===== PDF PAGE 97 ===== CITY OF WEST CHICAGO INFRASTRUCTURE COMMITT~E AGENDA ITEM SUMMARY ITEM TITLE: AGENDA ITEM NUMBER: 4 , -r ---- -- Resolution No. 26-R-0073 - Contract Award - Hoerr Construction, Inc. for the 2026 Sanitary Sewer Rehabilitation COMMITTEE AGENDA DATE: September 3, 2026 Project in an Amount Not to Exceed $308,460.00 COUNCIL AGENDA DATE: September 21, 2026 STAFF REVIEW: Mehul T. Patel, P.E., Director of Public Works SIGNATURE _________ _ APPROVED BY CITY ADMINISTRATOR: Viviana Ramirez SIGNATURE. _________ _ ITEM SUMMARY: In 2022, the Infrastructure Committee recommended that staff discontinue the annual Sanitary Sewer Evaluation Survey (SSES) and put these funds toward addressing the defects identified in previous SSES Studies using methods of trenchless rehabilitation, manhole lining, and five feet of lateral lining within the public rights-of-way and easements. The 2026 Sanitary Sewer Rehabilitation Project (Project) will include a trenchless method of installing cured-in- place pipe (CIPP) inside existing 730' of 8" vitrified clay pipe sewer on Forest Avenue and Hazel Street. These locations were previously identified during prior SSES studies. The Project will also include lining of two sanitary sewage lift station wet wells at Lift Station #2 (2552 Meadowlark Drive) and Lift Station# 7 (410 Coolidge Avenue). The wet well is the receiving structure for sewage before it is pumped into a forcemain. Both wet wells are made of steel. Sewage is corrosive and the steel material is starting to fail at these sites. The wet well structures will be lined with an epoxy resin. This will stop corrosion and preserve the structures by providing a new surface. Traditionally, the City has contracted with an engineering firm for bidding and construction oversight of this type of Project. To reduce costs and maximize the rehabilitation budget, staff reviewed various options for the City's Project including joint bidding and cooperative purchasing. Joint bidding is when two or more governmental entities or departments collaborate to submit a single bid for a project, often to combine resources and potentially lower costs. Cooperative purchasing, like joint bidding involves multiple local government entities pooling their resources and purchasing power to buy goods and services at lower prices through pre-negotiated contracts. These approaches leverage the collective buying power of multiple agencies, allowing them to access better pricing and terms. One such national joint purchasing cooperative is OMNIA. Its purpose and objective are designed to provide benefits and efficiencies by complying with state bidding requirements in identifying qualified vendors of commodities, goods and services. The County of DuPage, IL Department of Procurement issued RFP 23-065-PW on October 19, 2023, to establish a national cooperative contract for Trenchless Rehabilitation and Maintenance of Pipeline Infrastructure through OMNIA Cooperative Purchasing (executive summary attached). On November 28, 2023, proposals were received from three vendors. The proposals were evaluated by an evaluation committee. Using the evaluation criteria established in the RFP, the committee elected to enter negotiations with Hoerr Construction, Inc. and proceeded with contract award upon successful completion of negotiations. The contract award is for an initial three-year agreement from February 13, 2024, through February 12, 2027, with the option to renew for two (2) one-year periods through February 12, 2029. The prices established in this contract are available to other government agencies. It should be noted, Hoerr Construction, Inc. has completed similar projects for the City in 2023, 2024, and 2025 with satisfactory performance. After reviewing the cooperative purchasing option, staff determined the bid specifications prepared by County of DuPage meet industry standards and conform with the City's Project. The City will be using the following items for its Project. ===== PDF PAGE 98 ===== CITY OF WEST CHICAGO • CIPP (gravity & pressure) • Cleaning & Televising • Grouting • T-Lining & Lateral Lining • Spray-Applied Lining • Sectional Point Repair Liners • Bypass Pumping Hoerr Construction, Inc. provided a quote for $308,460 for this Project. To account for potential unforeseen conditions during construction, a $30,000 project contingency is included in this total. The FY 2026 