ITEM TITLE:
CITY OF WEST CHICAGO
INFRASTRUCTURE COMMITTEE
AGENDA ITEM SUMMARY
AGENDA ITEM NUMBER: Lf rl:::)r
Resolution No. 26-R-0063 - Contract Award - John Neri
Construction Company, Inc. -York Avenue Area Watermain
COMMITTEE AGENDA DATE: Aug 6, 2026
and Streets Rehabilitation Project in an Amount Not to
COUNCIL AGENDA DATE: Aug 17, 2026
Exceed $3,597,342.90
STAFF REVIEW: Mehul T. Patel, P.E., CFM, Director of Public Works
SIGNATURE. _________ _
APPROVED BY CITY ADMINISTRATOR: Viviana Ramirez
SIGNATURE ______ ___ _
ITEM SUMMARY:
In April 2025, the City was awarded Community Development Block Grant (CDBG) funding from DuPage County for
the York Avenue Area Watermain and Streets Rehabilitation Project (Project) in the amount not to exceed
$600,000.00. Subsequently, the City entered into an Intergovernmental Agreement (IGA) with DuPage County on
March 3, 2026, for acceptance of grant funds for the Project. The IGA requires the City to complete the Project and
expend the full CDBG funding amount by February 26, 2027.
The Project limits are on York Avenue between the dead end and Oakwood Avenue, Garden Street between
Washington Street and Grand Lake Boulevard, and lngalton Avenue between Washington Street and Grand Lake
Boulevard, as denoted in the enclosed location map. The net length of roadway improvements is approximately 5,708
feet or 1.08 miles. The scope of the Project includes the installation of a new 8" ductile iron water main and the
associated appurtenances, approximately 90 lead water service line replacements, pavement milling, hot-mix asphalt
(HMA) surface course installation, spot Portland Cement Concrete (PCC) curb and gutter removal and replacement,
mid-block PCC sidewalk removal and replacement, ADA sidewalk curb ramp, parkway restoration, manhole structure
repair and adjustments, thermoplastic pavement markings, and miscellaneous work necessary to complete the
Project.
The initial request for bids was advertised in the Daily Herald and on an online bidding platform QuestCDN on April
7, 2026. Staff opened bids on April 28, 2026. Due to bids being significantly over budget, all bids were rejected by
the City Council on May 18, 2026. Furthermore, staff discussed the project with the DuPage County Community
Development Commission to determine if there are mechanisms in place to request additional grant funds or to
reduce the Project scope to better align the Project with the approved FY 2026 budget. The request for additional
grant funding would require re-application and evaluation which would delay the Project by an additional two years,
pending County Board approval. The County and staff mutually agreed on the reduction of the scope to keep the
Project on schedule. Proposed changes in Project scope will require an amendment to the IGA, including a necessary
time extension to complete and close out the Project in FY 2027. The scope change and the amendment to the IGA
must be approved by the County Board before the City can award the Project, which is expected on August 11, 2026.
The County must also approve the apparent low bidder, which is also expected on or before August 11, 2026. The
County Board is expected to consider the amendment to the IGA and approval of the apparent low bidder on August
11, 2026. Staff anticipates those approvals will be obtained prior to City Council consideration on August 17, 2026.
The Project scope was reduced in concurrence with DuPage County, and the grant agreement was modified before
re-advertising in the Daily Herald and on an online bidding platform QuestCDN on July 7, 2026. Staff opened bids
on July 28, 2026 and the results of the bid opening are listed below.
PDF page 9
Extraction method: Embedded selectable PDF text.
CITY OF WEST CHICAGO
BASE BID
RANK
CONTRACTOR
SUBMITTAL
(BASE BID)
AMOUNT
John Neri Construction Company
$3,597,342.90
1
H. Linden & Sons Sewer & Water
$3,650,502.59
2
J. Congdon Sewer Service, Inc.
$3,789,188.52
3
C. Szabo Contracting, Inc.
$3,847,325.00
4
Performance Construction & EnQineerinQ
$3 858 000.00
5
Swallow Construction Co.
$3,999,999.99
6
Trine Construction Corp.
$4,284,529.91
7
ENGINEER'S EST/MA TE
$3,884,161.61
NIA
The FY 2026 budget includes $1,706,500.00 under the Capital Projects Fund Account No. 08-34-53-4807,
$1,409,200.00 under the Water Fund Account No. 06-34-47-4806, and $50,000.00 under the Sewer Fund Account
No. 05-34-43-4806, for a total of $3,165,700.00 for the construction of the Project. The responsible low bidder, John
Neri Construction Company's bid amount of $3,597,342.90 was $431,642.90 or approximately 13.63% over the
budget amount of $3,165,700.00. Staff believes that the increases in fuel cost, material costs, industry workload and
more than expected lead service lines within Project limits are the biggest factors for inflated bids. The Project is
designed to have a winter shutdown and complete construction in 2027. As such, the budget shortage of $431,642.90
will be appropriately budgeted in the FY 2027.
The CDBG agreement for this Project expires on February 26, 2027, and an extension will be required to complete
the construction. Staff have attempted to extend the expiration; however, the County has suggested that Project
construction must be progressing to consider an extension. Staff anticipates the extension will be granted.
Staff recommends approval of the award.
