===== PDF PAGE 118 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO t INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY t ITEM TITLE: I I i I (Y1 ' AGENDA ITEM NUMBER: 14 Resolution No. 26-R-0012 - Contract Award - Era-Valdivia : Contractors, Inc. Water Treatment Plant Filter #1 COMMITTEE AGENDA DATE: February 5, 202p ', - COUNCIL AGENDA DATE: February 17, 2026Rehabilitation Project in the amount not to exceed $343,800.00 STAFF REVIEW: Mehul T. Patel, P.E., Director of Public Works SIGNATURE ' APPROVED BY CITY ADMINISTRATOR: Tia Messina SIGNATURE I ITEM SUMMARY: 'The Water Treatment Plant (WTP) was 'commissioned in 2006. Equipment in this environment has an average working life of 20 years. As equipment ages, its efficiency declines, maintenance costs increase, and the risk of unexpected failure rises, Unplanned breakdowns can disrupt production, damage surrounding systems, and create safety hazards for workers. To prevent these issues, it is essential to establish scheduled replacement plans based on the manufacturer's recommended service life, performance trends, and historical maintenance data. Proactive!~ replacing equipment prior to failure . not only reduces downtime and emergency repair costs but also ensures ' operational continuity, regulatory compliance, and workplace safety. This proactive approach allows organizations tp better allocate resources and extend the overall efficiency of their systems. ,, The Filter #1 Rehabilitation Project (Project) includes maintenance of the existing Filter #1 at the West Chicago Water, Treatment Plant. The Prciject will include full media replacement, sandblasting and painting of filter interior, painting of filter exterior, as well as any underdrain and metal rehab deemed necessary during construction. \ I ', The Project was advertised for public bids in the Daily Herald and via an online bidding platform, QuestCDN, dn January 6, 2026. An optional pre-bid meeting took place on January 15, 2026. Staff opened bids on January 27, 2026, and below are the results: " BASE BID OVERALL CONTRACTOR ' AMOUNT RANK Era-Valdivia 9ontractors, Inc. $ 343,800.00 1 Capital Industrial Coatings $ 433,370.00 2 Engineer Estimate $400,000.00 N/A Era-Valdivia Contractors, Inc. submitted the lowest bid in the amount of $343,800.00, which is 14.1 % lower than the Engineer's Estimate of $400,000. The FY 2026 Budget under the Water Treatment Plant - Other Capital Outlay ยท IAccount No. 06-34-48-4806 includes $400,000 for this Project. ,, I I Era-Valdivia Contractor5, successfully performed the Fremont Tower Rehabilitation Project for the City. Staff checkep 1, references for Era-Valdivia Contractors for similar types of projects which yielded positive feedback. Staff recommends awarding the Water Treatment Plant Filter #1 Rehabilitation Project to Era-Valdivia Contractors, lnc~!.of Chicago, Illinois, for a total contract amou,:it not to exceed $343,800.00. \ I ACTIONS PROPOSED: Approve Resolution No. 26-R-0012 authorizing the Mayor to execute a Contract with the lowest qualified, and responsible bidder, Era-Valdivia Contractors, Inc. of Chicago, Illinois, for the Water Treatment Plant Filter #1 Rehabilitation Project in the amount not to exceed $343,800.00 COMMITTEE RECOMMENDATION: ' ===== PDF PAGE 119 ===== [Extraction: embedded PDF text] RESOLUTION NO. 26-R-0012 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT WITH ERA-VALDIVIA CONTRACTORS, INC. OF CHICAGO, ILLINOIS, FOR THE WATER TREATMENT PLANT FILTER #1 REHABILITATION PROJECT IN THE AMOUNT NOT TO EXCEED $343,800.00 BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a Contract with the lowest responsible bidder, Era-Valdivia Contractors, Inc. of Chicago, Illinois, for the Water Treatment Plant Filter #1 Rehabilitation Project in the amount not to exceed $343,800.00, in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 17th day of February 2026. AYES: NAYES: ABSTAIN: ABSENT: Mayor Daniel Bovey ATTEST: Valeria Perez, Executive Office Manager