLE CTOOD HAWTHORNE LN BRANCH JACOBCT HAWTHORNE LN HAWTHORNE LN HAWTHORNE LN UNION ACADEMY LN RD CT BAYBERRY PEACHTREE LN HELEN AVE RD DR RD DR CT AVE PACIFIC AVE RD RD CT BLVD DR INDIAN RR RD RISCH HILLCREST HICKORY LN OR CT N HICKORY LN CAMBELL CROSSING QUEEN BLOSSOM CRABAPPLE T WILLIAMS FARM KNOLL PILSEN CT EL RD KRESS MAC N RD APPLEGATE DEERING INDUSTRIAL PRINCE INGALTON CHERRY PINE AVE PIONEER HONEYSUCKLE KAUTZ BERKSHIRE RD CT MCCORMICK LN PLUMTREE LN AVE 069 070 068 LEE RD LEE RD AVE LEE RD 067 066 WISCONSIN 065 AVE RD 064 LEE RD DR GENEVA DR 063 062 BLVD LANE JAMES AVE JAMES AVE DUMHAM DR CENTRAL CT RIDGELAND 061 RD ARBOR WILLIAMS HIGH RIDGE ALENA DR RAY AVE RAY AVE COURSE NOR-OAKS DR RAY AVE NELTNOR DR AVE CT NATIONAL RD NATIONAL ST PERSIMMON PILSBURY DR NATIONAL ST OAK HIGHGATE AVE GENEVA ILLINOIS PRAIRIE PATH - GENEVA SPUR HAMPTON MEADOW ILLINOIS PRAIRIE PATH - GENEVA SPUR ST ST AVE AVE AVE AVE AVE AVE GROVE RIDGE ILLINOIS PRAIRIE PATH - GENEVA SPUR DR GROVE AVE HAMP AVE PILSBURY DR RD TON YALE COURSE HIGHLAKE WIS DR AVE ELMWOOD C FREMONT O UN KNOLL N RD OAKGR IO ARBOR BELLEVIEW HIGHLAND CLAREMONT ELITE INGALTON S WESTERN DR I N PILSBURY RD AVE OVE N ELMWOOD P DR ILLINOIS C AVE A E WENDALL AVE PRAIRIE PATH - GENEVA BRANCH C I N INDIAN AVERILL RD T FI R C RD 078 079 AL WILLIAMS RR RR LAKE BLVD AVE GRAND GRAND LAKE BLVD CROSSING OAK 077 AVE BLVD ST 076 RD 075 PACIFIC PINE ST PRINCE 074 INDUSTRIAL AVE ST FAIRVIEW 073 ELLIOTT ST AVE TURNER WOODLAND AVE 071 072 080 RIDGELAND AVE AVE KRESS UNION AVE FREMONT ARBOR GARDEN NELTNOR YORK AVE SOPHIA YORK AVE AVE RD RR AVE VERGIE AVE PL INGALTON OAK KAUTZ DOWNS DR PACIFIC MC CONNELL AVE PLYMOUTH COOLIDGE GENEVA RD CT UNION DR OAKWOOD LONGEST DR ST AVE RD EST AVE WASHINGTON AVE NG ST ST WASHINGTON ST O MAI ST KNOLL LAKE N SUMMIT AVE FULTON STATEST L DR AVE CT WASHINGTON TUR ST AURORA ST N SUNSET STGALENA HIGH BURR OAKS DR R ORO ER MORNINGSIDE INDIAN COLFORD AVE UNION PACIFIC RR UNION PACIFIC RR COLFORD CENTE ST AVE HIGH 089EASTON UNION PACIFIC RR UNION PACIFIC RR WOOD CT UNION PACIFIC RR UNION PACIFIC RR RD 090 ST WOODB WOODLAND MAIN ST CHICAGO GENEVA SPUR PATH - ILLINOIS PRAIRIE STST MAIN ST BLVD CLARA ST GENEVA 087 CHARLES KRESS ST ST CHURCH RD ROOSEVELT RD RD AVE AVE AVE CT 086 HARRISON AVE 088 L DR 085 AVE SHERMAN 084 AVE HILLVIEW NELTNOR 083 WASHINGTON ST MILO ST CT 081 082 ST ALLEN AVE ST KNOL LAKE ST UNION CT AVE CT STPARKER SPENCER IAN CT PACIFIC CROSSING SUNSET WEGNER STERLING AVE RR ST VINE D WOOD HIGH ST NORRIS AVE ST JOLIET RD AVARD DR MORNINGSIDE IN HILLVIEW ST CHARLES CHURCH TOWN JENICE ST AVE ST GEORGE LAWRENCE AVE PRINCE CT