ACTIONS PROPOSED:
Approve Resolution No. 26-R-0063 authorizing the Mayor to execute a contract with John Neri Construction
Company, Inc. of Addison, Illinois for the York Avenue Area Watermain and Streets Rehabilitation Project in an
Amount Not to Exceed $3,597,342.90
COMMITTEE RECOMMENDATION:
PDF page 10
Extraction method: Embedded selectable PDF text.
RESOLUTION NO. 26-R-0063
A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A
CONTRACT WITH JOHN NERI CONSTRUCTION COMPANY, INC. OF
ADDISON, ILLINOIS FOR THE
YORK AVENUE AREA WATERMAIN AND STREETS REHABILITATION
PROJECT IN AN AMOUNT NOT TO EXCEED $3,597,342.90
BE IT RESOLVED by the City Council of the City of West Chicago, in
regular session assembled, that the Mayor is hereby authorized to execute a contract
with John Neri Construction Company, Inc. of Addison, Illinois for the York Avenue
Area Watermain and Streets Rehabilitation Project in an Amount Not to Exceed
$3,597,342.90, in substantially the form attached hereto and incorporated herein as
Exhibit "A".
APPROVED this 17th day of August 2026.
AYES:
NAYES:
ABSTAIN:
ABSENT:
Mayor Daniel Bovey
ATTEST:
Executive Office Manager Valeria Biggerstaff
PDF page 11
Extraction method: Embedded selectable PDF text.
PROJECT LOCATION MAP
York Avenue Area Water Main and Streets Rehabilitation Project
West Chicago, DuPage County, Illinois
Project Length: 5,709 feet or 1.081 miles
,,
{
Wontl.ill Avo
i,
~
g
r
~
!
.
.
..
.;
1
C
t Gra 11<I Lake B lvd
W Grand Lake Blvd
..
E Grand L~kc Bh1 d
~
(j")
;;;
..
I';
DI
.
a.
0
,:.
Turnor Ave
z
o,
(D
'\:.
::,
!a
E p 1na St
Falrvie~\I Ave
0;:tkwotJd
Cematar,,.·
5"
~
(0
;
DI
WYorkAve
;;;
~
~e
s
-t·
~ 1;"
::,
.. .,
,u .. • ,llff
.
]
I
"'
3
"'
E Mcconn-ell Ave
I
W,nlie!d Tow11~'1in
~
z
""
Of'ka::i
"
~
\
:,
;;·
·~
~
~
"~
~
_->o'Q,
E W_.i!'filng~oifS~
"). West Chicago
Legend:
,;,'
•
~~
... \
· o''"?)\/
.,,
-
Project Limits
1;.
•'
~~, ... ~'
'9~
,.,
-
Water Main Improvements
,ii $
1
"',
c,0
,ii
WosL Chicago
.
-
<J)
PDF page 12
Extraction method: Embedded selectable PDF text.
MEMORANDUM
th l,~
as.
engineering group
s e r v i c e a t t h e h i g h e s t g r a d e 6
762 shoreline drive
suite 200
aurora, illinois 60504
TO:
Dave Shah, P.E. -Assistant Director of Public Works, City of West Chicago
FROM:
Doug Masters - Municipal Operations Supervisor, Thomas Engineering Group, LLC
DATE:
July 29, 2026
RE:
Bid Proposal Evaluation - York Avenue Area Water Main and Streets Rehabilitation
Project (DuPage County, CDBG Project No. CD25-03)
Thomas Engineering Group, LLC (TEG) prepares this memo to pre-recommend a general
contracting firm for performing water main installation and roadway construction for the City's
York Avenue Area Water Main and Streets Rehabilitation Project (CD25-03). The work as shown
in the bid documents consists mainly of roadway resurfacing, water main replacement, sewer pipe
and structure repairs, and concrete flat work. All quantities on the Bid Schedule of Prices were
used in determining the lowest responsible bidder.
On Tuesday, July 28, 2026, staff received and opened seven (7) bid proposals from interested
firms.
A bid tabulation worksheet with engineer's estimate (attached) was developed for
evaluation of the bid values submitted at the bid opening. Staffs evaluation of bids included
consideration of the base-bid's unit prices and past performance with other municipalities and
counties. Based on the attached tabulation, John Neri Construction Co., Inc. (John Neri), from
Addison, IL, submitted the lowest overall base-bid cost proposal. Below is a table depicting the
bid results:
CONTRACTOR
BID SUBMITTAL
OVERALL
AMOUNT
RANK
John Neri Construction Co., Inc.
$3,597,342.90
1
H. Linden & Sons
$3,650,502.59
2
J. Congdon Sewer Service, Inc.
$3 789 188.52
3
C. Szabo Contracting, Inc
$3,847,325.00
4
Performance Construction & Engineering, LLC
$3,858,000.00
5
Swallow Construction Corp.
$3,999,999.99
6
Trine Construction Corp.
$4,284,529.91
7
ENGINEERS ESTIMATE
$3,884,161.61
NA
at th• highest grade•
PDF page 13
Extraction method: Embedded selectable PDF text.
July 29, 2026
RE: Bid Proposal Evaluation - York Avenue Area Water Main and Streets Rehabilitation Project (CD25-03)
Page 2 of2
John Neri submitted a base bid proposal value of$3,597,342.90, approximately 7.4% less than the
engineer's estimated cost of $3,884,161.61. The second lowest bid proposal, submitted by H.
Linden & Sons, was $3,650,502.59.
John Neri has been in the business for over 50 years and is well known in the construction business.
