===== PDF PAGE 5 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO HISTORICAL PRESERVATION COMMISSION AGENDA ITEM SUMMARY ITEM TITLE: Exterior Stair Replacement AGENDA ITEM NUMBER: 4.A151 W Washington Street (Wiant House) Wiant House Properties COMMISSION AGENDA DATE: 09-23-25 C.O.A. # 25-18 STAFF REVIEW: John Sterrett, City Planner SIGNATURE__________________________ ITEM SUMMARY: Wiant House Properties, owner of 151 W Washington Street in the Turner Junction Historic District, is requesting approval of a Certificate of Appropriateness to remove and replace the existing exterior stairs on the west side of the building. These stairs, which lead from the ground level to the unit on the second floor, have aged past their usefulness. No other modifications to the exterior of the building is proposed. Please see attached plans and photos for more information. The Wiant House is considered a candidate for local landmark status and is contributing to the Turner- Junction Historic District. Constructed in 1869, it consists of the Second Empire architectural style and was originally the home of Joel Wiant, an early settler of the City. The Wiant House remains an im- portant historical asset of the Historic District and the City overall. ACTION PROPOSED: Consideration of removal and replacement of the existing exterior stairs at 151 W Washington Street. ===== PDF PAGE 6 ===== [Extraction: OCR (rendered-page OCR)] TORRES GENERAL CONTRACTORS E-Mail:torresgeneralcontractors1@yahoo.com Phone:224-324-1537 September 4, 2025 Matthew Myers 151 West Washington St. West Chicago, IL 60185 Per our conversation the following work will be performed as follows: (Left side of building Porch) e Remove planks from upper porch. e Remove steps (2 sets) e Remove plank from lower platform between two sets of steps. e Remove stringers for steps. e Remove railing all (upper and lower) e Install new stringers for steps. e Install new planks upper and lower platforms. e Install new railing (Evermark 31 in x 1% in. Unfinished Hemlock Square Top Wood Baluster for Stairs Remodel) per customer (client) e All materials included. e All debris hauled away. Total cost Po Deposit “ae Balance upon completion or as needed NOTE: any additional work will be the owners’ responsibility, not Torres General Contractors, and must be paid before commencing work. ===== PDF PAGE 7 ===== [Extraction: OCR (rendered-page OCR)] NOTE: Customer (client) will provide permit NOTE: We are only replacing planks, steps, stringers, blisters, and railing, (NO FRAME OR STRUCTURE, NO POST) If you have any questions, please contact me at 224-324-1537. By signing this contract, you are bound to agree to all terms and conditions. Owners’ Signature Sincerely Victor Torres ===== PDF PAGE 8 ===== [Extraction: OCR (rendered-page OCR)] Serews DckHntE B" TayStaRFlAt-HEAb Platroan 2 STeps gg1 utezntls X12-STRN ASTGS a5 Lonbe Cauhre+ Raessune Screws: Deckmate 3"/2" Tan Star Flat Head Materials: Ground Contact Standard Pressure Treated Lumber 5/4"x6"x12' 2"x12'-Stringers ===== PDF PAGE 9 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 10 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 11 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 12 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 13 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.] ===== PDF PAGE 14 ===== [Extraction: no text detected] [No text detected on this page; page may be blank, photographic, or graphical.]