===== PDF PAGE 32 ===== [Extraction: OCR (rendered-page OCR)] CITY OF WEST CHICAGO CITY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: ZA. Contract for building demolition and site restoration for 321 Main Street and 411 Main Street with Anthem Excavation & FILE NUMBER: Demolition, Inc. COMMITTEE AGENDA DATE: Resolution No. 25-R-0068 COUNCIL AGENDA DATE: November 3, 2025 STAFF REVIEW: John Sterrett, Interim Community SIGNATUR Development Director APPROVED BY INTERIM CITY ADMINISTRATOR: Tia Messino SIGNATURE. ITEM SUMMARY: Staff seek to proceed with building demolition and site restoration for two residential properties located at 321 Main Street, and 411 Main Street. These properties are City owned and were acquired to assemble for future development consistent with the Central-Main Street Redevelopment Plan. These two properties are blighted and pose safety risks to the community. The properties have been evaluated and require significant investment to maintain and remedy the existing code violations. Staff invited proposals from four qualified firms. Two provided estimates, with Anthem Excavation & Demolition, Inc. providing site-by-site the lowest cost estimates. The added benefit with Anthem is they have on staff the ability to test for asbestos and the testing is included in their proposal, unlike the other firms. Utility shut offs have been disconnected with the remaining capping of water and sewer to be completed by the demo contractor. The cost figures are estimates as the presence and amount of substances like asbestos, which requires additional demolition precautions is unknown. Rizzi Excavating and Master Guy’s Demolition failed to provide proposals. Arthur J Lootens, Inc. proposed a total cost of $68,901.25. The total cost estimate for this work from Anthem Excavation & Demolition, Inc. is $64,000.00. Staff recommend the lowest qualified bidder. ACTIONS PROPOSED: Consideration of Resolution No. 25-R-0068 authorizing the demolition agreement for two residential properties, with Anthem Excavation & demolition, Inc. for an estimated $64,000.00 plus an amount within the City Administrator's signing authority to cover asbestos or other toxic clean-up costs. COMMITTEE RECOMMENDATION: This item did not go to committee and is being sent straight to City Council. Attachment A: Resolution 25-R-0068 Attachment B: Contract ===== PDF PAGE 33 ===== [Extraction: OCR (rendered-page OCR)] EXHIBITA RESOLUTION NO. 25-R-0068 A RESOLUTION AUTHORIZING THE MAYOR TO ENTER INTO A FUNDING AGREEMENT WITH ANTHEM EXCAVATION & DEMOLITION, INC. FOR DEMOLITION AND SITE RESTORATION OF 321 MAIN STREET, AND 411 MAIN STREET. BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized for the building demolition and site restoration between the City of West Chicago and Anthem Excavation & Demolition, Inc., attached hereto, and incorporated herein as Exhibit “A”, for an amount not to exceed $64,000.00 plus an unknown amount within the City Administrator’s signing authority for asbestos or toxin removal. APPROVED this day of November, 2025. AYES: NAYS: ABSTAIN: ABSENT: Mayor Daniel Bovey ATTEST: Executive Office Manager, Valeria Perez ===== PDF PAGE 34 ===== [Extraction: OCR (rendered-page OCR)] EXHIBIT B CONTRACT THIS AGREEMENT made and concluded this 29th day of October 2025 by and between the CITY OF WEST CHICAGO, hereinafter called the OWNER or the CITY and Anthem Excavation & Demolition, Inc. hereinafter called the CONTRACTOR. WITNESSETH that the OWNER and the CONTRACTOR in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1: WORK The CONTRACTOR shall perform all work and shall provide and/or furnish all labor, materials, equipment, tools, machinery and all other incidentals necessary to complete ina workmanlike manner all work required for demolition and removal of alt property buildings, concrete foundations, slabs, footings, driveways and walkways; backfill all properties with clean fill to 6” above grade, final grade then seed and straw blanket all properties and maintain erosion control during and after demolition at all properties listed below hereinafter called the PROJECT in these contract documents, all in strict accordance with the specifications and other contract documents as prepared by the City of West Chicago, dated October 29, 2025. e Residential Home at 321 Main St PIN 04-10-113-002 Bid Price $32,000.00 e Residential Home at 411 Main St PIN 04-10-119-002 Bid Price $32,000.00 **Asbestos sampling/testing will be completed at alt properties prior to demolition to determine if asbestos is present. Dan Bos is a licensed asbestos inspector. If asbestos is present at any of the properties, Anthem Excavation & Demolition, Inc. will provide a quote for the removal and legal disposal of any detected asbestos:** ARTICLE 2: CONTRACTOR COMPLIANCE The CONTRACTOR shall comply with all applicable laws, regulations and rules promulgated by any Federal, State, County, Municipal and/or other governmental unit or regulatory body now in effect or which may be in effect during the performance of the work. Included within the scope of the laws, regulations and rules referred to P.O BOVHSS eo Hess imatl 4 yratio. are all forms of traffic regulations, public se es g Office: (630) 250-8212 Fax: (630) 250-0150 ===== PDF PAGE 35 ===== [Extraction: OCR (rendered-page OCR)] utility and Intrastate and Interstate Commerce Commission regulations, Workmen’s Compensation Laws, Prevailing Wage Laws, the Social Security Act of the Federal Government and any of its titles, FEPC or FEOC statutory provisions and rules and regulations. ARTICLE 3: CONTRACT