Additionally, Thomas Engineering Staff members have worked with John Neri on similar type
projects where they have performed in a satisfactory manner.
John Neri is registered by the Illinois Department of Transportation as a prequalified
subcontractor. This information can be found on IDOT's website.
Please keep in mind that this project is partially funded with federal grant funds through the
County's CDBG - Neighborhood Investment Program. As such, the County's approval of the
apparent low bidder is a County requirement before the City can formally award the project's
contract. I have contacted the County and provided them with their required post-bid opening
documents, and requested their approval to award John Neri the project's contract. I will notify
you as soon as the County corresponds back to me.
Once we receive the County's approval, TEO will be recommending that the project's contract for
the York Avenue Area Water Main and Streets Rehabilitation Project (CD25-03) be awarded to
the lowest responsible bidder, John Neri Construction Co., Inc., for a contract amount not to exceed
$3,597,342.90.
Should you have any questions or need additional information, please feel free to contact me.
Enclosures: Bid Tabulation with Engineer's Estimate with- York Avenue Area Water Main and
Streets Rehabilitation Project (CD25-03)
cc: - York Avenue Area Water Main and Streets Rehabilitation Project (CD25--03)-Project File
PDF page 14
Extraction method: Embedded selectable PDF text.
Project: York Avenue Area Watermain and Streets Rehabiliation Project (CD25-03)
Road District: City of West Chicago, DuPage County
Letting: July 28, 2026, 11:00 AM, 7 bids submitted
Prepared by: Thomas Engineering Group, LLC
ITEM
NO.
ESTIMATED
QUANTITY
UNIT
EST. QUANTITY
EST. UNIT PRICE
EST. BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
1
TREE ROOT PRUNING
EACH
15
190.96
$
2,864
150.00
$
2,250.00
$
120.00
$
1,800.00
$
110.00
$
1,650.00
$
150.00
$
2,250.00
$
125.00
$
1,875.00
$
350.00
$
5,250.00
$
157.50
$
2,362.50
$
2
EARTH EXCAVATION
CU YD
35
77.09
$
2,698
75.00
$
2,625.00
$
52.00
$
1,820.00
$
120.00
$
4,200.00
$
77.00
$
2,695.00
$
85.00
$
2,975.00
$
55.00
$
1,925.00
$
92.29
$
3,230.15
$
3
MAILBOX REMOVE AND REPLACE
EACH
10
316.50
$
3,165
300.00
$
3,000.00
$
50.00
$
500.00
$
200.00
$
2,000.00
$
250.00
$
2,500.00
$
250.00
$
2,500.00
$
200.00
$
2,000.00
$
1,110.70
$
11,107.00
$
4
INLET FILTERS
EACH
55
250.00
$
13,750
200.00
$
11,000.00
$
30.00
$
1,650.00
$
50.00
$
2,750.00
$
285.00
$
15,675.00
$
225.00
$
12,375.00
$
225.00
$
12,375.00
$
294.82
$
16,215.10
$
5
REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL
CU YD
100
61.80
$
6,180
45.00
$
4,500.00
$
52.00
$
5,200.00
$
85.00
$
8,500.00
$
34.00
$
3,400.00
$
30.00
$
3,000.00
$
68.00
$
6,800.00
$
42.00
$
4,200.00
$
6
POROUS GRANULAR EMBANKMENT
CU YD
100
66.26
$
6,626
60.00
$
6,000.00
$
65.00
$
6,500.00
$
85.00
$
8,500.00
$
51.00
$
5,100.00
$
40.00
$
4,000.00
$
45.00
$
4,500.00
$
52.50
$
5,250.00
$
7
TOPSOIL FURNISH AND PLACE, 4"
SQ YD
3,291
6.87
$
22,609
7.50
$
24,682.50
$
6.00
$
19,746.00
$
8.00
$
26,328.00
$
7.00
$
23,037.00
$
4.50
$
14,809.50
$
9.00
$
29,619.00
$
10.50
$
34,555.50
$
8
SEED, BLANKET, & FERTILIZER
SQ YD
3,291
11.93
$
39,262
8.00
$
26,328.00
$
6.00
$
19,746.00
$
8.00
$
26,328.00
$
7.00
$
23,037.00
$
7.75
$
25,505.25
$
5.00
$
