===== PDF PAGE 41 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: 7.C. AGENDA ITEM NUMBER: Resolution No. 25-R-0036 — Contract Award — Strada Construction Co. for the 2025 Concrete Maintenance | COMMITTEE AGENDA DATE: May 1, 2025 Program in an Amount Not to Exceed $100,000.00. SOT IATA SSS TUE STOPS eS cates STAFF REVIEW: Mehul T. Patel, P.E., CFM, Director of Public Works SIGNATURE APPROVED BY CITY ADMINISTRATOR: Michael L. Guttman SIGNATURE. ITEM SUMMARY: The 2025 Concrete Maintenance Program will consist of intermittent removal and replacement of sidewalks, curb and gutters, and concrete alleyway pavement at various locations throughout the City. This annual Program also includes the construction of an aggregate base course for ground stabilization, inlet adjustments, detectable warning installation, tree root pruning, and restoration items, including hot- mix-asphalt and concrete driveway replacements, pavement patching, and sodding. The request for bids was advertised in the Daily Herald and on an online bidding platform, QuestCDN, on April 1, 2025, with the bid opening on April 22, 2025. The bid results are as follows: Bidder Bid Amount Overall Rank Strada Construction Co. $66,869.00 1 Schroeder & Schroeder, Inc. $94,530.00 2 Alliance Contractors, Inc. $146,900.00 3 Engineer’s Estimate $99,391.45 N/A Strada Construction Co. (Strada) of Addison, Illinois, submitted the lowest responsible bid of $66,869.00, which is $32,522.45 or approximately 33% lower than the engineer’s estimated cost of $99,391.45. Strada satisfactorily completed the City’s 2024 Sidewalk and Curb Maintenance Program, which was of a similar size and scope. Additionally, Strada is a registered prequalified contractor with the Illinois Department of Transportation. The FY 2025 budget includes $155,000.00 under Account No. 08-34-53-4863 for the Program. However, $55,000.00 was reallocated to cover the overage in the 2025 Bishop Street and Brown Street Water Main and Streets Rehabilitation Project, leaving $100,000.00 budgeted for the 2025 Concrete Maintenance Program. There are more sidewalk, curb, and concrete alleyway repairs throughout the City that can be included in this Program, but staff elected to bid a conservative amount of quantity to ensure the bid does not exceed the remaining budget. To take advantage of the favorable bid pricing and to address additional sidewalk, curb, and concrete alleyway repairs throughout the City, staff is recommending awarding the contract to Strada Construction Co. of Addison, Illinois, for the 2025 Concrete Maintenance Program, for an amount not to exceed $100,000.00. ACTIONS PROPOSED: Approve Resolution No. 25-R-0036 authorizing the Mayor to execute a construction contract with Strada ===== PDF PAGE 42 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO Construction Co. of Addison, Illinois, for the 2025 Concrete Maintenance Program in an amount not to exceed $100,000.00 (Bid Amount $66,869.00). COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 5-0 for approval.