PRICE The OWNER will pay the CONTRACTOR for performance of all work under this contract, the final contract amount as computed in accordance with the prices as set forth in the CONTRACTOR’S PROPOSAL, hereto attached, and in accordance with all approved changes or modifications thereto. ARTICLE 4: CONTRACT CHANGES The prices as contained in the CONTRACTOR’S PROPOSAL will apply to additions or deductions from the work to be performed, and if unit prices are not contained in the proposal, then additions or deductions from the work shall be in accordance with authorized and approved change orders. ARTICLE 5: PAYMENTS The OWNER shall make, to the CONTRACTOR, progress payments and final payment in accordance with the provisions as set forth in the General Requirements portion of the contract documents. ARTICLE 6: CONTRACT TIME This contract work shall be completed by December 2, 2024 for all work. Work shall commence upon Notice to Proceed. The CONTRACTOR fully understands and agrees that the completion time is an essential part of this contract and for each day, calendar day, that elapses between the CONTRACT COMPLETION DATE and the date on which the work is completed, including the removal of all equipment and obstructions, the CONTRACTOR will pay to the OWNER, as liquidated damages, the sum as set forth in the General Requirements of the contract documents. ARTICLE 7: INSURANCE Successful bidders shall procure and maintain for the term of the agreement or contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the CONTRACTOR, his agents, representatives, employees or sub-contractors. The cost of such insurance shall be included in CONTRACTOR'S bid. A. Minimum Scope of Insurance Coverage shall be at least as broad as: 1. Insurance Services Office Commercial General Liability Occurrence form number CG0001 (Ed. 141/85) with the City named as additional insured; and 2. Insurance Services Office Business Auto Liability Coverage form number CA 0001 (Ed. 10/90) or newer as amended covering Automobile Liability, code 1 “any auto”; and 3. Worker’s Compensation as required by the Labor Code of the State of Illinois and Employer’s Liability Insurance. ===== PDF PAGE 36 ===== [Extraction: OCR (rendered-page OCR)] B. Minimum Limits of Insurance CONTRACTOR shall maintain limits NO LESS than: 1. Commercial General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. The general aggregate shall be twice the required occurrence limit. Minimum General Aggregate shall be no less that $2,000,000 or a project specific aggregate of $1,000,000. 2. Business Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. 3. Workers’ Compensation and Employers’ Liability: Workers’ Compensation limits as required by the Labor Code of the State of Illinois and Employers’ Liability limits of $1,000,000 per accident. 4. Builder’s Risk: Shall insure against “All Risk” of physical damage, including water damage (flood and hydrostatic pressure not excluded), on a completed value basis where applicable. C. Deductible and Self-Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officials, agents, volunteers and employees; or the CONTRACTOR shall procure a bond guaranteeing payment of losses and related investigation, claim administration and defense expenses. D. Policy Provisions The policies are to contain, or be endorsed to contain the following provisions: 1. General Liability and Automobile Liability Coverages a. The City, its officials, employees and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the CONTRACTOR; products and completed operations of the CONTRACTOR; premises owned, leased or used by the CONTRACTOR; or automobiles owned, leased, hired or borrowed by the CONTRACTOR. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officials, employees or volunteers. b. The CONTRACTOR’S insurance coverage shall be primary insurance as respects the City, its officials, agents, employees or volunteers. Any insurance or self-insurance maintained by the City, its officials, agents, employees or volunteers shall be excess of CONTRACTOR'S insurance and shall not contribute with it. ===== PDF PAGE 37 ===== [Extraction: OCR (rendered-page OCR)] c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officials, agents, employees or volunteers. d. Coverage shall state that CONTRACTOR'S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability. 2. Workers’ Compensation and Employers’ Liability Coverages The insurer shalt agree to waive all rights of subrogation against the City, its officials, agents, employees and volunteers for losses arising from work performed by CONTRACTOR for the City. 3. All Coverages Each insurance policy required by the clause shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days’ prior written notice by certified mail, return receipt requested, has been given to the City. E. Acceptability of Insurers Insurance is to be placed with insurers with a Best’s rating of no less that A: VII and licensed to do business in the State of Illinois. F. Verification of Coverage CONTRACTOR shall furnish the City with certificates naming the City, its officials, agents, employees and volunteers as an additional insured and with original endorsements affecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be received and approved by the City before work commences. The City reserves the right to request full certified copies of the insurance policies. G. Sub -Contractors CONTRACTORS shall include all sub-contractors as insured under its policies or shall furnish separate certificates and endorsements for each sub-contractor. All coverages for