16,455.00
$
7.35
$
24,188.85
$
9
AGGREGATE BASE COURSE, TYPE B, 4-INCH
SQ YD
215
12.27
$
2,638
7.50
$
1,612.50
$
10.00
$
2,150.00
$
16.00
$
3,440.00
$
16.00
$
3,440.00
$
13.00
$
2,795.00
$
13.00
$
2,795.00
$
19.75
$
4,246.25
$
10
AGGREGATE BASE COURSE, TYPE B, 6-INCH
SQ YD
150
17.34
$
2,601
9.75
$
1,462.50
$
25.00
$
3,750.00
$
20.00
$
3,000.00
$
26.00
$
3,900.00
$
15.00
$
2,250.00
$
17.00
$
2,550.00
$
22.90
$
3,435.00
$
11
BITUMINOUS MATERIALS (TACK COAT)
POUNDS
11,559
0.18
$
2,081
0.10
$
1,155.90
$
0.01
$
115.59
$
0.90
$
10,403.10
$
1.00
$
11,559.00
$
0.01
$
115.59
$
0.01
$
115.59
$
0.59
$
6,819.81
$
12
MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS
TON
18
419.06
$
7,543
220.00
$
3,960.00
$
200.00
$
3,600.00
$
450.00
$
8,100.00
$
450.00
$
8,100.00
$
200.00
$
3,600.00
$
250.00
$
4,500.00
$
626.88
$
11,283.84
$
13
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
SQ YD
310
153.12
$
47,468
32.00
$
9,920.00
$
22.00
$
6,820.00
$
26.00
$
8,060.00
$
27.00
$
8,370.00
$
20.00
$
6,200.00
$
22.00
$
6,820.00
$
17.40
$
5,394.00
$
14
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 (1.5")
TON
1,433
112.99
$
161,909
114.50
$
164,078.50
$
108.00
$
154,764.00
$
126.00
$
180,558.00
$
126.00
$
180,558.00
$
98.00
$
140,434.00
$
105.00
$
150,465.00
$
103.50
$
148,315.50
$
15
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH
SQ YD
280
118.45
$
33,166
135.00
$
37,800.00
$
125.00
$
35,000.00
$
99.00
$
27,720.00
$
99.00
$
27,720.00
$
105.00
$
29,400.00
$
135.00
$
37,800.00
$
123.38
$
34,546.40
$
16
PORTLAND CEMENT CONCRETE SIDEWALK 5 TO 6 INCH, SPECIAL
SQ FT
6,274
12.43
$
77,987
13.50
$
84,699.00
$
11.00
$
69,014.00
$
11.00
$
69,014.00
$
11.00
$
69,014.00
$
14.00
$
87,836.00
$
14.50
$
90,973.00
$
12.02
$
75,413.48
$
17
HOT-MIX ASPHALT SURFACE REMOVAL, 1-1/4 INCH
SQ YD
16,280
3.52
$
57,306
3.10
$
50,468.00
$
3.00
$
48,840.00
$
3.20
$
52,096.00
$
4.00
$
65,120.00
$
2.25
$
36,630.00
$
2.50
$
40,700.00
$
2.70
$
43,956.00
$
18
SIDEWALK REMOVAL
SQ FT
6,274
2.40
$
15,058
2.50
$
15,685.00
$
3.00
$
18,822.00
$
3.35
$
21,017.90
$
4.00
$
25,096.00
$
3.00
$
18,822.00
$
2.00
$
12,548.00
$
3.15
$
19,763.10
$
19
CLASS D PATCHES, TYPE I, 6 INCH
SQ YD
90
93.01
$
8,371
112.00
$
10,080.00
$
88.00
$
7,920.00
$
90.00
$
8,100.00
$
90.00
$
8,100.00
$
80.00
$
7,200.00
$
85.00
$
7,650.00
$
76.77
$
6,909.30
$
20
CLASS D PATCHES, TYPE II, 6 INCH
SQ YD
360
77.09
$
27,753
103.00
$
37,080.00
$
78.00
$
28,080.00
$
85.00
$
30,600.00
$
85.00
$
30,600.00
$
71.00
$
25,560.00
$
77.00
$
27,720.00
$
67.29
$
24,224.40
$
21
CLASS D PATCHES, TYPE III, 6 INCH
SQ YD
450
72.85
$
32,782
98.00
$
44,100.00
$
70.00
$
31,500.00
$
70.00
$
31,500.00
$
70.00
$
31,500.00
$
64.00
$
28,800.00
$
68.00
$
30,600.00
$
66.24
$
29,808.00
$
22
CLASS D PATCHES, TYPE IV, 8 INCH
SQ YD
2,734
75.00
$
205,050
64.00
$
174,976.00
$
58.00
$
158,572.00
$
70.00
$
191,380.00
$
70.00
$
191,380.00
$
48.00
$
131,232.00
$
53.00
$
144,902.00
$
84.49
$
230,995.66
$
23
DUCTILE IRON WATER MAIN, 6"
FOOT
375
172.57
$
64,715
124.00
$
46,500.00
$
135.00
$
50,625.00
$
150.00
$
56,250.00
$
181.00
$
67,875.00
$
100.00
$
37,500.00
$
150.00
$
56,250.00
$
104.89
$
39,333.75
$
24
DUCTILE IRON WATER MAIN, 8"
FOOT
3,743
185.66
$
694,916
182.00
$
681,226.00
$
140.00
$
524,020.00
$
175.00
$
655,025.00
$
284.00
$
1,063,012.00
$
185.00
$
692,455.00
$
165.00
$
617,595.00
$
124.01