budget includes $500,000.00 under the Sewer Fund Account No. 05-34-43-4806 for the Project. Staff recommends awarding the contract to Hoerr Construction, Inc. of Goodfield, Illinois, for the 2026 Sanitary Sewer Rehabilitation Project for an amount not to exceed $308,460.00. ACTIONS PROPOSED: Approve Resolution No. 26-R-0073 authorizing the Mayor to execute a construction contract to Hoerr Construction, Inc. of Goodfield, Illinois, for the 2026 Sanitary Sewer Rehabilitation Project in an amount not to exceed $308,460.00. COMMITTEE RECOMMENDATION: ===== PDF PAGE 99 ===== RESOLUTION NO. 26-R-0073 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE A CONSTRUCTION CONTRACT WITH HOERR CONSTRUCTION, INC. OF GOODFIELD, ILLINOIS, FOR THE 2026 SANITARY SEWER REHABILITATION PROJECT IN AN AMOUNT NOT TO EXCEED $308,460.00 BE IT RESOLVED by the City Council of the City of West Chicago, in regular session assembled, that the Mayor is hereby authorized to execute a construction contract with Hoerr Construction, Inc. of Goodfield, Illinois, for the 2026 Sanitary Sewer Rehabilitation Project in an amount not to exceed $308,460.00, in substantially the form attached hereto and incorporated herein as Exhibit "A". APPROVED this 21 st day of September 2026. AYES: NAYES: ABSTAIN: ABSENT: Mayor Daniel Bovey ATTEST: Valeria Biggerstaff, Executive Office Manager ===== PDF PAGE 100 ===== Hoerr Construction, Inc. 1416 County Road 200 N P.O. Box 65 Office: (309) 691-6653 Fax: (309) 508-7990 Goodfield, IL 61742 PROJECT PROPOSAL & CONTRACT Description of Work: West Chicago 2026 CIPP & Lift Station Rehabilitation Project Address: Various Locations in West Chicago Quote #: West Chicago 2026 8/25/2026 Customer: Rocky Horvath City of West Chicago 475 Main St. West Chicago, IL 60185 rhorvath@westchicago.org 630-293-2258 HOERR CONSTRUCTION, INC. to Provide: • Cured in Place Pipe (CIPP) for 8" & 42" sewer Engineer: City of West Chicago Owner: City of West Chicago o Cleaning and televising of pipe prior to lining o All necessary equipment and labor for liner inversion & cure per ASTM F1216 o Reinstatement of service connections • Laterals that can be positively identified by sewer camera as plugged or capped will not be reinstated. All other laterals will be opened unless otherwise directed in writing by the owner o Post-lining televising with digital video report o Bypassing of normal sewer flows for CIPP, dry weather work only o Notices to residents and property owners in the cleaning area to be passed at least one day prior to cleaning and lining by Owner • Epoxy rehabilitation for 2 sanitary lift stations as provided by the City of West Chicago o +\-40.2 Vertical Feet (VF) of rehab o Preparation/ blasting of structures prior to rehab o 250 mils Raven 405 Epoxy spray applied to the interior of structures o Raven 405 UFS Epoxy applied to the structure floors o All traffic control, as needed o Bypass pumping • The scope has not been defined in detail for this item so the allowance price for this item reflects a conservative scenario. With more advanced planning, we would expect to be able to complete this for less than the allowance given. Page 1 of 5 Email: info@hoerr.com - Website: hoerr.com Customer Initials: --- ===== PDF PAGE 101 ===== Hoerr Construction, Inc. 1416 County Road 200 N P.O. Box 65 Goodfield, IL 61742 HOERR CONSTRUCTION, INC. to Provide (continued): o Disposal of debris created during lift station prep work • Work to be completed during normal work week, M-F daytime operations • Certificate of insurance with Hoerr Construction's standard coverages • Certified payrolls, if required or requested City of West Chicago AKA "Owner" to Provide: • For CIPP: o Access to pipe being lined to include but not limited to the following: Office: (309) 691-6653 Fax: (309) 508-7990 • All traffic control beyond flashing yellow lights and cones that are normally carried on Hoerr trucks • Access for truck-sized equipment to all manhole lids associated with lining o Excavation point repairs needed due to collapsed pipe, lodged equipment, or obstructions unable to be removed with conventional sewer cleaning equipment and methods o Dump site for debris removed from pipes during sewer cleaning operations • For Lift Station Rehab: o Draining of structure o Removal of interior equipment or pumps as much as possible without deconstructing welded or permanent features o Access to manholes to