===== PDF PAGE 38 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: __/- G. Resolution No. 25-R-0042 — Contract Award — F.E. Moran, Inc. for the Police Station HVAC Improvements Project for a Base Bid and Alternate No. 1 in an Amount Not to Exceed $923,000.00 and Reject Alternate No. 2 COMMITTEE AGENDA DATE: June 5, 2025 COUNCIL AGENDA DATE: June 16, 2025 STAFF REVIEW: Mehul T. Patel, P.E., CFM- Director of Public Works SIGNATURE ITEM SUMMARY: The Police Station HVAC Improvements Project includes improvements to the heating, ventilation, and air conditioning (HVAC) at the Police Station located at 325 Spencer Street, as denoted in the enclosed location map. The scope of the project for Base Bid includes select demolition, HVAC rooftop unit (RTU) equipment replacement, boiler replacement, roof patching, temperature controls, variable air volume(VAV) box reuse, acoustical ceilings repairs, painting, necessary electrical work, and other associated work to complete the project. Alternate 1 includes upgrading the existing VAV controls, associated control valves, and ceiling repairs as required. Alternate 2 includes replacement of VAV & fan-powered boxes and associated controls, complete with electrical wiring, and ceiling repairs as required. The Project is anticipated to be completed in November 2025, pending material availability. The Project was advertised for public bids in the Daily Herald and on an online bidding platform, QuestCDN, on April 29, 2025. A non-mandatory pre-bid meeting took place on-site on May 8, 2025. Staff opened bids on May 21, 2025, and below are the results: CONTRACTOR BASE BID AMOUNT ALT. NO. 1 AMOUNT ALT. NO. 2 AMOUNT BASE BID + ALT. NO. 1 AMOUNT BASE BID + ALT. NO. 2 AMOUNT BASE BID + ALT. NO. 1 RANK F.E. Moran, Inc. $720,000.00 $203,000.00 $465,000.00 $923,000.00 $1,185,000.00 Helm Mechanical $747,000.00 $238,000.00 $628,000.00 $985,000.00 $1,375,000.00 Voris Mechanical, Inc. $774,400.00 $233,500.00 $558,100.00 $1,007,900.00 $1,332,500.00 Amber Mechanical Contractors, Inc $883,800.00 $317,000.00 $647,800.00 $1,200,800.00 $1,531,600.00 1 Source Mechanical, Inc. $574,000.00 $196,000.00 $620,000.00 $770,000.00 $1,194,000.00 Commercial Mechanical, Inc. $604,000.00 $230,000.00 $603,000.00 $834,000.00 $1,207,000.00 BUDGETED AMOUNT $1,000,000.00 * Bid deemed irresponsible and incomplete upon contractor scope review. Bidder disqualified. Kluber, Inc., the City’s Phase II and III Architect, completed a contractor scoping review for the Base Bid and Alternate No. 1 with the first two apparent low bidders, 1 Source Mechanical, Inc. and Commercial Mechanical Inc. Upon scoping review with the two contractors, their submitted bids were found to be incomplete as both contractors failed to include the $85,000 allowance in their Base Bid as required by contract specification; therefore, the bids were deemed irresponsible and bids were disqualified. The third low bidder, F.E. Moran, Inc. of Northbrook, Illinois, submitted a complete and qualified bid in the amount of $923,000.00, which is $77,000.00 or 7.7% lower than the budgeted amount of $1,000,000.00. After scope discussions with Kluber, Inc. and Facilities Maintenance staff, the Base Bid plus Alternate No. 2 were not taken into consideration for the project, as the lowest bid from F.E. Moran, Inc. was $185,000.00 or 18.5% over the budget amount of $1,000,000.00 for the project. The FY 2025 Budget includes $1,000,000.00 under the Capital Projects Funds — Capital Outlay Account No. 08-34-53-4801 for the construction phase of the Project. Staff recommends awarding the Police Station HVAC Improvements Project to F.E. Moran, Inc. of Northbrook, Illinois, for a total contract amount not to exceed $923,000.00, which includes Base Bid and Alternate No. 1, and reject Alternate No. 2. ===== PDF PAGE 39 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO ACTIONS PROPOSED: Approve Resolution No. 25-R-0042 authorizing the Mayor to execute a Contract with the lowest qualified and responsible bidder, F.E. Moran, Inc. of Northbrook, Illinois, for a Base Bid and Alternate No. 1 contract amount not to exceed $923,000.00 and reject Alternate No. 2 for the Police Station HVAC Improvement Project. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 7-0 for approval.