$
464,169.43
$
25
HORIZONTAL DIRECTIONAL DRILL DUCTILE IRON WATER MAIN, CLASS 52, 8"
FOOT
300
200.00
$
60,000
240.00
$
72,000.00
$
240.00
$
72,000.00
$
220.00
$
66,000.00
$
311.00
$
93,300.00
$
250.00
$
75,000.00
$
225.00
$
67,500.00
$
292.09
$
87,627.00
$
26
WATER VALVES 8"
EACH
12
2,942.58
$
35,311
3,450.00
$
41,400.00
$
3,500.00
$
42,000.00
$
3,000.00
$
36,000.00
$
1,934.00
$
23,208.00
$
3,200.00
$
38,400.00
$
8,500.00
$
102,000.00
$
5,088.35
$
61,060.20
$
27
FIRE HYDRANTS TO BE REMOVED
EACH
11
950.00
$
10,450
900.00
$
9,900.00
$
1,000.00
$
11,000.00
$
350.00
$
3,850.00
$
970.00
$
10,670.00
$
550.00
$
6,050.00
$
500.00
$
5,500.00
$
598.23
$
6,580.53
$
28
FIRE HYDRANTS WITH AUXILIARY VALVE AND VALVE BOX
EACH
16
9,895.01
$
158,320
10,300.00
$
164,800.00
$
8,000.00
$
128,000.00
$
13,000.00
$
208,000.00
$
8,333.00
$
133,328.00
$
12,000.00
$
192,000.00
$
11,500.00
$
184,000.00
$
9,738.62
$
155,817.92
$
29
VALVE BOXES TO BE ADJUSTED
EACH
3
500.00
$
1,500
300.00
$
900.00
$
150.00
$
450.00
$
200.00
$
600.00
$
275.00
$
825.00
$
300.00
$
900.00
$
350.00
$
1,050.00
$
555.35
$
1,666.05
$
30
INLETS (REMOVAL AND REPLACEMENT), TYPE A, TYPE 11 FRAME AND GRATE
EACH
5
2,750.00
$
13,750
2,750.00
$
13,750.00
$
3,000.00
$
15,000.00
$
2,500.00
$
12,500.00
$
2,963.00
$
14,815.00
$
2,800.00
$
14,000.00
$
1,600.00
$
8,000.00
$
3,725.40
$
18,627.00
$
31
VALVE VAULTS, TYPE A, 5'-DIAMETER, TYPE 1 FRAME, CLOSED LID
EACH
15
5,250.00
$
78,750
6,500.00
$
97,500.00
$
5,000.00
$
75,000.00
$
2,000.00
$
30,000.00
$
5,920.00
$
88,800.00
$
4,200.00
$
63,000.00
$
500.00
$
7,500.00
$
7,030.33
$
105,454.95
$
32
STRUCTURE TO BE ADJUSTED W/ NEW TYPE 11 FRAME AND GRATE
EACH
5
1,250.00
$
6,250
875.00
$
4,375.00
$
500.00
$
2,500.00
$
1,300.00
$
6,500.00
$
1,254.00
$
6,270.00
$
1,500.00
$
7,500.00
$
1,000.00
$
5,000.00
$
1,515.35
$
7,576.75
$
33
FRAMES AND GRATES TO BE ADJUSTED, TYPE 11
EACH
14
500.00
$
7,000
450.00
$
6,300.00
$
500.00
$
7,000.00
$
1,040.00
$
14,560.00
$
758.00
$
10,612.00
$
800.00
$
11,200.00
$
1,000.00
$
14,000.00
$
875.35
$
12,254.90
$
34
FRAMES AND LIDS TO BE ADJUSTED, TYPE 1
EACH
16
500.00
$
8,000
425.00
$
6,800.00
$
500.00
$
8,000.00
$
985.00
$
15,760.00
$
2,320.00
$
37,120.00
$
800.00
$
12,800.00
$
800.00
$
12,800.00
$
875.35
$
14,005.60
$
35
VALVE VAULT ABANDONMENT
EACH
8
1,250.00
$
10,000
850.00
$
6,800.00
$
500.00
$
4,000.00
$
200.00
$
1,600.00
$
923.00
$
7,384.00
$
1,000.00
$
8,000.00
$
350.00
$
2,800.00
$
317.34
$
2,538.72
$
36
COMBINATION CONCRETE CURB AND GUTTER REM. AND REPL., TYPE B-6.12
FOOT
1,719
54.64
$
93,920
65.00
$
111,735.00
$
58.00
$
99,702.00
$
53.00
$
91,107.00
$
54.00
$
92,826.00
$
62.00
$
106,578.00
$
70.00
$
120,330.00
$
85.76
$
147,421.44
$
37
THERMOPLASTIC PAVEMENT MARKING - LINE 6"
FOOT
1,406
4.00
$
5,624
3.00
$
4,218.00
$
3.00
$
4,218.00
$
2.20
$
3,093.20
$
3.00
$
4,218.00
$
2.20
$
3,093.20
$
1.50
$
2,109.00
$
1.73
$
2,432.38
$
38
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
FOOT
520
6.00
$
3,120
4.75
$
2,470.00
$
4.00
$
2,080.00
$
3.80
$
1,976.00
$
5.00
$
2,600.00
$
3.80
$
1,976.00
$
3.50
$
1,820.00
$
4.16
$
2,163.20
$
39
THERMOPLASTIC PAVEMENT MARKING - LINE 24"
FOOT
320
12.00
$
3,840
9.40
$
3,008.00
$
11.00
$
3,520.00
$
8.50
$
2,720.00
$
10.00
$
3,200.00
$
8.50
$
2,720.00
$
6.00
$
1,920.00
$
7.04
$
2,252.80
$
40
EPOXY PAVEMENT MARKING - LINE 6"
FOOT
380