include but not limited to the following: • Access for truck-sized equipment to all manhole lids associated with rehab • For All Operations: o Water for cleaning operations, hydrant fill -----------U--t\UV-Jl&ess.arv ... ha.nds.,_p.ermits. fe.es,Jiceoses, association dues...s.p __ .....,..._._u,.u ....... .....,,.._ ________ _ coverage & conditions (Kotecki waivers will not be accepted), surface restoration, erosion control, deflection testing, air testing, or staking • Standard performance and payment bond can be provided at 2% of total quote Page 2 of 5 Email: info@hoerr.com - Website: hoerr.com Customer Initials: __ _ ===== PDF PAGE 102 ===== Project Pricing CIPP Pricing: • Mobilization: Hoerr Construction, Inc. 1416 County Road 200 N P.O. Box 65 Goodfield, IL 61742 • +/-730' of 8" CIPP@ $49.00/LF: • +/-10 Lateral Reinstatements in 8" pipe@ $120.00/EA: Total CIPP Project: Lift Station Rehab Pricing: • Lift Station #2 - 72" Dia. x 23.2 VF o Mobilization - 1 EA @ $8,950: o Bypass Pumping of LS #2 @ Lump Sum Allowance: o 72" Dia. 250 mils Raven Application - 23.2 VF@ $1950/VF: Lift Station #2 Total Price: • Lift Station #7 - 48" Dia. x 17 VF o Mobilization - 1 EA@ $8,950: o Bypass Pumping of LS #7@ Lump Sum Allowance: o 48" Dia. 250 mils Raven Application -17.0 VF@ $1950/VF: Lift Station #7 Total Price: Total Lift Station Rehab Project: Project Contingency: Total 2026 Sewer Rehab Project: Project will be billed using OMNIA price items as follows: • Mobilization (Item 507) • 8" CIPP (Items 2, 27, 57,71) • Bypass Pumping (Items 92,93,97,102,107,110,114,115,116) • Manhole Top Remove & Replace (Item 174@ 100 SY each) • Lateral Reinstatements (Items 37.1 & 37.2) • Manhole Coating (Item 381 @ 1,414 SF & 1,036 SF) Office: (309) 691-6653 Fax: (309) 508-7990 $ 15,200.00 $ 35,770.00 $ 1,200.00 $ 52,170.00 $ 8,950.00 $ 65,000.00 $ 45,240.00 $119,190.00 $ 8,950.00 $ 65,000.00 $ 33,150.00 $107,100.00 $226,290.00 $ 30,000.00 $308,460.00 Thank you for the opportunity to quote this pipe lining project. If this proposal is accepted, regular payments to be made to Hoerr Construction, Inc. monthly as the work progresses, as billed, for the units that were installed. If a separate contract format is used, this document shall be included as an exhibit. This proposal may be retracted if not accepted within 30 days. If you have any questions, please call me at (309) 691-6653. //##.✓--z---::~ Mike Kaisner, Estimator/PM Hoerr Construction, Inc. Email: info@hoerr.com - Website: hoerr.com Page 3 of 5 Customer Initials: --- ===== PDF PAGE 103 ===== Hoerr Construction, Inc. 1416 County Road 200 N P.O. Box65 □PP Goodfield, IL 61742 Acceptance of Proposal Office: (309) 691-6653 Fax: (309) 508-7990 The pricing, specifications, and conditions noted above and on the following pages of this proposal are agreeable and are accepted in full. By signing below, you have our authorization to complete the work as specified. Customer Authorized Signature Customer Printed Name Acceptance Date Customer Company Name Page 4 of 5 Email: info@hoerr.com - Website: hoerr.com Customer Initials: __ _ ===== PDF PAGE 104 ===== Hoerr Construction, Inc. 1416 County Road 200 N P.O. Box 65 Office: (309) 691-6653 Fax: (309) 508-7990 Goodfield, IL 61742 GENERAL CONDITIONS THESE GENERAL CONDITIONS {"General Conditions") are incorporated by reference into Contractor's Proposal (being the front page of this document). The services and work defined to be performed by Contractor in the attached proposal {the "Services") shall be governed by these General Conditions. Section 1. CONTRACT DOCUMENTS. To the extent of any conflict between or among the contract documents, the documents shall be interpreted in the following order: (1) Contractor's Proposal, (2) these General Conditions, and (3) any other document. Section 2. LIENS AND LIEN WAIVERS. a. Any lien waivers required of Contractor and/or its subcontractors/suppliers may be conditional lien waivers, effective only upon the receipt of the funds identified in the lien waiver and after the check has been properly endorsed and paid by the bank upon which it is drawn. b. Customer shall promptly furnish to Contractor, at the request of Contractor, information necessary and relevant for Contractor to evaluate and perfect its lien rights, including, but not limited to, the legal descrlption(s) of the site, the name address of the record owner of each parcel of the