COOLIDGE DU PAGE ST LAKE INNOVAT BARBER WILSON CLAYTON AVE ION DR LN PEARL CT ANN ST DR AVE JERI LN CONDE ST ROOSEVELT ANN ST AVE AVE RD CT RIDGELAND CONDE ST KAMMES DISCOVERY LAKE D BLAIR ST AVE ST ST BLAIR ST R ST ST ST BLAIR ST BLAIR FENTON CHURCHST VD ROGERS CHARLES WEGNER SUNSET L BLVD HIGH B BROADVIEW ST Y AVE ST ST RO E ST EAS STIMMEL ST M AVE HIGH AVE O ST STIMMEL ST LAKE AVE P LYMAN STIMMEL R D TO MORNINGSIDE DGE UNION N HELENA ST SHERMAN CHNOLOGY 100 PACI N FI AVE C ST FACTORY WOOD WEYRAUCH POMEROY W RR GATES ST POMEROY OLI ST NELTNOR RO ST POMEROY AVE B AVE O AV ST POMEROY BARBER BLAKELEY AVE DONALD E C LINCOLN AVE KENWOOD DR PARKSIDE LN T RD S WN BRO BATAVIA TE AVE DONALD BROWN ST PEARL ST BROWN BROWN ST BROWN ST RD CALVIN SUNSET HATHAWAY KNOLL 098 BLVD 099 WEGNER 096 097 HAZEL ST BOLLES AVE BOLLES AVE 095 AVE HAZEL ST AVE 094 AVE ST 093 MORNINGSIDE ST RD INDIAN 091 092 PKWY NELTNOR ROOS EVE RD AVE LESTER ST COOLIDGE CROSSING LT LESTER ST ST ST LESTER ST JOLIET AVE AVE AV FABYAN RD TOWN PARKSIDE LINCOLN KENWOOD LYMAN ST ST LESTER ST ST E ST BISHOP BARNES AVE DONALD BARNES AVE PRINCE ELIZABETH CHESNEY COMMERCE DR JOLIET GATES OAK SARANA EASTON MC FOREST AVE FOREST AVE FOREST AVE MC FOREST AVE WEYRAUCH PL WY FABYAN PKWYNPK CT CENTRAL HAHN GLEN AVE BLVD GLEN AVE A BRENTWOOD DR P D E ST A ROA RL WISCONSIN AVE ST ST ST ST ST ENTERPRISE CIR BLVD NELTNOR FE RMI RD ALLEN BARBER BLAKELY BISHOP ELIZABETH OAK GATES 110 NATIONAL 107 ST DALE AVE DR 106 KRESSCREEK 108 105 TECHNOLOGY 104 109 103 ACCELERATOR TOPSOIL DR ROOSEVELT 101 102 RD JOLIET AUGUSTA AVE ENTERPRISE CIR RD ST LABORATORY BLVD BAUMAN TOWN ST ST ST CT OAK AVE NELTNOR WASHINGTON BISHOP ELIZABETH GATES KRESS HUBBARD CREEK RD MAY ST N DAYTON AVEST LE AVE G AVE DR WYCLIFFE DR R DR DR ST OAK IVE SS E H LDS ST AEL BROMWICN SARANA R CHI NN IN JOLIET U CIRCLE MELOLANE G GWAY RD CHILDS ST RRI AG E DR A JOY RD AC AVE ROAD ROOSEVELT CROSSING RD 120 119 DR 118 LORLYN 117 116 PRINCE 115 CT CT RD MORNINGSIDE PL 111 112 113 114 AP ETREE LN LN KNOLL WINDSOR CANTERBURY ORCHARD DR GARYS MILL RD INDIAN OAKS WHISPERING WILSON ST PI 2025 CONCRETE DR CITY OF WEST CHICAGO KR . ESSWOOD DR MAINTENANCE PROGRAM 1 inch = 1,000 feet BROOKWOOD ST BLVD NELTNOR JOLIET PURNELL 130 RD 129 DR 128 123 124 OAK DR CENTRAL WALK D WHITE O PROJECT LOCATIONS MAP O CANTIGNY CT WE PRINCE WISCONSIN C DG TT E ON WILLOW LN CT MAYFAIR 138 139 140 CTJUNIPEDAR PLUMCT LOCATIONS OF CONCRETE TO BE - REMOVED AND REPLACED ===== PDF PAGE 78 ===== [Extraction: embedded PDF text] th l~S. engineerin g group s e r vi c e a t t h e h i g h e s t g r o d e 0 7 62 shoreline drive suite 200 