3.00
$
1,140
15.50
$
5,890.00
$
17.00
$
6,460.00
$
14.50
$
5,510.00
$
15.00
$
5,700.00
$
14.50
$
5,510.00
$
6.25
$
2,375.00
$
7.68
$
2,918.40
$
41
EPOXY PAVEMENT MARKING - LINE 24"
FOOT
30
10.00
$
300
42.00
$
1,260.00
$
60.00
$
1,800.00
$
35.00
$
1,050.00
$
35.00
$
1,050.00
$
35.00
$
1,050.00
$
21.00
$
630.00
$
25.60
$
768.00
$
42
STORM SEWER, RCP, CLASS A, TYPE 2, 12" OR LESS
FOOT
70
139.00
$
9,730
95.00
$
6,650.00
$
149.00
$
10,430.00
$
75.00
$
5,250.00
$
107.00
$
7,490.00
$
105.00
$
7,350.00
$
155.00
$
10,850.00
$
128.99
$
9,029.30
$
43
SANITARY SEWER SERVICE REMOVAL AND REPLACEMENT
FOOT
262
103.00
$
26,986
98.00
$
25,676.00
$
100.00
$
26,200.00
$
200.00
$
52,400.00
$
50.00
$
13,100.00
$
70.00
$
18,340.00
$
200.00
$
52,400.00
$
215.13
$
56,364.06
$
44
SANITARY SEWER SPOT REPAIR
EACH
2
13,500.00
$
27,000
3,600.00
$
7,200.00
$
10,000.00
$
20,000.00
$
7,000.00
$
14,000.00
$
7,828.00
$
15,656.00
$
12,000.00
$
24,000.00
$
15,000.00
$
30,000.00
$
5,957.83
$
11,915.66
$
45
STORM SEWER SPOT REPAIR
EACH
9
8,500.00
$
76,500
2,500.00
$
22,500.00
$
10,000.00
$
90,000.00
$
4,000.00
$
36,000.00
$
1,150.00
$
10,350.00
$
5,000.00
$
45,000.00
$
7,500.00
$
67,500.00
$
4,826.80
$
43,441.20
$
46
TACTILE/ DETECTABLE WARNING SURFACE
SQ FT
510
42.50
$
21,675
37.50
$
19,125.00
$
42.00
$
21,420.00
$
42.00
$
21,420.00
$
42.00
$
21,420.00
$
42.45
$
21,649.50
$
36.00
$
18,360.00
$
44.80
$
22,848.00
$
47
FIELD LOK GASKETS FOR DI WATER MAIN, 8"
EACH
59
195.00
$
11,505
200.00
$
11,800.00
$
200.00
$
11,800.00
$
120.00
$
7,080.00
$
165.00
$
9,735.00
$
155.00
$
9,145.00
$
175.00
$
10,325.00
$
198.40
$
11,705.60
$
48
TAPPING VALVES AND SLEEVES 12" x 8"
EACH
1
14,000.00
$
14,000
13,500.00
$
13,500.00
$
12,000.00
$
12,000.00
$
8,000.00
$
8,000.00
$
11,378.00
$
11,378.00
$
13,500.00
$
13,500.00
$
16,000.00
$
16,000.00
$
13,229.72
$
13,229.72
$
49
TAPPING VALVES AND SLEEVES 6" x 8"
EACH
3
9,500.00
$
28,500
9,750.00
$
29,250.00
$
10,000.00
$
30,000.00
$
7,000.00
$
21,000.00
$
8,999.00
$
26,997.00
$
11,500.00
$
34,500.00
$
10,500.00
$
31,500.00
$
10,400.82
$
31,202.46
$
50
TRENCH BACKFILL, SPECIAL
CU YD
3,125
32.89
$
102,775
65.00
$
203,125.00
$
61.00
$
190,625.00
$
0.01
$
31.25
$
1.00
$
3,125.00
$
50.00
$
156,250.00
$
64.00
$
200,000.00
$
116.15
$
362,968.75
$
51
EXPLORATION TRENCH (SPECIAL)
FOOT
50
35.00
$
1,750
50.00
$
2,500.00
$
42.00
$
2,100.00
$
20.00
$
1,000.00
$
40.00
$
2,000.00
$
70.00
$
3,500.00
$
90.00
$
4,500.00
$
111.07
$
5,553.50
$
52
STORM SEWER REMOVAL, 12" DIA. OR LESS
FOOT
114
35.00
$
3,990
8.00
$
912.00
$
5.00
$
570.00
$
80.00
$
9,120.00
$
33.00
$
3,762.00
$
12.00
$
1,368.00
$
0.25
$
28.50
$
37.02
$
4,220.28
$
53
CUT AND CAP EXISTING WATER MAIN
EACH
15
1,400.00
$
21,000
1,800.00
$
27,000.00
$
3,000.00
$
45,000.00
$
5,000.00
$
75,000.00
$
1,126.00
$
16,890.00
$
250.00
$
3,750.00
$
3,250.00
$
48,750.00
$
1,949.48
$
29,242.20
$
54
8" MECHANICAL JOINT PLUG
EACH
15
850.00
$
12,750
350.00
$
5,250.00
$
300.00
$
4,500.00
$
1,200.00
$
18,000.00
$
210.00
$
3,150.00
$
544.00
$
8,160.00
$
3,150.00
$
47,250.00
$
1,764.63
$
26,469.45
$
55
WATER MAIN REMOVAL [UP TO 10" DIAMETER]
FOOT
90
33.00
$
2,970
12.00
$
1,080.00
$
5.00
$
450.00
$
0.01
$
0.90
$
33.00
$
2,970.00
$
12.00
$
1,080.00
$
50.00
$
4,500.00
$
37.02
$
3,331.80
$
56
WATER MAIN LINE STOP 6"
EACH
1
6,500.00
$
6,500
8,700.00
$
8,700.00
$
4,000.00
$
4,000.00