site and Customer's interest in each identified parcel. Section 3. DELAYS. ~r shall not be responsible for any delay or failure to perform if such delay or failure is caused by an occurrence beyond Contractor's reasonable control, including, but not limited to, site conditions, hazardous wastes, Customer's breach of a term of this Agreement, including, but not limited to, failure to timely pay invoices in full, acts or omissions of Customer or anyone for whose acts or omissions Customer may be responsible, including, but not limited to, other Customer contractors, government or other regulatory orders, rules or decisions, changes in applicable law, war, terrorism, sabotage, riots or theft, labor shortages, material shortages, lockouts, embargoes or strikes, fire or explosion or flood, wind, rain, weather or other act of God. The time to complete the work shall be extended for a period of time at least equal to the delay caused by a foregoing event. Customer shall be liable to Contractor for any and all costs, expenses and damages incurred by Contractor that arise from or in any way relate to a foregoing event giving rise to the delay. Section 4. CUSTOMER'S RESPONSIBILITIES. a. If requested, Customer shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the project, and a written legal description of the site. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements, and adjoining property and structures; adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and necessary data pertaining to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths. All the information on the survey shall be referenced to a project benchmark. b. Customer assumes full responsibility to ascertain that the site is properly zoned for the construction of the project and its intended use. c. Customer shall disclose, to the extent known to Customer, the results and reports of prior tests, inspections or investigations conducted for the Services or relating to the site. Customer shall give prompt notice to Contractor whenever it becomes aware of any development, event or condition that materially or adversely affects the site or scope, timing or cost of the work. d. Those services, information, surveys, reports and other information provided by Customer under this Section are of the essence of the Services and these General Conditions and Contractor shall be entitled to rely upon the accuracy and completeness thereof. e. In the event Customer provides labor for Contractor in the performance of the Services, Customer will indemnify and hold harmless Contractor against any and all actual, threatened or alleged claims, citations, fines, forfeitures, penalties, liens, causes of actions, suits, demands, damages, liabilities, losses, costs and expenses, including, but not limited to, attorneys' fees arising out of any damages or injuries related to the work performed by such laborers provided by Customer. Customer shall maintain insurance relating to the Customer's performance of any Services by Customer and shall also waive all rights of subrogation against Contractor arising out of the work under Contractor's Proposal and these General Conditions. f. Both Contractor and Customer shall comply with all federal, state and local permits, laws, codes, ordinances, rules, decisions and regulations applicable to the Services or this agreement, including, but not limited to, such codes, ordinances, rules, decisions and regulations relating to labor, employment, prevailing wage, permit restrictions, job site safety and the environment. Both parties shall also comply with all specific safety requirements promulgated by any governmental authority, including, without limitation, the requirements of the Occupational Safety Health Act of 1970, inclusive, and all successors and amendments thereto, and all standards and regulations that have been or shall be promulgated by the parties hereunder or agencies which administer such safety acts. g. Operation and control of Customer's equipment shall be Customer's responsibility. Section S. INDEMNIFICATION. _a _____ Customer shall indemnify, defend and hold Contractor and its directors, officers, employees, agents, successors and assigns harmless from and against any and all loss, damage, injury, claim, liability, demand, cost or expense, including, but not limited to attorneys' fees, attributable to personal injury, bodily injury or property