aurora, illinois 60504 MEMORANDUM TO: Dave Shah, P .E. - Assistant Director of Public Works, City of West Chicago FROM: Greg Ivanauski- Project Development Engineer, Thomas Enginee~ing Group, LLC DATE: April 22, 2025 RE: Bid Proposal Evaluation - 2025 Concrete Maintenance Program Thomas Engineering Group, LLC (TEG) prepares this memo to recommend a general contracting firm for performing roadway construction for the 2025 Concrete Maintenance Program. The work as shown in the bid documents consists mainly of sidewalk, curb, and concrete alley pavement removal and replacement. All quantities on the Schedule of Prices were used in determining the lowest responsible bidder. On Tuesday, April 22, 2025, staff received and opened three (3) bid proposals from interested firms. A bid tabulation worksheet with engineer's estimate (attached) was developed for evaluation of the bid values submitted at the bid opening. Staffs evaluation of bids included ·consideration of the base bid's unit prices and past performance with other municipalities and counties. Based on the attached tabulation, Strada Construction Co., from Addison, IL, submitted the lowest overall cost proposal. Below is a table depicting the bid results: CONTRACTOR BID SUBMITTAL OVERALL AMOUNT RANK Strada Construction Co. $66,869.00 1 Schroeder & Schroeder, Inc. $94,530.00 2 Alliance Contractors, Inc. $146,900.00 3 ENGINEER'S ESTIMATE $99,391.45 NA Strada Construction submitted a base bid proposal value of $66,869.00, approximately 32.7% lower than the engineer's estimated cost of $99 .391.45. The second lowest bid proposal, submitted by Schroeder & Schroeder, Inc., was $94,530.00. The City has previously contracted with Strada Construction to perform the City's Sidewalk Program. They were contracted to perform the City's Sidewalk Maintenance Program in 2024, which was performed satisfactorily. thomaJ· ttngl ===== PDF PAGE 79 ===== [Extraction: embedded PDF text] March 28, 2023 RE: ilid Proposal Evaluation~ 2023 Sidewalk and Curb Maintenance Program Page 2 of2 Strada Construction is registered by the Illinois Department of Transportation as a prequalified contractor. This information can be found on IDOT's website at: https://idot.illinois.gov/doing-business/procurements/construction-services/prequalification.html Therefore, TEG hereby recommends that the project's contract for the 2025 Concrete Maintenance Program be awarded to the lowest responsible bidder, Strada Construction Co., for a contract amount not to exceed $66,869.00. Should you have any questions or need additional information, please feel free to contact me. Enclosures: Engineer's Estimate with Bid Tabulation- 2025 Concrete Maintenance Program cc: 2025 Concrete Maintenance Program - Project File ===== PDF PAGE 80 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO Engineer's Estimate Strada Construction Co. Schroeder & Schroeder, Inc. Alliance Contractors, Inc. 2025 CONCRETE MAINTENANCE PROGRAM Bid Opening: April 22, 2025 @ 11:00 A.M. 1742 W. Armitage Court 7306 Central Park 1166 Lake Avenue Addison, IL 60101 Skokie, IL 60076 Woodstock, IL 60098 ITEM ESTIMATED DESCRIPTION UNIT UNIT PRICE TOTAL BID UNIT PRICE BID TOTAL BID UNIT PRICE BID TOTAL BID UNIT PRICE BID TOTAL NO. QUANTITY 1 P.C.C. SIDEWALK REMOVAL AND REPLACEMENT (5"- 6") SF 1,100 $18.71 $20,581.00 $12.50 $13,750.00 $18.50 $20,350.00 $22.00 $24,200.00 2 P.C.C. SIDEWALK REMOVAL AND REPLACEMENT (8") SF 100 $19.06 $1,906.00 $13.00 $1,300.00 $30.00 $3,000.00 $23.50 $2,350.00 3 P.C.C. PAVEMENT REMOVAL AND REPLACEMENT (6") FOOT 110 $185.00 $20,350.00 $112.50 $12,375.00 $150.00 $16,500.00 $216.00 $23,760.00 COMBINATION CONCRETE CURB & GUTTER REMOVAL AND 4 SF 130 $62.83 $8,167.90 ,(_ $45.00 $5,850.00 $125.00 $16,250.00 $108.00 $14,040.00 REPLACEMENT (M3.12. 86.12. 86.18) 5 CONCRETE CURB, TYPE B (SPECIAL) SF 20 $70.38 $1,407.~ , 'S5o.oo $1,000.00 $100.00 $2,000.00 $55.00 $1,100.00 6 TACTILE/ DETECTABLE WARNING SURFACE FOOT 40 $43.26 $1,73""-..: ~ $22.00 $880.00 $30.00 $1,200.00 $50.00 $2,000.00 7 SIDEWALK REMOVAL (NOT REPLACED) SY 50 $4.81 ~.St(" $5.00 $250.00 $10.00 $500.00 $1.00 $50.00 8 AGGREGATE BASE COURSE, TYPE B, 2-INCH SY 100 $6.18 --'Glll.iffl $9.00 $900.00 $0.10 $10.00 $2.50 $250.00 9 AGGREGATE BASE COURSE, TYPE B, 4-INCH SY 100 $9.27 ,s.121.00 $9.00 $900.00 $0.20 $20.00 $5.00 $500.00 10 P.C.C. DRIVEWAY PAVEMENT REMOVAL AND REPLACEMENT (6") SY 195 $149.69 $29,189.55 $108.00 $21,060.00 $120.00 $23,400.00 $200.00 $39,000.00 11 HMA DRIVEWAY PAVEMENT REMOVAL AND REPLACEMENT (4") SY 50 $87.89 $4,394.50 $80.00 $4,000.00 $60.00 $3,000.00 $345.00 $17,250.00 12 REMOVE AND REINSTALL BRICK PAVER EACH 20 $110.00 $2,200.00 $135.00 $2,700.00 $180.00 $3,600.00 $425.00 $8,500.00 13 TREE ROOT PRUNING EACH 10 $104.00 $1,040.00 $50.00 $500.00 $90.00 $900.00 $100.00 $1,000.00 14 VALVE VAULT, MANHOLE, INLET, CATCH BASIN TO BE ADJUSTED EACH 4 $1,000.00 $4,000.00 $1.00 $4.00 $500.00 $2,000.00 $350.00 $1,400.00 15 TOPSOIL, FURNISH AND PLACE, 4" SY 100 $13.00 $1,300.00 $5.00 $500.00 $8.00 $800.00 $65.00 $6,500.00 16 SODDING, SALT TOLERANT SY 50 $26.78 $1,339.00 $18.00 $900.00 $20.00 $1,000.00 $100.00 $5,000.00 As Corrected $99,391.45 $66,869.00 $94,530.00 $146,900.00 BID TOTAL As Read $66,869.00 $94,530.00 $146,900.00