$
4,850.00
$
4,850.00
$
6,109.00
$
6,109.00
$
13,000.00
$
13,000.00
$
10,250.00
$
10,250.00
$
0.01
$
0.01
$
57
WATER MAIN LINE STOP 8"
EACH
1
9,500.00
$
9,500
9,400.00
$
9,400.00
$
6,000.00
$
6,000.00
$
5,150.00
$
5,150.00
$
7,609.00
$
7,609.00
$
15,000.00
$
15,000.00
$
10,500.00
$
10,500.00
$
0.01
$
0.01
$
58
SHORT WATER SERVICE, SIZE 1"
EACH
44
3,570.64
$
157,108
3,600.00
$
158,400.00
$
3,500.00
$
154,000.00
$
3,800.00
$
167,200.00
$
2,457.00
$
108,108.00
$
3,000.00
$
132,000.00
$
10,560.00
$
464,640.00
$
3,714.75
$
163,449.00
$
59
LONG WATER SERVICE, SIZE 1"
EACH
44
4,599.00
$
202,356
4,800.00
$
211,200.00
$
4,500.00
$
198,000.00
$
4,200.00
$
184,800.00
$
3,885.00
$
170,940.00
$
7,500.00
$
330,000.00
$
10,625.00
$
467,500.00
$
4,967.96
$
218,590.24
$
60
PRIVATE WATER SERVICE LINE REPLACEMENT, SIZE 1/2”- 2”
EACH
88
8,500.00
$
748,000
5,800.00
$
510,400.00
$
6,000.00
$
528,000.00
$
7,000.00
$
616,000.00
$
4,731.00
$
416,328.00
$
6,000.00
$
528,000.00
$
1.00
$
88.00
$
9,705.97
$
854,125.36
$
61
CONTROLLED LOW-STRENGTH MATERIAL, SPECIAL
CU YD
21
500.00
$
10,500
225.00
$
4,725.00
$
200.00
$
4,200.00
$
200.00
$
4,200.00
$
610.00
$
12,810.00
$
300.00
$
6,300.00
$
125.00
$
2,625.00
$
269.88
$
5,667.48
$
62
SANITARY MANHOLES TO BE ADJUSTED W/ NEW TYPE 1 F&CL
EACH
20
1,800.00
$
36,000
1,150.00
$
23,000.00
$
2,000.00
$
40,000.00
$
1,300.00
$
26,000.00
$
3,074.00
$
61,480.00
$
1,700.00
$
34,000.00
$
1,250.00
$
25,000.00
$
1,693.58
$
33,871.60
$
63
CONCRETE CURB, TYPE B (SPECIAL)
FOOT
120
50.00
$
6,000
72.00
$
8,640.00
$
58.00
$
6,960.00
$
44.00
$
5,280.00
$
44.00
$
5,280.00
$
70.00
$
8,400.00
$
75.00
$
9,000.00
$
70.40
$
8,448.00
$
64
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
L SUM
1
126,000.00
$
126,000
37,500.00
$
37,500.00
$
350,000.00
$
350,000.00
$
150,075.17
$
150,075.17
$
31,000.00
$
31,000.00
$
207,435.96
$
207,435.96
$
135,000.00
$
135,000.00
$
15,360.00
$
15,360.00
$
65
VALVE BOX FOR 8" VALVE
EACH
1
700.00
$
700
750.00
$
750.00
$
425.00
$
425.00
$
800.00
$
800.00
$
325.00
$
325.00
$
510.00
$
510.00
$
350.00
$
350.00
$
951.22
$
951.22
$
66
VALVE BOXES TO BE REMOVED
EACH
4
500.00
$
2,000
150.00
$
600.00
$
50.00
$
200.00
$
50.00
$
200.00
$
200.00
$
800.00
$
150.00
$
600.00
$
125.00
$
500.00
$
92.56
$
370.24
$
67
CONNECTION TO EXISTING WATER MAIN (DRY, NON-PRESSURE)
EACH
9
4,500.00
$
40,500
3,500.00
$
31,500.00
$
4,000.00
$
36,000.00
$
7,000.00
$
63,000.00
$
4,277.00
$
38,493.00
$
5,000.00
$
45,000.00
$
9,500.00
$
85,500.00
$
8,573.94
$
77,165.46
$
68
HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 3"
SQ YD
680
55.00
$
37,400
56.00
$
38,080.00
$
45.00
$
30,600.00
$
40.00
$
27,200.00
$
40.00
$
27,200.00
$
38.00
$
25,840.00
$
50.00
$
34,000.00
$
61.32
$
41,697.60
$
69
HOT-MIX ASPHALT DRIVEWAY PAVEMENT REMOVAL
SQ YD
680
20.00
$
13,600
16.50
$
11,220.00
$
10.00
$
6,800.00
$
25.00
$
17,000.00
$
42.00
$
28,560.00
$
14.00
$
9,520.00
$
24.00
$
16,320.00
$
14.87
$
10,111.60
$
70
CONCRETE REMOVAL (SPECIAL)
SQ YD
450
38.00
$
17,100
22.00
$
9,900.00
$
25.00
$
11,250.00
$
30.00
$
13,500.00
$
31.00
$
13,950.00
$
18.00
$
8,100.00
$
14.00
$
6,300.00
$
44.80
$
20,160.00
$
71
CONSTRUCTION LAYOUT AND RECORD DRAWINGS
L SUM
1
15,000.00
$
15,000
42,000.00
$
42,000.00
$
20,000.00
$
20,000.00
$
12,000.00
$
12,000.00
$
14,000.00
$
14,000.00
$
3,000.00
$
3,000.00
$
15,000.00
$
15,000.00