damage, including loss of use thereof, arising out of or relating to this Agreement, the site, the Services or the work, but only to the extent caused in whole or in part by Customer's breach of this Agreement or the negligence or willful acts or omissions of Customer or anyone for whose acts or omissions Customer may be liable, including, but not limited to, Customer's architect, engineer or any other contractor on the project. b. Contractor shall indemnify, defend and hold Customer and its directors, officers, employees, agents, successors and assigns harmless from and against any and all loss, damage, injury, claim, liability, demand, cost or expense, including, but not limited to attorneys' fees, attributable to personal injury, bodily injury or property damage, Including loss of use thereof, arising out of or relating to the work, but only to the extent caused by the negligent or willful acts or omissions of Contractor or anyone for whose acts or omissions Contractor may be liable. Section 6. SITE CONDffiONS. a. Contractor is not responsible for subsurface or concealed physical conditions at or around the site. If subsurface or physical conditions are encountered at the site that differ from those expressly indicated in the contract documents or are of an unusual nature that differ from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the contract documents, then notice by the observing party shall be given to the other party of such conditions. If such conditions increase the time to perform the work, then the time to complete the work will be equitably adjusted in a duration at least equal to the delay caused by such condition(s). If such conditions increase the cost to perform the work, then the contract price shall be equitably adjusted in an amount at least equal to the costs and expenses arising out of or relating to such condition(s). b. Contractor is not responsible for any liability loss, or expense, including but not limited to damage caused by any pre-existing condition of the property, where the condition existed prior to the start of Contractor's Services. Customer shall be responsible for loss of equipment, caused by the pre-existing conditions of the job site. Section 7. HAZARDOUS MATERIALS. Any and all debris is represented by Customer to be non-hazardous and to require no manifesting or special permitting. Contractor is not responsible for hazardous wastes or material (as such terms are defined under federal law) that may exist at the site. Contractor assumes no possession or control for hazardous waste that may be present at the site. Customer acknowledges that Contractor has played no part in and assumes no responsibility for generation or creation of any hazardous waste that may exist at the site. Nothing in this Agreement shall be construed or Interpreted as requiring Contractor to assume the status of, and Customer acknowledges that Contractor does not act in the capacity nor assume responsibilities of Customer or others, as an owner, handler, generator, operator, transporter or arranger in the treatment, storage, disposal or transportation of any hazardous waste. Contractor shall have no responsibility for the transportation, storage, treatment or disposition of contaminated or potentially contaminated hazardous waste, whether directly or indirectly generated from Contractor's performance of the work. Customer shall be responsible for the disposal of any such waste materials and shall be the named party on any such waste manifests. Notwithstanding anything to the contrary in this Agreement, Customer shall defend, indemnify and hold Contractor and its officers, directors, employees, agents, consultants, contractors, successors and assigns harmless from any and all claims arising out of or relating to the presence of hazardous wastes at the site or the treatment, storage, transportation or disposition of the same. Section 8. WAIVER OF CONSEQUENTIAL DAMAGES. Customer and Contractor mutually waive against the other party any and all indirect, consequential and incidental damages arising out of or relating to the work or this Agreement, including a breach thereof. Section 9. INSURANCE. During the construction of any said project, Contractor and Customer agree to maintain insurance coverage covering the work for the Services and activity of each party. Page 5 of 5 Email: info@hoerr.com Website: hoerr.com Customer Initials: ----