===== PDF PAGE 47 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO INFRASTRUCTURE COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: ____7.J.______ Resolution No. 26-R-0056 – Contract Award – Bee Liner Lean Services - Base Bid + Alternate 1 + Alternate 2 and Alternate 3 COMMITTEE AGENDA DATE: July 2, 2026 related to the West Chicago City Museum Building COUNCIL AGENDA DATE: July 20, 2026 Improvements Project at 132 Main St in an amount not to exceed $523,000.00 STAFF REVIEW: Mehul Patel, P.E., CFM, Director of Public Works SIGNATURE__________________________ APPROVED BY CITY ADMINISTRATOR: Viviana Ramirez SIGNATURE__________________________ ITEM SUMMARY: The City Museum, located at 132 Main St, is a three-story masonry building constructed in approximately 1884. The building served as West Chicago’s Town Hall and public safety headquarters before becoming the City Museum in 1975. It is listed on the National Register of Historic Places for its architectural and civic significance. The primary entrance to the ground floor is from Main St while a secondary entrance to the lower level is from Turner Ct. There have not been any major improvements made to this building in a very long time. The building is old, and identified concerns include, but are not limited to, deteriorating masonry façade, non-compliance with current Americans with Disabilities Act (ADA) requirements, rusting fire escape, lead paint, aging HVAC equipment, roof damages, deteriorating windows and doors, etc. All these concerns are expected due to the age of the building. The City executed a professional architectural design and construction management services contract with Kluber, Inc. in December of 2025. Kluber’s scope of work includes project management, data collection, preparation of design drawings and specification, bidding assistance, construction oversight, preparation of cost estimates, review pay estimates, shop drawing review and approval as well as general project administration. The scope of work includes: roof replacement, interior roof access hatch, evaluate and replace rooftop HVAC condensing units and associated piping as well as electrical components as part of the Base Bid. The window and door replacements (excluding the two Main St entrances and Turner Ct entrance) on various floors are included as Alternates 1 and 2 while fire escape repairs are listed as Alternate 3. The Project (COA 26-05) appeared in front of the Historical Preservation Commission (HPC) on March 24, 2026. The alternate bid options were prepared due to anticipated budgetary constraints. The Project was advertised for bids in the Daily Herald as well as on QuestCDN (an online bidding platform) on June 2, 2026. A mandatory onsite pre-bid was conducted on June 9, 2026. Five bids were received on June 23, 2026. Staalsen Construction Company, Inc. (SCCI) submitted the lowest responsible bid. A summary of the results is included below. Contractor Base Bid Alternate 1 Alternate 2 Alternate 3 Total w/Alt. Rank Staalsen Construction $184,040.00 $37,450.00 $70,620.00 $142,310.00 $434,420.00 1 Company, Inc. (Chicago, IL) * Bee Liner Lean Services $315,000.00 $42.000.00 $59,000.00 $107,000.00 $523,000.00 2 (Bridgeview, IL) Petra Builder Inc. (Naperville, $315,200.00 $31,500.00 $59,700.00 $172,500.00 $578,900.00 3 IL) AHAL Construction LLC $375,000.00 $38,000.00 $61,100.00 $135,500.00 $609,600.00 4 (Chicago, IL) Industrial Construction Services $441,182.00 $59,466.00 $108,273.00 $163,649.00 $772,570.00 5 (Des Plaines, IL) Estimate $467,000.00 N/A ===== PDF PAGE 48 ===== [Extraction: embedded PDF text] CITY OF WEST CHICAGO *Withdrew its bid after the bid opening On June 24, 2026, SCCI via email communicated to the City that it missed including the HVAC portion of the post in its base bid and offered a revised base bid price, which is not allowed. Consequently, SCCI submitted a letter to withdraw its bid from consideration which was granted. Bee Liner Lean Services (BLLS) is the next responsible low bidder. Kluber conducted a bid scope review of the remaining bidders. While noting previous schedule and performance concerns on unrelated projects involving Bee Liner Lean Services, Kluber determined the bid to be responsive and complete. Kluber did not make a contractor recommendation and indicated the award decision should be based on the City's evaluation of the bids. In 2026, Capital Projects Fund (08-34-53-4801) includes $400,000 for this Project. There are savings available in the same fund to cover the difference of $123,000. Staff recommends approval of the contract award. ACTIONS PROPOSED: Approve Resolution No. 26-R-0056 authorizing the Mayor to award a construction Contract to Bee Liner Lean Services of Bridgeview, Illinois for the Base Bid + Alternate 1 + Alternate 2 + Alternate 3 related to the West Chicago City Museum Building Improvements Project at 132 Main St in an amount not to exceed $523,000.00. COMMITTEE RECOMMENDATION: The Infrastructure Committee voted 6-0 for approval.