$
17,664.00
$
17,664.00
$
72
TEMPORARY INFORMATION SIGN
L SUM
1
500.00
$
500
2,100.00
$
2,100.00
$
500.00
$
500.00
$
1,200.00
$
1,200.00
$
2,000.00
$
2,000.00
$
250.00
$
250.00
$
3,500.00
$
3,500.00
$
3,520.00
$
3,520.00
$
73
STORM SEWER (WATER MAIN REQUIREMENTS) 12 INCH OR LESS
FOOT
81
95.00
$
7,695
115.00
$
9,315.00
$
148.00
$
11,988.00
$
80.00
$
6,480.00
$
131.00
$
10,611.00
$
175.00
$
14,175.00
$
165.00
$
13,365.00
$
126.38
$
10,236.78
$
74
STORM SEWER (WATER MAIN REQUIREMENTS) 24 INCH OR LESS
FOOT
100
85.00
$
8,500
175.00
$
17,500.00
$
300.00
$
30,000.00
$
95.00
$
9,500.00
$
191.00
$
19,100.00
$
180.00
$
18,000.00
$
450.00
$
45,000.00
$
170.45
$
17,045.00
$
75
MANHOLE LID ADJUSTING RINGS (SPECIAL)
EACH
9
100.00
$
900
350.00
$
3,150.00
$
1,000.00
$
9,000.00
$
945.00
$
8,505.00
$
55.00
$
495.00
$
550.00
$
4,950.00
$
200.00
$
1,800.00
$
217.60
$
1,958.40
$
76
BOLLARD REMOVAL
EACH
4
350.00
$
1,400
200.00
$
800.00
$
50.00
$
200.00
$
150.00
$
600.00
$
35.00
$
140.00
$
250.00
$
1,000.00
$
115.00
$
460.00
$
1,388.38
$
5,553.52
$
St. Charles, IL 60174
Carol Stream, IL 60188
West Chicago, IL 60185
217 West John Street
170-A Alexandra Way
Trine Construction Corp.
1041 Trine Court, Suite A
West Chicago, IL 60185
722 East South Street
BID TABULATION
ENG. ESTIMATE
770 Factory Road
490 Topsoil Drive
Unit D; Plano, IL 60545
J. Congdon Sewer Service, Inc.
Swallow Construction Corp.
John Neri Construction Co., Inc.
H. Linden & Sons
331 Elliot Avenue
Addison, IL 60101
Performance Construction &
Engineering, LLC
Plano, IL 60545
C. Szabo Contracting, Inc
Page 1 of 2
PDF page 15
Extraction method: Embedded selectable PDF text.
Project: York Avenue Area Watermain and Streets Rehabiliation Project (CD25-03)
Road District: City of West Chicago, DuPage County
Letting: July 28, 2026, 11:00 AM, 7 bids submitted
Prepared by: Thomas Engineering Group, LLC
ITEM
NO.
ESTIMATED
QUANTITY
UNIT
EST. QUANTITY
EST. UNIT PRICE
EST. BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
BID UNIT PRICE
BID TOTAL
St. Charles, IL 60174
Carol Stream, IL 60188
West Chicago, IL 60185
217 West John Street
170-A Alexandra Way
Trine Construction Corp.
1041 Trine Court, Suite A
West Chicago, IL 60185
722 East South Street
BID TABULATION
ENG. ESTIMATE
770 Factory Road
490 Topsoil Drive
Unit D; Plano, IL 60545
J. Congdon Sewer Service, Inc.
Swallow Construction Corp.
John Neri Construction Co., Inc.
H. Linden & Sons
331 Elliot Avenue
Addison, IL 60101
Performance Construction &
Engineering, LLC
Plano, IL 60545
C. Szabo Contracting, Inc
77
BOLLARDS
EACH
4
2,500.00
$
10,000
2,400.00
$
9,600.00
$
1,000.00
$
4,000.00
$
500.00
$
2,000.00
$
500.00
$
2,000.00
$
1,400.00
$
5,600.00
$
2,250.00
$
9,000.00
$
2,348.38
$
9,393.52
$
78
MOBILIZATION
LSUM
1
30,000.00
$
30,000
75,000.00
$
75,000.00
$
50,000.00
$
50,000.00
$
258,000.00
$
258,000.00
$
313,000.00
$
313,000.00
$
232,080.00
$
232,080.00
$
250,096.90
$
250,096.90
$
256,780.03
$
256,780.03
$
Engr's Estm
$3,884,161.61
As Corrected
3,597,342.90
$
As Corrected
3,650,502.59
$
As Corrected
3,789,188.52
$
As Corrected
3,847,325.00
$
As Corrected
3,858,000.00
$
As Corrected
3,999,999.99
$
As Corrected
4,284,529.91
$
As Read
3,597,342.90
$
As Read
3,650,502.59
$
As Read
3,790,838.52
$
As Read
3,847,325.00
$
As Read
3,858,000.00
$
As Read
3,999,999.99
$
As Read
4,284,530.00
$
BID TOTAL