sub- contractors shall be subject to all of the requirements stated herein. ARTICLE 8: CONTRACT DOCUMENTS The Contract Documents which comprise the Contract between the OWNER and the CONTRACTOR, and which are as fully a part of this Contract as if herein set out verbatim, or, if not attached, as if attached hereto are as follows: 8.1 This Agreement 8.2 Request for Proposal Bid Package 8.3 Certificate of Insurance ===== PDF PAGE 38 ===== [Extraction: OCR (rendered-page OCR)] 8.4 CONTRACTOR’S Proposal 8.5 Modifications, including change orders duly executed after completion of this Agreement. ARTICLE 9: INDEMNITY HOLD HARMLESS PROVISION To the fullest extent permitted by law, the CONTRACTOR hereby agrees to defend, indemnify and hold harmless the city, its officials, agents and employees, against all injuries, deaths, loss, damages, claims, patent claims, suits, liabilities, judgments, cost and expenses, which may in anywise accrue against the city, its officials, agents and employees, arising in whole or in part or in consequence of the performance of this work by the CONTRACTOR, its employees, or sub-contractors, or which may in anywise result therefore, except that arising out of the sole legal cause of the city, its agents or employees, the CONTRACTOR shall, at its own expense, appear, defend and pay all charges of attorneys and all costs and other expenses arising therefore or incurred in connection therewith, and, if any judgment shall be rendered against the city, its officials, agents and employees, in any such action, the CONTRACTOR shall, at its own expense, satisfy and discharge the same. CONTRACTOR expressly understands and agrees that any performance bond or insurance policies required by this contract, or otherwise provided by the CONTRACTOR, shall in no way limit the responsibility to indemnify, keep and save harmless and defend the municipality, its officials, agents and employees as herein provided. ARTICLE 10: CONTRACTOR’S REPRESENTATIONS In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 10.1 CONTRACTOR has examined and carefully studied the Contract Documents and other related data identified in the Bid Invitation Package including “technical data.” 40.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the PROJECT. 40.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local law and regulations that may affect cost, progress, performance or furnishing of the PROJECT. 10.4 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the PROJECT as indicated in the Contract Documents. 40.5 CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. 10.6 CONTRACTOR has given the OWNER written notice of all conflicts, errors, ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and written ===== PDF PAGE 39 ===== [Extraction: OCR (rendered-page OCR)] resolution thereof by OWNER is acceptable to CONTRACTOR, that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the PROJECT. 10.7 CONTRACTOR warrants and represents that it is not in arrears to the OWNER upon debt or contract, and that it is not a defaulter as surety, contractor, or otherwise, to any person, firm or entity. 10.8 CONTRACTOR warrants and represents that CONTRACTOR is financially solvent, that CONTRACTOR has the financial resources necessary to perform and complete the PROJECT in accordance with the Contract Documents, that CONTRACTOR is sufficiently experienced and competent to complete the PROJECT and that the facts stated in its Bid and the information given by CONTRACTOR are true and correct in all respects. 10.9 CONTRACTOR warrants and represents that CONTRACTOR shall hereafter have no claim for payment or additional compensation based upon conditions at the work site or sites, or omissions, ambiguities or conflicts in the Contract Document and CONTRACTOR shall only be entitled to an extension of time as provided in the Contract Documents. 10.10 CONTRACTOR warrants and represents that the statements contained in the CONTRACTOR'S Certification attached hereto and by this reference incorporated herein and made a part hereof are true and correct. ARTICLE 11: MISCELLANEOUS 11.1 Neither the OWNER nor the CONTRACTOR shall, without prior written consent of the other Party assign or subcontract, in whole or in part, his interest under any of the Contract Documents and specifically, the CONTRACTOR shall not assign any money due or to become due without consent of the OWNER. 11.2 The OWNER and the CONTRACTOR each binds himself, his partners, successors, assigns and legal representatives to the other Party hereto in respect to all covenants, agreements and obligations contained in the Contract Documents. 11.3 The CONTRACTOR shall furnish any affidavit or certificate, in connection with the work covered by this agreement as provided by law. IT IS MUTUALLY UNDERSTOOD AND AGREED that the CONTRACTOR shall have full control of the ways and means of performing the work referred to above and that the CONTRACTOR or his/its employees, representative or subcontractors are in no sense employees of the OWNER, the CONTRACTOR and any Party employed by the CONTRACTOR bears the relationship of an independent contractor. ===== PDF PAGE 40 ===== [Extraction: OCR (rendered-page OCR)] IN WITNESS HEREOF, the Parties hereto have caused this AGREEMENT to be executed the day and year first above written in two counterparts, which for all intent, and purposes shall be considered as the original. OWNER: CITY OF WEST CHICAGO CONTRACTOR: Anthem Excavation & Demolition, Inc. By. a ee ee ee By: ry he jan Its: ite Preside Date: Date: ! o 24 | 2025" P.O. Box 496 Itasca, IL 60143